VAMED provides services for hospitals and other healthcare facilities. The company, headquartered in Vienna, Austria, was founded in 1982. Since 1984, VAMED Engineering has been active in the areas of real estate development, facility and hospital management.
To date, the company has completed around 1,000 projects in more than 98 countries.
PROJECTS
1,000 projects
96 countries
over the last
40 years
SELECTION OF PROJECTS
Africa
Cacuaco General Hospital
Angola
Client
Ministry of Health
Key data
Beds: 322
Gross Floor Area: 27,000 m²
Implementation: 26.07.2024
The Project
The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.
Viana General Hospital
Angola
Client
Ministry of Health
Key data
Beds: 322
Gross Floor Area: 25,000 m²
Implementation: 23.04.2024
The Project
The Viana General Hospital, located in Luanda, Angola is being developed by VAMED in a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, as well as all construction works and installation.
This new hospital is located on a land of around 25,000 m2, and consists of a 3-storey main building and 5 smaller satellite buildings that function autonomously (the Maintenance Building, the Morgue Building, the Laundry Building, the Cafeteria Building and the Technical Building), essentially made up of ground floor and roof structures. In terms of services, it has five operating theatres, eight inpatient wards, a centralised diagnostic centre, an emergency service, obstetrics and gynaecology, paediatrics, orthopaedics and general medicine.
Military Regional Hospital of Cabinda, Angola
Angola
Client
Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola
Key data
Beds: 102
Gross Floor Area: 11,450 m²
Implementation: 2022-2026
The Project
Military Regional Hospital of Huambo
Angola
Client
Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola
Key data
Beds: 201
Gross Floor Area: 17,300 m²
Implementation: 2022-2026
The Project
The Regional Military Hospital of Huambo, developed under a turn-key contract, includes concept, design, construction, equipment, training, and 4 years of management support. Spanning 17,300 m², it serves both military and civilian needs, and is a benchmark for advanced care in central Angola. Its integrated diagnostic hub houses MRI, multi-slice CT, digital X-ray with fluoroscopy, and high-definition ultrasound, enabling rapid, precise diagnostics. With 201 beds, the hospital offers specialized services in emergency, obstetrics, dialysis, rehab, and surgery. It addresses historic gaps in local healthcare, reducing reliance on distant facilities. Together with a new Maternity Hospital and extensive training programs, it forms a resilient medical network that elevates care in the region.
Military Regional Hospital of Luena
Angola
Client
Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola
Key data
Beds: 102
Gross Floor Area: 11,450 m²
Implementation: 2022-2026
The Project
The Luena Regional Military Hospital, under a turn-key contract including design, construction, equipment, training, and 4 years of support, is set to open in 2026. Built on 11,450 m², it addresses the healthcare needs of Angola’s eastern region. It features an advanced diagnostic hub with CT, digital X-ray with fluoroscopy, high-resolution ultrasound, and in-house lab services, enabling accurate, rapid diagnoses. With 102 beds, the hospital includes emergency and specialized wards to provide timely care. Located in remote Moxico province, it minimizes long-distance travel for treatment. Training programs and co-management strategies ensure sustainable performance. This facility marks a major step forward in healthcare access for Angola’s eastern frontier.
Maternity Upgrade Kenya – 20 Sites
Kenya
Client
Ministry of Health
Key data
Beds: 177 beds + 26 delivery beds
Gross Floor Area: 6,420 m2 total (across 20 facilities)
Implementation: N/A
The Project
To reduce maternal and newborn mortality, Kenya’s Ministry of Health is modernizing 20 maternity and neonatal units across 12 counties, with support from VAMED. The project enhances access to skilled care for low-income families, minimizing travel and costs. VAMED is responsible for design, construction, refurbishment, equipment supply, and staff training, with 36 months of maintenance included. The facilities will receive 177 beds, 26 delivery beds, 7 operating theatres, and essential equipment like incubators, ventilators, and oxygen generators. Training covers hygiene, emergency care, and includes a four-week observership in Finland. This initiative strengthens rural healthcare and improves maternal and newborn outcomes.
Eleven 40-bed Hospitals in Ashanti, Eastern Region and Greater Accra Regions and one Polyclinic in Brong-Ahafo
Ghana
Client
Ministry of Health
Key data
Beds: 470 (40 for each Hospital and 30 for the Polyclinic)
Gross Floor Area: total sqm of 11 Hospitals + 1 Polyclinic: 26,200 m²
Implementation:
The Project
The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.
4 Regional Hospitals
Guinea
Client
Ministry of Health
Key data
Beds: 100-110
Gross Floor Area: 10,000-12,000 m²
Implementation: 2023
The Project
With four hospitals delivered in 2022, VAMED France is now the leading healthcare operator in Côte d’Ivoire. A Memorandum of Understanding (MoU) has been signed for two new General Hospitals and one Regional Hospital, currently in the final decision phase. In 2023, VAMED HQ (Vienna), VAMED France (Paris), and VAMED Côte d’Ivoire (Abidjan) jointly advanced three new hospital projects under a “Protocole d’Accord” with the Ministry of Health. Each facility (100–110 beds, 10,000–12,000 m²) will include Emergency, Outpatient, Internal and Surgical Medicine, Pediatrics, Gynecology, a Metabolic Diseases Unit, MEQ (incl. CT), and Labs. Preliminary designs were validated in November 2023; final negotiations are underway.
Urology and Nephrology Centre of Excellence - Korle Bu Teaching Hospital
Ghana
Client
Key data
Beds: 101 + 30 Dialysis Stations
Gross Floor Area: 7,800 m²
Implementation: 07.2021 – 12.2023
The Project
The Urology and Nephrology Centre of Excellence at Korle Bu Teaching Hospital spans 7,800 m² across three blocks and delivers advanced inpatient and outpatient care. It features 101 beds, 4 ICU beds, and 3 operating theatres—two major ones next to the CSSD for efficient logistics, and a minor one in the outpatient area. The facility includes 30 Hemodialysis stations with separate access and a cutting-edge imaging unit with CT, fluoroscopy, ultrasound, and lithotripter. A 100-seat teaching room supports clinical training. Completed in 30 months and handed over in December 2023, it includes further staff training and technical management by VAMED through 2026. This centre meets critical urology and nephrology needs in an underserved region with top-tier care.
2 new General Hospitals and 1 Regional Hospital
Ivory Coast
Client
–
Key data
Beds: 200 (each hospital)
Gross Floor Area: N/A m²
Implementation: 2024
The Project
VAMED France, in consortium with EIFFAGE and EGIS, is developing four 200-bed Regional Hospitals in Guinea. Phase 1 includes Kindia and Labé; optional Phase 2 covers Kankan and N’zerekore. VAMED France is responsible for medical equipment—engineering, procurement, delivery, installation, commissioning, and a one-year warranty. Site preparation has begun in Kindia, with formal commencement expected in March 2024. Beyond supplying MEQ, VAMED was selected as the healthcare expert for the project, providing technical advisory support across the full value chain of these turnkey hospital developments.
5 District Hospitals + 1 Polyclinic
Ghana
Client
Ministry of Health, Ghana
Key data
Beds: 370
Gross Floor Area: 27,090 m²
Implementation: 2020
The Project
Construction of 5 district Hospitals in Ghana’s northern region in Sawla, Tolon and Buipe, Eastern Region in Somanya and Volta Region in Wheta as well as a polyclinic in Northern Region in Bamboi.
Ghana 20 Polyclinics
Ghana
Client
Ministry of Health, Ghana
Key data
Beds: 375
Gross Floor Area: 18,250 m²
Implementation: 2017
The Project
Turnkey construction of 15 polyclinics:
– 5 in the Northern Region (Janga, Karaga, Chereponi, Tatale, Kpandai).
– 5 in the Upper West Region (Babile, Hain, Ko, Lambussie, Wechiau).
– 5 in Brong-Afaho (Booma, Kwatire, Nkrankwanta, Techimantia, Wamfie).
– 5 in Greater Accra Province (Adentan, Ashiaman, Bortianor, Oduman, Sege).
Key data
Gushegu District Hospital
Ghana
Client
Ministry of Health
Key data
Beds: 86
Gross Floor Area: 5,724 m²
Implementation: 2007
The Project
Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.
Libreville Hôpital d'Instruction des Armees Omar Bongo Ondimba (HIAOBO)
Gabon
Client
Ministry of Defense, Gabon
Key data
Beds: 130
Gross Floor Area: 14,400 m²
Implementation: 2005
The Project
Turn-key Implementation, total operation. Design, engineering, construction, equipping, installation, testing and commisioning, extensions ongoing.
Begoro District Hospital
Ghana
Client
Ministry of Health
Key data
Beds: 60
Gross Floor Area: 5,000 m²
Implementation: 2003
The Project
Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.
District Hospital Abuja
Nigeria
Client
Federal Capital Development Authority
Key data
Beds: 60
Gross Floor Area: –
Implementation: 2001
The Project
Design, construction, mechanical and electrical building works, supply and installation of medical equipment and furniture, testing and commissioning. Training of users and maintanence staff including maintenance for a 6 month period.
Rural Health Centers Ethiopia
Ethiopia
Client
Ministry of Health, Ethiopia; Foreign Ministry, Austria
Key data
Beds: 30
Gross Floor Area: –
Implementation: 1991
The Project
Turn-key.
Rural Hospitals
Nigeria
Client
Ministry of Health, Nigeria
Key data
Beds: 44
Gross Floor Area: –
Implementation: 1991
The Project
Medical equipment.
Asia
Songinokhairkhan District Hospital
Mongolia
Client
Ministry of Health
Key data
Beds: 200
Gross Floor Area: 18,000 m²
Implementation: 2017 – 2021
The Project
Goroka Regional Hospital
Papua New Guinea
Client
Ministry of Health
Key data
Beds: 300
Gross Floor Area: 7,980 m²
Implementation: 2014 – 2018
The Project
Friendship Hospital - Vientiane
Laos
Client
Ministry of Health
Key data
Beds: 150
Gross Floor Area: 24,000 m²
Implementation: 2015 – 2019
The Project
Radiotherapy Center Friendship Hospital - Vientiane
Laos
Client
Ministry of Health
Key data
Beds: N/A
Gross Floor Area: 1700 m² (net)
Implementation: 2014 – 2017
The Project
The Friendship Hospital in Vientiane is one of Laos’ leading public healthcare and teaching facilities. As part of the national hospital upgrade program, VAMED delivered the country’s first MRI and implemented the first radiotherapy department during Phase 1. The project included a turnkey radiotherapy building, equipment supply, and extensive training and start-up support. The hospital specializes in orthopaedics, neurology, and kidney disease treatment, and serves as Laos’ primary university teaching and research hospital—marking a significant advancement in the nation’s medical capabilities.
Affiliated People´s Hospital of Inner Mongolia University
China
Client
Affiliated People´s Hospital of Inner Mongolia University
Key data
Beds: –
Gross Floor Area: –
Implementation: 2015
The Project
Supply and installation of medical equipment.
Hue Central Hospital
Vietnam
Client
Ministry of Health Vietnam
Key data
Beds: –
Gross Floor Area: –
Implementation: 2014
The Project
Planning, supply and installation of medical equipment
Hefei No 2 People´s Hospital
China
Client
Hefei No. 2 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ningxia Hui Autonomous Region People‘s Hospital Nanchang
China
Client
Ningxia Hui Autonomous Region People‘s Hospital Nanchang
Key data
Beds: 2.630
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Xuancheng People’s Hospital
China
Client
Xuancheng People’s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
National Cancer Institute (NCI)
Malaysia
Client
JV Kiara Teratai / IJM Construction, Malaysia
Key data
Beds: 252
Gross Floor Area: 75,000 m²
Implementation: 2011 – 2013
The Project
Xundian No.1 People´s Hospital
China
Client
Xundian No.1 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The project
Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.
Yingtan People´s Hospital
Yingtan
Client
Yingtan People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ziyang People´s Hospital
China
Client
Ziyang People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ziyang No.2 People´s Hospital
China
Client
Ziyang No. 2 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Shijiazhuang No.3 Hospital
China
Client
Shijiazhuang No.3 Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Qinghai Woman & Chrildren´s Hospital
China
Client
Qinghai Woman & Children´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Nanchang Hospital of Integrated Traditional and Western Medicine
China
Client
Nanchang Hospital of Integrated Traditional and Western Medicine
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Provincial People‘s Hospital Changsha
China
Client
Provincial People‘s Hospital Changsha
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Zigong No. 1 People’s Hospital
Zigong
Client
Zigong No. 1 People’s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Supply of medical equipment
Hexian People‘s Hospital
China
Client
Hexian People‘s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of medical equipment.
Chongqing Three Gorges Vocational College
China
Client
Chongqing Three Gorges Vocational College
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of educational equipment.
Yingcheng People´s Hospital
China
Client
Yingcheng People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of medical equipment.
Wuan Hospital
China
Client
Wuan Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2011
Key data
Supply and installation of medical equipment.
Mahosot Hospital
Laos
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2011
The Project
Planning, supply and installation of medical equipment.
Sarawak International Medical Center
Malaysia
Client
Sarawak International Medical Center.
Key data
Beds: 200
Gross Floor Area: 60,000 m²
Implementation: 2010
The Project
Project Management, planning, supply and installation of medical equipment and hospital IT-system, Training of Hospital personnel, Maintenance for 2 years.
Wushan People´s Hospital
China
Client
Wushan People´s Hospital
Key data
Beds: 120
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment.
Qingyang People´s Hospital
China
Client
Quingyang People´s Hospital
Key data
Beds: 500
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment
Puhua Jinson Clinic
China, Beijing
Client
–
Key data
Beds: 30
Gross Floor Area: 1,700 m²
Implementation: 2010
The Project
Consultancy Services: design, functional planning.
Potalai Medical Spa
Thailand
Client
Photaria Co Ltd
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Consulting & project management for improvement and extension of SPA services.
Universiti Teknologi Mara (UiTM)
Malaysia
Client
TRIplc Resources (TRI) Sdn Bhd
Key data
Beds: 400
Gross Floor Area: – m²
Implementation: 2019 – 2021
The Project
The new Universiti Teknologi MARA (UiTM) Hospital in Puncak Alam, Selangor, Malaysia, is a 400-bed teaching and tertiary care hospital for undergraduate and postgraduate medical studies. Managed by the Ministry of Education, the campus includes academic facilities and accommodations. UiTM Hospital also serves as a general hospital for tertiary care referrals. VAMED’s scope included the supply, installation, and commissioning of medical and non-medical equipment, along with a 3-year comprehensive maintenance service. Despite COVID-19 challenges, the project was completed on schedule, supporting Malaysia’s medical education and healthcare infrastructure.
Laibin Municipal People’s Hospital
China
Client
Laibin Municipal People’s Hospital
Key data
Beds: 336
Gross Floor Area: –
Implementation: 2009
The Project
Supply and installation of medical equipment.
Kurunegala
Sri Lanka
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2009
The Project
Supply and installation of medical & mechanical equipment for 30 hospitals & health facilities.
Chaocheng Central Hospital Chaohu
China
Client
Chaocheng Central Hospital
Key data
Beds: 300
Gross Floor Area: –
Implementation: 2008
The Project
Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.
Hohhot Hospital No 4
China
Client
Hohhot Hospital No. 4
Key data
Beds: 260
Gross Floor Area: –
Implementation: 2008
The Project
Supply and installation of medical equipment.
Dongsheng District People’s Hospital Erdos
China
Client
Dongsheng District People’s Hospital Erdos
Key data
Beds: 198
Gross Floor Area: –
Implementation: 2008
The Project
Supply and installation of medical equipment.
15 hospitals in Vietnam
Vietnam
Client
PMU
Key data
Beds: –
Gross Floor Area: –
Implementation: 2006
The Project
Project management, planning, delivery, installation and commissioning of key medical and building services equipment, supervision of construction work, staff training, 1 year maintenance.
Tongliang Chinese Medical Hospital
China
Client
Tongliang Chinese Medical Hospital
Key data
Beds: 235
Gross Floor Area: –
Implementation: 2006
The Project
Supply and installation of medical equipment.
Wuyi Chinese Medical Hospital
China
Client
Wuyi Chinese Medical Hospital
Key data
Beds: 325
Gross Floor Area: –
Implementation: 2005
The Project
Supply and installation of medical equipment.
Various hospitals in the Philippines
Philippines
Client
Department of Health
Key data
Beds: –
Gross Floor Area: 1.700
Completion year: 2003
The Project
Supply and installation of medical and environmental equipment.
Shanghai Yangpu District Central Hospital
China
Client
Shanghai Yangpu District Hospital
Key data
Beds: 350
Gross Floor Area: –
Implementation: 2003
The Project
Supply and installation of medical equipment.
Dr. Jamil and Dr. Sardjito Hospital
Indonesia
Client
Ministry of Health
Key data
Beds: 1390
Gross Floor Area: –
Implementation: 2002
The Project
Design and detailed engineering, installations and supply of medical equipment, project management, installation, testing and commissioning, training of hospital personnel, 2 years maintenance, 1 year Quality assurance programme for Dr. Jamil Hospital and Dr. Sardjito Hospital.
25 Hospitals
Vietnam
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2002
The Project
Installation of hospital waste incinerator.
Surgical Center RSUD Dr. Soetomo Hospital Surabaya
Indonesia
Client
Ministry of Health
Key data
Beds: 1500
Gross Floor Area: –
Implementation: 1999
The Project
Design, engineering and supply of the mechanical, electrical and medical equipment; installation, testing, commissioning including staff training, quality assurance programme for 1 year, maintenance for 2 years.
Shanghai First People's Hospital
China
Client
Municipality of Shanghai
Key data
Beds: 680
Gross Floor Area: –
Implementation:1993
The Project
Supply and installation of medical equipment.
Kuala Lumpur Cardio Thoracic Center
Kuala Lumpur
Client
Ministry of Health
Key data
Beds: 270
Gross Floor Area: –
Implementation: 1992
The Project
Turn-key implementation
Latin America
Guyana Paediatric and Maternal Hospital
Guyana
Client
Ministry of Health
Key data
Beds: 256
Gross Floor Area: 24,000 m²
Implementation: On Going
The Project
The Guyana Pediatric and Maternal Hospital (GPMH) is a landmark project under an MoU between the Governments of Austria and Guyana, part of a wider effort to modernize Guyana’s public healthcare. Addressing historic gaps in funding and access to specialized care, GPMH serves both Georgetown and remote hinterland communities. This state-of-the-art facility provides comprehensive services across specialized departments, including Accident & Emergency, Outpatients, Surgery, ICU, Obstetrics, Imaging, Radiology, Endoscopy, Dialysis, Chemotherapy, Lab Services, and a Mortuary. GPMH is a critical step toward equitable, high-quality care for women and children in Guyana.
New Amsterdam Hospital Campus
Guyana
Client
Ministry of Health, Angola
Key data
Beds: 230
Gross Floor Area: 24,000 m²
Implementation: On Going
The Project
The New Amsterdam Hospital Campus is a landmark project under an MoU between the Governments of Austria and Guyana, aiming to address major gaps in Guyana’s public healthcare system. Designed as a modern, sustainable facility, it offers emergency, inpatient, and outpatient care, surgical theatres, diagnostic and treatment areas, a pharmacy, labs, central sterilization, a mental health clinic, and a teaching facility. This campus decentralizes access to high-quality care, integrates clinical training, and promotes mental health support. As a catalyst for long-term transformation, it sets a model for regional hospital development and improved health equity in Guyana.
Hospital de Sangre Grande
Trinidad and Tobago
Client
Corporación de Desarrollo Urbano de Trinidad and Tobago (UDECOTT)
Key data
Beds: 106
Gross Floor Area: 18.000 m²
Implementation: 2020 – 2024
The Project
Hospital Nueva Segovia
Nicaragua
Client
Ministry of Health of the Republic of Nicaragua
Key data
Beds: 234
Gross Floor Area: 23,600 m²
Implementation: On Going
The Project
Located in Ocotal, Nueva Segovia, about 225 km from Managua, the new “Hospital Departmental de Nueva Segovia” replaces a 60-year-old facility. Awarded to VAMED in late 2018, the project includes construction, equipment delivery, installation, training, and maintenance. With approximately 230 beds, the hospital offers services in internal medicine, surgery, pediatrics, orthopedics, ophthalmology, and ENT. It features five operating theatres, adult and pediatric ICUs, and neonatology. Serving over 260,000 people, it sets new medical standards for northern Nicaragua and stands as a key reference project in the national healthcare system.
Point Fortin Hospital
Trinidad and Tobago
Client
UDECOTT
Key data
Beds: 100
Net Floor Area: 16,000 m²
Implementation: 2015 – 2020
The Project
This turn-key contract covers the planning, construction, furnishing, and full equipping of a new 3-storey general hospital in Trinidad & Tobago, including both medical and non-medical equipment. It also includes start-up services, staff training, and 3 years of maintenance. The hospital will specialize in burn treatment, addressing needs linked to the region’s major liquid gas industry. Additional departments include Emergency, Radiology, Surgery, Physiotherapy, Outpatient, and Psychiatry. The project aims to deliver a modern, fully integrated healthcare facility tailored to the specific needs of the local population.
Hospital Zonal Suroeste
Argentina
Client
Ministry of Health
Key data
Beds: 25
Gross Floor Area: 5,000 m²
Implementation: 2020
The Project
Hospital Manolo Morales
Nicaragua
Client
Ministry of Health
Key data
Beds: 240
Gross Floor Area: 1,148 m²
Implementation: 2019
The Project
Turnkey hospital realized to provide medical services for the Radiology and Emergency Departments.
General Hospital Villa Tunari
Bolivia
Client
AISEM
Key data
Beds: 200
Gross Floor Area: 21.000 m²
Implementation: 2018 – 2022
The Project
As part of Bolivia’s national healthcare modernization masterplan, the tertiary hospital in Villa Tunari, Cochabamba Province, is designed to deliver state-of-the-art diagnostics, treatment, and hospitalization. The hospital also serves as a training site for medical students under the guidance of expert clinicians. Key service areas include obstetrics, dialysis, cancer chemotherapy, and trauma care, including ICU services for road accident victims. Additional functions encompass emergency and outpatient services, diagnostics, imaging, laboratory and pharmacy, surgery with ICU, day clinic, rehabilitation, therapies, and mortuary and pathology services—ensuring comprehensive regional care.
Ayacucho Hospital
Peru
Client
Consortium Hospital Ayacucho
Key data
Beds: 240
Gross Floor Area: 53,000 m²
Implementation: 2018
The Project
Supply and installation of medical equipment.
Hospital Bertha Calderon
Nicaragua
Client
Ministry of Health
Key data
Beds: 270
Gross Floor Area: – m²
Implementation: 2017
The Project
Supply and installation of the new emergency department, imaging equipment and maternity department.
Quito 3 Hospitals Ecuador
Ecuador
Client
Ministry of Health Ecuador
Key data
Beds: –
Gross Floor Area: – m²
Implementation: 2016
The Project
Castries National Hospital St. Lucia
Santa Lucia
Client
Government of St. Lucia
Key data
Beds: –
Gross Floor Area: –
Implementation: 2015
The Project
Supply and installation of medical equipment.
San Fernando General Hospital
Trinidad and Tobago
Client
UDECOTT
Key data
Beds: 216
Gross Floor Area: 30,300 m²
Implementation: 2014
The Project
Functional concept, engineering, project management, renovation of existing building, supply & installation of medical & electro-mechanical equipment, training, maintenance.
Santa Rosa de Copan Hospital del Occidente Honduras
Honduras
Client
Ministry of Health Honduras
Key data
Beds: 400
Gross Floor Area: 25,000 m²
Implementation: 2014
The Project
Turnkey implementation of the Radiology Department.
Hospital Leonardo Martinez, San Pedro Sula
Honduras
Client
Ministry of Health
Key data
Beds: 400
Gross Floor Area: 68.000 m²
Implementation: 2013
The Project
Supply and installation of medical equipment.
San Pedro Sula Catarino Rivas Honduras
Honduras
Client
Ministry of Health Honduras
Key data
Beds: 500
Gross Floor Area: 75,000 m²
Implementation: 2013
The Project
Supply and installation of medical and non-medical equipment
Municipal Hospital St.Louis du Nord
Haiti
Client
Hilfswerk International
Key data
Beds: 20
Gross Floor Area: 720 m²
Implementation: 2010
The Project
Turnkey implementation of a community hospital.
Middle East
NEW AL AIN HOSPITAL (STMC)
United Arab Emirates
Client
SEHA (Main contractor ARABTECH – SAN JOSE JV)
Key data
Beds: 719
Gross Floor Area: 341,860.820 m²
Implementation: Ongoing / 2020-2026
The Project
The New Al Ain Hospital, now named STMC, in Abu Dhabi provides state-of-the-art medical care aligned with international standards. With 719 beds—including 510 for general care, 67 ICU, and 142 for rehabilitation—the facility features 104 specialized clinics, 12 operating theatres (including 1 hybrid), 20 radiology rooms, advanced endoscopy suites, a robotic pharmacy, and a hyperbaric chamber system. An educational and simulation center with training rooms and a central library is also included. VAMED’s scope covered supply, project management, engineering, IT integration, installation, staff training, and a 3-year comprehensive warranty for all medical equipment.
THE ROYAL OMAN POLICE NEW HOSPITAL PROJECT (MEDICAL CITY HOSPITAL FROR MIL-ITARY & SECURITY SERVICES – MUSCAT)
Oman
Client
ROYAL OMAN POLICE. Contractor/ Client: GALFAR Engineering & Contracting SAOG
Key data
Beds: 459
Gross Floor Area: 185,000 m²
Implementation: 2020
The Project
In Muscat’s Airport Heights, the Sultanate of Oman is constructing the Royal Oman Police Hospital, spanning 185,000 m² with an initial capacity of 459 beds, expandable to 600. The hospital will serve military and security personnel and their families, offering care in oncology, traumatology, pediatrics, gynecology, cardiology, and surgery. VAMED was awarded project management and MEP systems supply, including Medical Gas Systems, Nurse Call System, Laminar Flow & Critical Environment Diffusers, and a Photovoltaic System. VAMED also handles the supply, installation, testing, commissioning, training, and 3-year warranty for the full Medical & Laboratory Equipment Package.
AL REEM HOSPITAL
United Arab Emirates
Client
Blue Apple Property Management LLC, UAE
Key data
Beds: 219
Gross Floor Area: 48,600 m²
Implementation: 2020
The Project
Reem Hospital comprises three advanced healthcare facilities operated by VAMED. The Family Medicine Centre (FMC) includes 32 clinics initially (expanding to 47), offering comprehensive specialty care with a focus on pediatrics. FMC physicians also access 25 acute care beds for short stays. The second facility is a 73-bed medical rehabilitation center providing intensive orthopedic, neurologic, cardiologic, and oncologic rehab for in- and out-patients. The third is a 119-bed specialized pediatrics and women’s hospital, operated with a leading clinical partner. VAMED aims to establish Reem Hospital as the top destination for rehabilitation services in the UAE and GCC.
Al Ahli Hospital Doha
Qatar
Client
Al Ahli Hospital Corporation Q.S.C./ Contraco W.W.L., Qatar
Key data
Beds: 200
Gross Floor Area: –
Completion: 2006
The Project
Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works, Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture, warranty for 1 year.
Doha Al Ahli Hospital
Qatar
Client
Al Ahli Hospital
Key data
Beds: 200
Gross Floor Area: – m²
Implementation: 2004
The Project
Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works. Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture. warranty for 1 year.
6 Hospitals
Syria
Client
–
Key data
Beds: 140
Gross Floor Area: –
Implementation: 1995
The Project
Engineering, installation and supply of medical equipment, testing and commissioning. training of personnel, 3 years maintenance.
Tripoli University Hospital
Lebanon
Client
Ministry of Health
Key data
Beds: 1400
Gross Floor Area: –
Completion: 1992
The Project
Medical equipment and maintenance. Planning, supply and installation of medical equipment, maintenance, staff training, implementation of quality assurance programs, IT-supported maintenance and information systems.
Rehabilitation Center Yerevan
Armenia
Client
International Federation of Red Cross and Red Crescent Societies.
Key data
Beds: 120
Gross Floor Area: –
Implementation: 1992
The Project
Design and supply of complete medical equipment, including training of personnel. provision of management program, planning, and management assistance during the start-up period.
8 Hospitals Iraq
Iraq
Client
Ministry of Health
Key data
Beds: 400
Gross Floor Area: –
Implementation: 1986
The Project
Medical engineering, supply of the complete medical equipment and furniture, installation and commissioning plus the training of the personnel and maintenance for 5 years. The project involved six 260 bed maternity/child hospitals, and one 400 bed central child hospital and one 200 bed rehabilitation center.
Near East
Moscow Medsi CDC
Russia
Client
Moscow Medsi CDC
Key data
Beds: 20
Gross Floor Area: 22,800 m²
Implementation: 2015
The Project
Supply and installation of medical equipment.
MCS Intermed Hospital
Mongolia
Client
MCS Intermed Hospital
Key data
Beds: 91
Gross Floor Area: 13.000 m2
Implementation: 2014
The Project
Hospital planning, supply & Installation of medical equipment.
St. Petersburg AVA Peter Nord
Russia
Client
AVA Peter Nord
Key data
Beds: 120
Gross Floor Area: – m²
Implementation: 2014
The Project
Supply and installation of medical equipment.
Sochi Hospital Nº4
Russia
Client
Administration of Krasnodar Region
Key data
Beds: 300
Gross Floor Area: 44,500 m²
Implementation: 2013
The Project
Turnkey hospital realized to provide medical services especially for the Olympic Winter Games 2014.
Health Improvement Project
Ukraine
Client
Ukrmedpstatsch
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment.
Al Essra Hospital
Jordan
Client
Al Essra Committee.
Key data
Beds: 100
Gross Floor Area: –
Implementation: 2001
The Project
Supply, installation and commissioning of medical equipment, training of hospital personnel.
Erzincan World Bank Project
Turkey
Client
World Bank.
Key data
Beds: 350
Gross Floor Area: –
Implementation: 1996
The Project
Design, engineering and supervision of 3 hospitals.
Europe
Bundeswehrkrankenhaus Ulm
Germany
Client
Key data
Beds: N/A
Gross Floor Area: N/A m²
Implementation: Engineering 2022 – 2023 / Supply 03/2024 – 04/2025
The Project
The German Armed Forces Hospital Ulm (BWK), the largest military hospital in southern Germany, serves both military and civilian patients and is affiliated with the University Hospital of Ulm. Since 2009, Hospitalia international gmbh has delivered multiple projects at BWK, including upgrades to Emergency, OR, Endoscopy, Pathology, and ICU areas. In 2023, Hospitalia won the tender to renew equipment in the Pathology Lab and Pharmacy. The scope included planning, supply, installation, staff training, and commissioning of analytical systems, safety cabinets, and GMP-compliant isolators. Tasks followed strict quality protocols, including mockups, FAT, IQ, and OQ, ensuring full integration and compliance.
ZLR – Zentrum für Luft- u. Raumfahrtmedizin
Germany
Client
Key data
Beds: N/A
Gross Floor Area: N/A m²
Implementation: Design 2021 / Supply of Equipment 2022 – 2023
The Project
The ZLR, Germany’s Air Force Center for Aerospace Medicine, specializes in military aviation medicine—from personnel assessment to long-term support. It also conducts forensic and chemical investigations of flight accidents, including histopathology labs with a scanning electron microscope for material analysis. In 2022, the new ZLR building in Cologne Wahn was completed, housing 11 functional and diagnostic departments. Hospitalia international gmbh, as the successful bidder, managed the integration of relocated and new medical equipment. Scope included planning, supply, installation, staff training, and coordination of warranty services—ensuring full operational readiness of the advanced facility.
Bundeswehr Hospitals
Germany
Client
Key data
Beds: N/A
Gross Floor Area: N/A m²
Implementation: 2024-2030
The Project
Kalamata General Hospital
Greece
Client
–
Key data
Beds: 280
Gross Floor Area: –
Implementation: 2000
The Project
Turn-key implementation. Construction, Medical equipment design and supply, installation, testing and commissioning; training of the hospital personnel, warranty for 2 years.
Cardiac Center Minsk
Belarus
Client
Department of Health of Minsk
Key data
Beds: –
Gross Floor Area: –
Implementation: 2000
The Project
Bratislava Radiotherapy Center
Slovakia
Client
National Oncological Institute Bratislava.
Key data
Beds: 30
Gross Floor Area: –
Implementation: 1996
The Project
Supply of medical equipment. General contractor and responsible for the complete design, construction, electro-mechanical systems and medical equipment supply.