NEWS:
WWH and Vamed joined forces.
The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.
NEWS:
WWH and Vamed joined forces.
The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.
VAMED – a strong partner
VAMED provides services for hospitals and other healthcare facilities. The company, headquartered in Vienna, Austria, was founded in 1982. Since 1984, VAMED Engineering has been active in the areas of real estate development, facility and hospital management.
To date, the company has completed around 1,000 projects in more than 98 countries.
PROJECTS
1,000 projects
96 countries
over the last
40 years
SELECTION OF PROJECTS
Africa
Cacuaco General Hospital
Angola
Client
Ministry of Health
Key data
Beds: 322
Gross Floor Area: 27,000 m²
Implementation: 26.07.2024
The Project
The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.
Viana General Hospital
Angola
Client
Ministry of Health
Key data
Beds: 322
Gross Floor Area: 25,000 m²
Implementation: 23.04.2024
The Project
The Viana General Hospital, located in Luanda, Angola is being developed by VAMED in a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, as well as all construction works and installation.
This new hospital is located on a land of around 25,000 m2, and consists of a 3-storey main building and 5 smaller satellite buildings that function autonomously (the Maintenance Building, the Morgue Building, the Laundry Building, the Cafeteria Building and the Technical Building), essentially made up of ground floor and roof structures. In terms of services, it has five operating theatres, eight inpatient wards, a centralised diagnostic centre, an emergency service, obstetrics and gynaecology, paediatrics, orthopaedics and general medicine.
5 District Hospitals + 1 Polyclinic
Ghana
Client
Ministry of Health, Ghana
Key data
Beds: 370
Gross Floor Area: 27,090 m²
Implementation: 2020
The Project
Construction of 5 district Hospitals in Ghana’s northern region in Sawla, Tolon and Buipe, Eastern Region in Somanya and Volta Region in Wheta as well as a polyclinic in Northern Region in Bamboi.
Ghana 20 Polyclinics
Ghana
Client
Ministry of Health, Ghana
Key data
Beds: 375
Gross Floor Area: 18,250 m²
Implementation: 2017
The Project
Turnkey construction of 15 polyclinics:
– 5 in the Northern Region (Janga, Karaga, Chereponi, Tatale, Kpandai).
– 5 in the Upper West Region (Babile, Hain, Ko, Lambussie, Wechiau).
– 5 in Brong-Afaho (Booma, Kwatire, Nkrankwanta, Techimantia, Wamfie).
– 5 in Greater Accra Province (Adentan, Ashiaman, Bortianor, Oduman, Sege).
Key data
Gushegu District Hospital
Ghana
Client
Ministry of Health
Key data
Beds: 86
Gross Floor Area: 5,724 m²
Implementation: 2007
The Project
Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.
Libreville Hôpital d'Instruction des Armees Omar Bongo Ondimba (HIAOBO)
Gabon
Client
Ministry of Defense, Gabon
Key data
Beds: 130
Gross Floor Area: 14,400 m²
Implementation: 2005
The Project
Turn-key Implementation, total operation. Design, engineering, construction, equipping, installation, testing and commisioning, extensions ongoing.
Begoro District Hospital
Ghana
Client
Ministry of Health
Key data
Beds: 60
Gross Floor Area: 5,000 m²
Implementation: 2003
The Project
Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.
District Hospital Abuja
Nigeria
Client
Federal Capital Development Authority
Key data
Beds: 60
Gross Floor Area: –
Implementation: 2001
The Project
Design, construction, mechanical and electrical building works, supply and installation of medical equipment and furniture, testing and commissioning. Training of users and maintanence staff including maintenance for a 6 month period.
Rural Health Centers Ethiopia
Ethiopia
Client
Ministry of Health, Ethiopia; Foreign Ministry, Austria
Key data
Beds: 30
Gross Floor Area: –
Implementation: 1991
The Project
Turn-key.
Rural Hospitals
Nigeria
Client
Ministry of Health, Nigeria
Key data
Beds: 44
Gross Floor Area: –
Implementation: 1991
The Project
Medical equipment.
Asia
Songi District Hospital
Mongolia
Client
Ministry of Health
Key data
Beds: 200
Gross Floor Area: 18,000 m²
Implementation: 2019
The Project
Supply and installation of medical equipment.
Lao Radiotherapy Centre
Laos
Client
Ministry of Health of the Lao People’s Democratic Republic
Key data
Beds: 120
Gross Floor Area: –
Implementation: 2016
The Project
- Turnkey Implementation (Civil, Electrical & Mechanical and Sanitary)
- Radiotherapy Equipment (Linear Accelerator, CT Simulator Unit complete with Planning and related Hardware & Software)
- Equipment for examination room, doctor’s offices etc.
- Hospital & Office Furniture etc.
- Staff Training and 12 months Start Up Assistance
- 24 months Maintenance
Laos Vientiane Radiotherapy
Laos
Client
Ministry of Health of the Lao People’s Democratic Republic
Key data
Beds: –
Gross Floor Area: 1,700 m²
Implementation: 2016
The Project
Radiotherapy Equipment (Linear Accelerator, CT Simulator Unit complete with Planning and related Hardware & Software)
Equipment for examination room, doctor’s offices etc.
Hospital & Office Furniture etc.
Staff Training and 12 months Start Up Assistance
24 months Maintenance
Affiliated People´s Hospital of Inner Mongolia University
China
Client
Affiliated People´s Hospital of Inner Mongolia University
Key data
Beds: –
Gross Floor Area: –
Implementation: 2015
The Project
Supply and installation of medical equipment.
Hue Central Hospital
Vietnam
Client
Ministry of Health Vietnam
Key data
Beds: –
Gross Floor Area: –
Implementation: 2014
The Project
Planning, supply and installation of medical equipment
Hefei No 2 People´s Hospital
China
Client
Hefei No. 2 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ningxia Hui Autonomous Region People‘s Hospital Nanchang
China
Client
Ningxia Hui Autonomous Region People‘s Hospital Nanchang
Key data
Beds: 2.630
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Xuancheng People’s Hospital
China
Client
Xuancheng People’s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Xundian No.1 People´s Hospital
China
Client
Xundian No.1 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The project
Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.
Yingtan People´s Hospital
Yingtan
Client
Yingtan People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ziyang People´s Hospital
China
Client
Ziyang People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Ziyang No.2 People´s Hospital
China
Client
Ziyang No. 2 People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Shijiazhuang No.3 Hospital
China
Client
Shijiazhuang No.3 Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Qinghai Woman & Chrildren´s Hospital
China
Client
Qinghai Woman & Children´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Nanchang Hospital of Integrated Traditional and Western Medicine
China
Client
Nanchang Hospital of Integrated Traditional and Western Medicine
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Provincial People‘s Hospital Changsha
China
Client
Provincial People‘s Hospital Changsha
Key data
Beds: –
Gross Floor Area: –
Implementation: 2013
The Project
Supply and installation of medical equipment.
Zigong No. 1 People’s Hospital
Zigong
Client
Zigong No. 1 People’s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Supply of medical equipment
Hexian People‘s Hospital
China
Client
Hexian People‘s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of medical equipment.
Chongqing Three Gorges Vocational College
China
Client
Chongqing Three Gorges Vocational College
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of educational equipment.
Yingcheng People´s Hospital
China
Client
Yingcheng People´s Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2012
The Project
Supply and installation of medical equipment.
Wuan Hospital
China
Client
Wuan Hospital
Key data
Beds: –
Gross Floor Area: –
Implementation: 2011
Key data
Supply and installation of medical equipment.
Mahosot Hospital
Laos
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2011
The Project
Planning, supply and installation of medical equipment.
Sarawak International Medical Center
Malaysia
Client
Sarawak International Medical Center.
Key data
Beds: 200
Gross Floor Area: 60,000 m²
Implementation: 2010
The Project
Project Management, planning, supply and installation of medical equipment and hospital IT-system, Training of Hospital personnel, Maintenance for 2 years.
Wushan People´s Hospital
China
Client
Wushan People´s Hospital
Key data
Beds: 120
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment.
Qingyang People´s Hospital
China
Client
Quingyang People´s Hospital
Key data
Beds: 500
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment
Puhua Jinson Clinic
China, Beijing
Client
–
Key data
Beds: 30
Gross Floor Area: 1,700 m²
Implementation: 2010
The Project
Consultancy Services: design, functional planning.
Potalai Medical Spa
Thailand
Client
Photaria Co Ltd
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Consulting & project management for improvement and extension of SPA services.
Selangor Universiti Teknologi Mara
Malaysia
Client
Tunas Selatan Sdn. Bhd.
Key data
Beds: 86
Gross Floor Area: 26,000 m²
Implementation: 2009
The Project
Planning, supply and installation of medical equipment.
Laibin Municipal People’s Hospital
China
Client
Laibin Municipal People’s Hospital
Key data
Beds: 336
Gross Floor Area: –
Implementation: 2009
The Project
Supply and installation of medical equipment.
Kurunegala
Sri Lanka
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2009
The Project
Supply and installation of medical & mechanical equipment for 30 hospitals & health facilities.
Chaocheng Central Hospital Chaohu
China
Client
Chaocheng Central Hospital
Key data
Beds: 300
Gross Floor Area: –
Implementation: 2008
The Project
Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.
Hohhot Hospital No 4
China
Client
Hohhot Hospital No. 4
Key data
Beds: 260
Gross Floor Area: –
Implementation: 2008
The Project
Supply and installation of medical equipment.
Dongsheng District People’s Hospital Erdos
China
Client
Dongsheng District People’s Hospital Erdos
Key data
Beds: 198
Gross Floor Area: –
Implementation: 2008
The Project
Supply and installation of medical equipment.
15 hospitals in Vietnam
Vietnam
Client
PMU
Key data
Beds: –
Gross Floor Area: –
Implementation: 2006
The Project
Project management, planning, delivery, installation and commissioning of key medical and building services equipment, supervision of construction work, staff training, 1 year maintenance.
Tongliang Chinese Medical Hospital
China
Client
Tongliang Chinese Medical Hospital
Key data
Beds: 235
Gross Floor Area: –
Implementation: 2006
The Project
Supply and installation of medical equipment.
Wuyi Chinese Medical Hospital
China
Client
Wuyi Chinese Medical Hospital
Key data
Beds: 325
Gross Floor Area: –
Implementation: 2005
The Project
Supply and installation of medical equipment.
96 Hospitals in China
China
Client
Hospitals
Key data
Beds: –
Gross Floor Area: –
Implementation: 2005
The Project
Medical equipment.
Various hospitals in the Philippines
Philippines
Client
Department of Health
Key data
Beds: –
Gross Floor Area: 1.700
Completion year: 2003
The Project
Supply and installation of medical and environmental equipment.
Shanghai Yangpu District Central Hospital
China
Client
Shanghai Yangpu District Hospital
Key data
Beds: 350
Gross Floor Area: –
Implementation: 2003
The Project
Supply and installation of medical equipment.
Dr. Jamil and Dr. Sardjito Hospital
Indonesia
Client
Ministry of Health
Key data
Beds: 1390
Gross Floor Area: –
Implementation: 2002
The Project
Design and detailed engineering, installations and supply of medical equipment, project management, installation, testing and commissioning, training of hospital personnel, 2 years maintenance, 1 year Quality assurance programme for Dr. Jamil Hospital and Dr. Sardjito Hospital.
25 Hospitals
Vietnam
Client
Ministry of Health
Key data
Beds: –
Gross Floor Area: –
Implementation: 2002
The Project
Installation of hospital waste incinerator.
Surgical Center RSUD Dr. Soetomo Hospital Surabaya
Indonesia
Client
Ministry of Health
Key data
Beds: 1500
Gross Floor Area: –
Implementation: 1999
The Project
Design, engineering and supply of the mechanical, electrical and medical equipment; installation, testing, commissioning including staff training, quality assurance programme for 1 year, maintenance for 2 years.
Shanghai First People's Hospital
China
Client
Municipality of Shanghai
Key data
Beds: 680
Gross Floor Area: –
Implementation:1993
The Project
Supply and installation of medical equipment.
Kuala Lumpur Cardio Thoracic Center
Kuala Lumpur
Client
Ministry of Health
Key data
Beds: 270
Gross Floor Area: –
Implementation: 1992
The Project
Turn-key implementation
Latin America
Hospital de Sangre Grande
Trinidad and Tobago
Client
Corporación de Desarrollo Urbano de Trinidad and Tobago (UDECOTT)
Key data
Beds: 106
Gross Floor Area: 5.300 m²
Implementation: 2022
The Project
Hospital Nueva Segovia
Nicaragua
Client
Ministry of Health
Key data
Beds: 234
Gross Floor Area: 23,000 m²
Implementation: 2021
The Project
Turnkey implementation.
Point Fortin Hospital
Trinidad and Tobago
Client
UDECOTT
Key data
Beds: 100
Gross Floor Area: 16,000 m²
Implementation: 2020
The Project
Turnkey implementation.
Hospital Zonal Suroeste
Argentina
Client
Agencia Cordoba de Inversion y Financiamiento (ACIF)
Key data
Beds: 14
Gross Floor Area: 5,300 m²
Implementation: 2020
The Project
The Zonal Suroeste hospital, which covers 5,300m2 in Corodoba, is a turnkey project. VAMED’s scope of services included management, planning, design, medical equipment, staff training, as well as a 1-year warranty.
The hospital has 14 outpatient clinics with all specialties; from a guard and emergency area to a shock room, four observation beds, triage special clinics and four operating rooms.
Hospital Manolo Morales
Nicaragua
Client
Ministry of Health
Key data
Beds: 240
Gross Floor Area: 1,148 m²
Implementation: 2019
The Project
Turnkey hospital realized to provide medical services for the Radiology and Emergency Departments.
General Hospital Villa Tunari
Bolivia
Client
Ministry of Health
Key data
Beds: 200
Gross Floor Area: 21.400 m²
Implementation: 2019
The Project
Turn-key implementation. Main Contractor, Service, Planning Construction, Planning Equipment.
Ayacucho Hospital
Peru
Client
Consortium Hospital Ayacucho
Key data
Beds: 240
Gross Floor Area: 53,000 m²
Implementation: 2018
The Project
Supply and installation of medical equipment.
Hospital Bertha Calderon
Nicaragua
Client
Ministry of Health
Key data
Beds: 270
Gross Floor Area: – m²
Implementation: 2017
The Project
Supply and installation of the new emergency department, imaging equipment and maternity department.
Quito 3 Hospitals Ecuador
Ecuador
Client
Ministry of Health Ecuador
Key data
Beds: –
Gross Floor Area: – m²
Implementation: 2016
The Project
Castries National Hospital St. Lucia
Santa Lucia
Client
Government of St. Lucia
Key data
Beds: –
Gross Floor Area: –
Implementation: 2015
The Project
Supply and installation of medical equipment.
San Fernando General Hospital
Trinidad and Tobago
Client
UDECOTT
Key data
Beds: 216
Gross Floor Area: 30,300 m²
Implementation: 2014
The Project
Functional concept, engineering, project management, renovation of existing building, supply & installation of medical & electro-mechanical equipment, training, maintenance.
Santa Rosa de Copan Hospital del Occidente Honduras
Honduras
Client
Ministry of Health Honduras
Key data
Beds: 400
Gross Floor Area: 25,000 m²
Implementation: 2014
The Project
Turnkey implementation of the Radiology Department.
Hospital Leonardo Martinez, San Pedro Sula
Honduras
Client
Ministry of Health
Key data
Beds: 400
Gross Floor Area: 68.000 m²
Implementation: 2013
The Project
Supply and installation of medical equipment.
San Pedro Sula Catarino Rivas Honduras
Honduras
Client
Ministry of Health Honduras
Key data
Beds: 500
Gross Floor Area: 75,000 m²
Implementation: 2013
The Project
Supply and installation of medical and non-medical equipment
Municipal Hospital St.Louis du Nord
Haiti
Client
Hilfswerk International
Key data
Beds: 20
Gross Floor Area: 720 m²
Implementation: 2010
The Project
Turnkey implementation of a community hospital.
Middle East
Al Ahli Hospital Doha
Qatar
Client
Al Ahli Hospital Corporation Q.S.C./ Contraco W.W.L., Qatar
Key data
Beds: 200
Gross Floor Area: –
Completion: 2006
The Project
Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works, Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture, warranty for 1 year.
Doha Al Ahli Hospital
Qatar
Client
Al Ahli Hospital
Key data
Beds: 200
Gross Floor Area: – m²
Implementation: 2004
The Project
Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works. Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture. warranty for 1 year.
6 Hospitals
Syria
Client
–
Key data
Beds: 140
Gross Floor Area: –
Implementation: 1995
The Project
Engineering, installation and supply of medical equipment, testing and commissioning. training of personnel, 3 years maintenance.
Tripoli University Hospital
Lebanon
Client
Ministry of Health
Key data
Beds: 1400
Gross Floor Area: –
Completion: 1992
The Project
Medical equipment and maintenance. Planning, supply and installation of medical equipment, maintenance, staff training, implementation of quality assurance programs, IT-supported maintenance and information systems.
Rehabilitation Center Yerevan
Armenia
Client
International Federation of Red Cross and Red Crescent Societies.
Key data
Beds: 120
Gross Floor Area: –
Implementation: 1992
The Project
Design and supply of complete medical equipment, including training of personnel. provision of management program, planning, and management assistance during the start-up period.
8 Hospitals Iraq
Iraq
Client
Ministry of Health
Key data
Beds: 400
Gross Floor Area: –
Implementation: 1986
The Project
Medical engineering, supply of the complete medical equipment and furniture, installation and commissioning plus the training of the personnel and maintenance for 5 years. The project involved six 260 bed maternity/child hospitals, and one 400 bed central child hospital and one 200 bed rehabilitation center.
Near East
Moscow Medsi CDC
Russia
Client
Moscow Medsi CDC
Key data
Beds: 20
Gross Floor Area: 22,800 m²
Implementation: 2015
The Project
Supply and installation of medical equipment.
MCS Intermed Hospital
Mongolia
Client
MCS Intermed Hospital
Key data
Beds: 91
Gross Floor Area: 13.000 m2
Implementation: 2014
The Project
Hospital planning, supply & Installation of medical equipment.
St. Petersburg AVA Peter Nord
Russia
Client
AVA Peter Nord
Key data
Beds: 120
Gross Floor Area: – m²
Implementation: 2014
The Project
Supply and installation of medical equipment.
Sochi Hospital Nº4
Russia
Client
Administration of Krasnodar Region
Key data
Beds: 300
Gross Floor Area: 44,500 m²
Implementation: 2013
The Project
Turnkey hospital realized to provide medical services especially for the Olympic Winter Games 2014.
Health Improvement Project
Ukraine
Client
Ukrmedpstatsch
Key data
Beds: –
Gross Floor Area: –
Implementation: 2010
The Project
Supply and installation of medical equipment.
Al Essra Hospital
Jordan
Client
Al Essra Committee.
Key data
Beds: 100
Gross Floor Area: –
Implementation: 2001
The Project
Supply, installation and commissioning of medical equipment, training of hospital personnel.
Erzincan World Bank Project
Turkey
Client
World Bank.
Key data
Beds: 350
Gross Floor Area: –
Implementation: 1996
The Project
Design, engineering and supervision of 3 hospitals.
Europe
Kalamata General Hospital
Greece
Client
–
Key data
Beds: 280
Gross Floor Area: –
Implementation: 2000
The Project
Turn-key implementation. Construction, Medical equipment design and supply, installation, testing and commissioning; training of the hospital personnel, warranty for 2 years.
Cardiac Center Minsk
Belarus
Client
Department of Health of Minsk
Key data
Beds: –
Gross Floor Area: –
Implementation: 2000
The Project
Bratislava Radiotherapy Center
Slovakia
Client
National Oncological Institute Bratislava.
Key data
Beds: 30
Gross Floor Area: –
Implementation: 1996
The Project
Supply of medical equipment. General contractor and responsible for the complete design, construction, electro-mechanical systems and medical equipment supply.