NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

VAMED – a strong partner

VAMED provides services for hospitals and other healthcare facilities. The company, headquartered in Vienna, Austria, was founded in 1982. Since 1984, VAMED Engineering has been active in the areas of real estate development, facility and hospital management.

To date, the company has completed around 1,000 projects in more than 98 countries.

PROJECTS

1,000 projects

96 countries

over the last
40 years

SELECTION OF PROJECTS

Africa

Cacuaco General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 27,000 m²

Implementation: 26.07.2024

The Project

The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.

Viana General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 25,000 m²

Implementation: 23.04.2024

The Project

The Viana General Hospital, located in Luanda, Angola is being developed by VAMED in a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, as well as all construction works and installation.

This new hospital is located on a land of around 25,000 m2, and consists of a 3-storey main building and 5 smaller satellite buildings that function autonomously (the Maintenance Building, the Morgue Building, the Laundry Building, the Cafeteria Building and the Technical Building), essentially made up of ground floor and roof structures. In terms of services, it has five operating theatres, eight inpatient wards, a centralised diagnostic centre, an emergency service, obstetrics and gynaecology, paediatrics, orthopaedics and general medicine.

Urology and Nephrology Centre of Excellence

Ghana

Client

Ministry of Health

Key data

Beds: 101 + 30 Dialysis stations
Gross Floor Area: 7,800 m²

Implementation: 12.2023

The Project

Turn key / Design / Build / Equip /Finance /Train / 3 years Maintenance

5 District Hospitals + 1 Polyclinic

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 370
Gross Floor Area: 27,090 m²

Implementation: 2020

The Project

Construction of 5 district Hospitals in Ghana’s northern region in Sawla, Tolon and Buipe, Eastern Region in Somanya and Volta Region in Wheta as well as a polyclinic in Northern Region in Bamboi.

Ghana 20 Polyclinics

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 375
Gross Floor Area: 18,250 m²

Implementation: 2017

The Project

Turnkey construction of 15 polyclinics:
– 5 in the Northern Region (Janga, Karaga, Chereponi, Tatale, Kpandai).
– 5 in the Upper West Region (Babile, Hain, Ko, Lambussie, Wechiau).
– 5 in Brong-Afaho (Booma, Kwatire, Nkrankwanta, Techimantia, Wamfie).
– 5 in Greater Accra Province (Adentan, Ashiaman, Bortianor, Oduman, Sege).

University Hospital Jeanne Ebori

Gabon

Client

Ministry of Health

Key data

Beds: 176
Gross Floor Area: 17,500 m²

Implementation: 2016

The Project

Turn-key implementation of Mother & Child University Hospital.

Libreville University Clinics (CHL)

Gabon

Client

Ministry of Health

Key data

Beds: 276
Gross Floor Area: 28,000 m²

Implementation: 2016

The Project

Planning, construction and equipping of an emergency hospital, warranty for 1 year

Completion:
Phase 1 – 2014
Phase 2 – 2016

Regional Hopsital Fogo

Cabo Verde

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2016

The Project

Turn-Key extension of a Regional Hospital.

Kabarnet Hospital

Kenya

Client

Government of Baringo

Key data

Beds: 100
Gross Floor Area: –

Implementation: 2016

The Project

Extension of the existing hospital by a surgical block, supply and installation of technical medical equipment and medical gas system.

Libreville Owendo University Hospital

Gabon

Client

Ministry of Health

Key data

Beds: 120
Gross Floor Area: 16,700 m²

Implementation: 2014

The Project

Turn-key implementation of a University Hospital.

Monapo Hospital

Mozambique

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Turn-key implementation.

Senegal Telemedicine

Senegal

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Radiology and infrastructure and IT for the University Hospital of Dakar and 3 Regional Hospitals in Thies, Diourbel and Louga IT connection of 4 Hospitals.

Bamako Radiotherapy Centre Yirimadio

Mali

Client

Ministry of Health

Key data

Beds: 190
Gross Floor Area: –

Implementation: 2012

The Project

Turn-key implementation of a radiotherapy centre.

Angondje University Hospital & Cancer Institute Libreville

Gabon

Client

Ministry of Health, Gabon

Key data

Beds: 168
Gross Floor Area: 13,500 m²

Implementation: 2012

The Project

Planning & Construction of the University Hospital Angondje and Nuclear Therapy Libreville.

University Teaching Hospitals

Nigeria

Client

Ministry of Health, Nigeria

Key data

Beds: 7500
Gross Floor Area: 84,600 m2

Implementation: 2012

The Project

Medical equipment, upgrade.

Key data

Libreville HIAOBO Training Center for Army Doctors

Gabon

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

The Project

Turn-key implementation of a training center incl. housing for applicants.

Lambarene, Makokou & Tchibanga Regional Hospitals

Gabon

Client

Ministry of Health

Key data

Beds: 80
Gross Floor Area: –

Implementation: 2008

The Project

Turn-key implementation and total operation.

Gushegu District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 86
Gross Floor Area: 5,724 m²

Implementation: 2007

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Libreville Hôpital d'Instruction des Armees Omar Bongo Ondimba (HIAOBO)

Gabon

Client

Ministry of Defense, Gabon

Key data

Beds: 130
Gross Floor Area: 14,400 m²

Implementation: 2005

The Project

Turn-key Implementation, total operation. Design, engineering, construction, equipping, installation, testing and commisioning, extensions ongoing.

Begoro District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 60
Gross Floor Area: 5,000 m²

Implementation: 2003

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Regional Hospital Franceville

Gabon

Client

Ministère de la Santé Publique, Gabon

Key Data

Beds: 160
Gross Floor Area: –

Implementation: 2002

The Project

Turn-key Implementation.

District Hospital Abuja

Nigeria

Client

Federal Capital Development Authority

Key data

Beds: 60
Gross Floor Area: –

Implementation: 2001

The Project

Design, construction, mechanical and electrical building works, supply and installation of medical equipment and furniture, testing and commissioning. Training of users and maintanence staff including maintenance for a 6 month period.

Rural Health Centers Ethiopia

Ethiopia

Client

Ministry of Health, Ethiopia; Foreign Ministry, Austria

Key data

Beds: 30
Gross Floor Area: –

Implementation: 1991

The Project

Turn-key.

Rural Hospitals

Nigeria

Client

Ministry of Health, Nigeria

Key data

Beds: 44
Gross Floor Area: –

Implementation: 1991

The Project

Medical equipment.

Privatklinik Haikou - Hainan

China

Client

JVCO Hainan Unicare Hospital

Key data

Beds: 325
Gross Floor Area: 60,000 m²

Implementation: 2022

The Project

Planning, supply and installation of medical and IT equipment, operational management.

Songi District Hospital

Mongolia

Client

Ministry of Health

Key data

Beds: 200
Gross Floor Area: 18,000 m²

Implementation: 2019

The Project

Supply and installation of medical equipment.

Goroka Provincial Hospital

Papua New Guinea

Client

Ministry of Health

Key data

Beds: 300
Gross Floor Area: 7,930 m²

Implementation: 2018

The Project

Turn-key implementation.

Friendship Hospital Laos

Laos

Client

Ministry of Health

Key data

Beds: 308
Gross Floor Area:18,000 m²

Implementation: 2018

The Project

Design, construction, supply and installation of medical and non-medical equipment.

Beijing University International Hospital

China

Client

Beijing University International Hospital

Key data

Beds: 1900
Gross Floor Area: –

Implementation: 2017

The Project

Supply and installation of medical equipment.

Lao Radiotherapy Centre

Laos

Client

Ministry of Health of the Lao People’s Democratic Republic

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2016

The Project

  • Turnkey Implementation (Civil, Electrical & Mechanical and Sanitary)
  • Radiotherapy Equipment (Linear Accelerator, CT Simulator Unit complete with Planning and related Hardware & Software)
  • Equipment for examination room, doctor’s offices etc.
  • Hospital & Office Furniture etc.
  • Staff Training and 12 months Start Up Assistance
  • 24 months Maintenance

Laos Vientiane Radiotherapy

Laos

Client

Ministry of Health of the Lao People’s Democratic Republic

Key data

Beds: –
Gross Floor Area: 1,700 m²

Implementation: 2016

The Project

Turnkey Implementation (Civil, Electrical & Mechanical and Sanitary)
Radiotherapy Equipment (Linear Accelerator, CT Simulator Unit complete with Planning and related Hardware & Software)
Equipment for examination room, doctor’s offices etc.
Hospital & Office Furniture etc.
Staff Training and 12 months Start Up Assistance
24 months Maintenance

Dr. Midiyato Hospital

Indonesia

Client

Ministry of Defense, Indonesia

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2016

The Project

Supply and installation of medical equipment, UPS, Elevators, Medgas supply, CSSD, water tanks.

Affiliated People´s Hospital of Inner Mongolia University

China

Client

Affiliated People´s Hospital of Inner Mongolia University

Key data

Beds: –
Gross Floor Area: –

Implementation: 2015

The Project

Supply and installation of medical equipment.

Hue Central Hospital

Vietnam

Client

Ministry of Health Vietnam

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Planning, supply and installation of medical equipment

Hefei No 2 People´s Hospital

China

Client

Hefei No. 2 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ningxia Hui Autonomous Region People‘s Hospital Nanchang

China

Client

Ningxia Hui Autonomous Region People‘s Hospital Nanchang

Key data

Beds: 2.630
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Xuancheng People’s Hospital

China

Client

Xuancheng People’s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Putra Jaya National Cancer Institute (NCI)

Malaysia

Client

Kiara Teratai / IJM

Key data

Beds: 252
Gross Floor Area: 75,000 m²

Implementation: 2013

The Project

Planning, supply and installation of medical equipment

Xundian No.1 People´s Hospital

China

Client

Xundian No.1 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The project

Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.

Yingtan People´s Hospital

Yingtan

Client

Yingtan People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ziyang People´s Hospital

China

Client

Ziyang People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ziyang No.2 People´s Hospital

China

Client

Ziyang No. 2 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Shijiazhuang No.3 Hospital

China

Client

Shijiazhuang No.3 Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Qinghai Woman & Chrildren´s Hospital

China

Client

Qinghai Woman & Children´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Nanchang Hospital of Integrated Traditional and Western Medicine

China

Client

Nanchang Hospital of Integrated Traditional and Western Medicine

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Provincial People‘s Hospital Changsha

China

Client

Provincial People‘s Hospital Changsha

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Zigong No. 1 People’s Hospital

Zigong

Client

Zigong No. 1 People’s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply of medical equipment

Wuhu No.1 People´s Hospital

China

Client

Wuhu No.1 People´s Hospital

Key data

Beds: 800
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Hexian People‘s Hospital

China

Client

Hexian People‘s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Chongqing Three Gorges Vocational College

China

Client

Chongqing Three Gorges Vocational College

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of educational equipment.

Yingcheng People´s Hospital

China

Client

Yingcheng People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Wuan Hospital

China

Client

Wuan Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

Key data

Supply and installation of medical equipment.

Mahosot Hospital

Laos

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

The Project

Planning, supply and installation of medical equipment.

Sarawak International Medical Center

Malaysia

Client

Sarawak International Medical Center.

Key data

Beds: 200
Gross Floor Area: 60,000 m²

Implementation: 2010

The Project

Project Management, planning, supply and installation of medical equipment and hospital IT-system, Training of Hospital personnel, Maintenance for 2 years.

Wushan People´s Hospital

China

Client

Wushan People´s Hospital

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment.

Weixian Traditional Chinese Medicine Hospital

Weixian

Client

Weixian Traditional Chinese Medicine Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply of medical equipment

Qingyang People´s Hospital

China

Client

Quingyang People´s Hospital

Key data

Beds: 500
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment

Puhua Jinson Clinic

China, Beijing

Client

Key data

Beds: 30
Gross Floor Area: 1,700 m²

Implementation: 2010

The Project

Consultancy Services: design, functional planning.

Potalai Medical Spa

Thailand

Client

Photaria Co Ltd

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Consulting & project management for improvement and extension of SPA services.

Selangor Universiti Teknologi Mara

Malaysia

Client

Tunas Selatan Sdn. Bhd.

Key data

Beds: 86
Gross Floor Area: 26,000 m²

Implementation: 2009

The Project

Planning, supply and installation of medical equipment.

Laibin Municipal People’s Hospital

China

Client

Laibin Municipal People’s Hospital

Key data

Beds: 336
Gross Floor Area: –

Implementation: 2009

The Project

Supply and installation of medical equipment.

Kurunegala

Sri Lanka

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2009

The Project

Supply and installation of medical & mechanical equipment for 30 hospitals & health facilities.

Chaocheng Central Hospital Chaohu

China

Client

Chaocheng Central Hospital

Key data

Beds: 300
Gross Floor Area: –

Implementation: 2008

The Project

Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.

Hohhot Hospital No 4

China

Client

Hohhot Hospital No. 4

Key data

Beds: 260
Gross Floor Area: –

Implementation: 2008

The Project

Supply and installation of medical equipment.

Dongsheng District People’s Hospital Erdos

China

Client

Dongsheng District People’s Hospital Erdos

Key data

Beds: 198
Gross Floor Area: –

Implementation: 2008

The Project

Supply and installation of medical equipment.

Banda Aceh - Meuraxa Hospital

Indonesia

Client

Hilfswerk International

Key data

Beds: 366
Gross Floor Area: 5,600 m²

Implementation: 2007

The Project

Turn-key implementation of a general & children hospital

Kuala Lumpur Prince Court Medical Center (PCMC)

Kuala Lumpur

Client

Petronas

Key data

Beds: 280
Gross Floor Area: 100,000 m²

Implementation: 2007

The Project

Planning and medical equipment supply, total operation

Sungai Buloh Teaching Hospital

Malaysia

Client

Tunas Selatan Sdn. Bhd.

Key data

Beds: 620
Gross Floor Area: –

Implementation: 2006

The Project

Supply and installation of medical equipment.

15 hospitals in Vietnam

Vietnam

Client

PMU

Key data

Beds: –
Gross Floor Area: –

Implementation: 2006

The Project

Project management, planning, delivery, installation and commissioning of key medical and building services equipment, supervision of construction work, staff training, 1 year maintenance.

Tongliang Chinese Medical Hospital

China

Client

Tongliang Chinese Medical Hospital

Key data

Beds: 235
Gross Floor Area: –

Implementation: 2006

The Project

Supply and installation of medical equipment.

Wuyi Chinese Medical Hospital

China

Client

Wuyi Chinese Medical Hospital

Key data

Beds: 325
Gross Floor Area: –

Implementation: 2005

The Project

Supply and installation of medical equipment.

96 Hospitals in China

China

Client

Hospitals

Key data

Beds: –
Gross Floor Area: –

Implementation: 2005

The Project

Medical equipment.

Various hospitals in the Philippines

Philippines

Client

Department of Health

Key data

Beds: –
Gross Floor Area: 1.700

Completion year: 2003

The Project

Supply and installation of medical and environmental equipment.

Shanghai Yangpu District Central Hospital

China

Client

Shanghai Yangpu District Hospital

Key data

Beds: 350
Gross Floor Area: –

Implementation: 2003

The Project

Supply and installation of medical equipment.

Dr. Jamil and Dr. Sardjito Hospital

Indonesia

Client

Ministry of Health

Key data

Beds: 1390
Gross Floor Area: –

Implementation: 2002

The Project

Design and detailed engineering, installations and supply of medical equipment, project management, installation, testing and commissioning, training of hospital personnel, 2 years maintenance, 1 year Quality assurance programme for Dr. Jamil Hospital and Dr. Sardjito Hospital.

25 Hospitals

Vietnam

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2002

The Project

Installation of hospital waste incinerator.

Shanghai Baoshan Sitang Hospital

China

Client

Baoshan Health Bureau Shanghai

Key data

Beds: 400
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical equipment.

Surgical Center RSUD Dr. Soetomo Hospital Surabaya

Indonesia

Client

Ministry of Health

Key data

Beds: 1500
Gross Floor Area: –

Implementation: 1999

The Project

Design, engineering and supply of the mechanical, electrical and medical equipment; installation, testing, commissioning including staff training, quality assurance programme for 1 year, maintenance for 2 years.

Purwokerto General Hospital Indonesia

Indonesia

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: –

Implementation: 1995

The Project

Supply and installation of medical equipment

Shanghai First People's Hospital

China

Client

Municipality of Shanghai

Key data

Beds: 680
Gross Floor Area: –

Implementation:1993

The Project

Supply and installation of medical equipment.

Kuala Lumpur Cardio Thoracic Center

Kuala Lumpur

Client

Ministry of Health

Key data

Beds: 270
Gross Floor Area: –

Implementation: 1992

The Project

Turn-key implementation

Malaysia 71 Government Hospitals

Malaysia

Client

Faber Medi-Serve Sdn Bhd

Key data

Beds: 18,935
Gross Floor Area: 31,000 m²

Implementation: –

The Project

Hospital Support Services

Hospital de Sangre Grande

Trinidad and Tobago

Client

Corporación de Desarrollo Urbano de Trinidad and Tobago (UDECOTT)

Key data

Beds: 106
Gross Floor Area: 5.300 m²

Implementation: 2022

The Project

Planning, design, supply of medical equipment, staff training, as well as a 1-year warranty.
 

Level 3 Hospital Trinidad

Bolivia

Client

AISEM (Agencia de Infraestructura en Salud y Equipamiento Médico)

Key data

Beds: 205
Gross Floor Area: 22,639 m²

Implementation: 2021

The Project

Turn-key implementation.

Hospital Nueva Segovia

Nicaragua

Client

Ministry of Health 

Key data

Beds: 234
Gross Floor Area: 23,000 m²

Implementation: 2021

The Project

Turnkey implementation.

Point Fortin Hospital

Trinidad and Tobago

Client

 UDECOTT

Key data

Beds: 100
Gross Floor Area: 16,000 m²

Implementation: 2020

The Project

Turnkey implementation.

Hospital Zonal Suroeste

Argentina

Client

Agencia Cordoba de Inversion y Financiamiento (ACIF)

Key data

Beds: 14
Gross Floor Area: 5,300 m²

Implementation: 2020

The Project

The Zonal Suroeste hospital, which covers 5,300m2 in Corodoba, is a turnkey project. VAMED’s scope of services included management, planning, design, medical equipment, staff training, as well as a 1-year warranty.
The hospital has 14 outpatient clinics with all specialties; from a guard and emergency area to a shock room, four observation beds, triage special clinics and four operating rooms.

Hospital Manolo Morales

Nicaragua

Client

Ministry of Health 

Key data

Beds: 240
Gross Floor Area: 1,148 m²

Implementation: 2019

The Project

Turnkey hospital realized to provide medical services for the Radiology and Emergency Departments.

General Hospital Villa Tunari

Bolivia

Client

Ministry of Health

Key data

Beds: 200
Gross Floor Area: 21.400 m²

Implementation: 2019

The Project

Turn-key implementation. Main Contractor, Service, Planning Construction, Planning Equipment.

Hospital Santiago II

Bolivia

Client

Caja Nacional de Salud (CNS) Bolivia

Key data

Beds: 220
Gross Floor Area: 27,000 m²

Implementation: 2019

The Project

Project management, supply and installation of medical equipment, IT equipment, training and 2 years maintenance.

Ayacucho Hospital

Peru

Client

Consortium Hospital Ayacucho

Key data

Beds: 240
Gross Floor Area: 53,000 m²

Implementation: 2018

The Project

Supply and installation of medical equipment.

Hospital Occidental, Managua

Nicaragua

Client

Ministry of Health

Key data

Beds: 300
Gross Floor Area: 22,800 m²

Implementation: 2017

The Project

Supply and installation of medical equipment, maintenance for 36 months.

Hospital Bertha Calderon

Nicaragua

Client

Ministry of Health

Key data

Beds: 270
Gross Floor Area: – m²

Implementation: 2017

The Project

Supply and installation of the new emergency department, imaging equipment and maternity department.

Quito 3 Hospitals Ecuador

Ecuador

Client

Ministry of Health Ecuador

Key data

Beds: –
Gross Floor Area: – m²

Implementation: 2016

The Project

Supply and Installation of medical equipment for
– Hospital Pablo Arturo Suarez
– Teaching Hospital Calderón
– New Southern Maternity Hospital

Castries National Hospital St. Lucia

Santa Lucia

Client

Government of St. Lucia

Key data

Beds: –
Gross Floor Area: –

Implementation: 2015

The Project

Supply and installation of medical equipment.

San Fernando General Hospital

Trinidad and Tobago

Client

UDECOTT

Key data

Beds: 216
Gross Floor Area: 30,300 m²

Implementation: 2014

The Project

Functional concept, engineering, project management, renovation of existing building, supply & installation of medical & electro-mechanical equipment, training, maintenance.

Santa Rosa de Copan Hospital del Occidente Honduras

Honduras

Client

Ministry of Health Honduras

Key data

Beds: 400
Gross Floor Area: 25,000 m² 

Implementation: 2014

The Project

Turnkey implementation of the Radiology Department.

Hospital Leonardo Martinez, San Pedro Sula

Honduras

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: 68.000 m²

Implementation: 2013

The Project

Supply and installation of medical equipment.

San Pedro Sula Catarino Rivas Honduras

Honduras

Client

Ministry of Health Honduras

Key data

Beds: 500
Gross Floor Area: 75,000 m²

Implementation: 2013

The Project

Supply and installation of medical and non-medical equipment

Municipal Hospital St.Louis du Nord

Haiti

Client

Hilfswerk International

Key data

Beds: 20
Gross Floor Area: 720 m²

Implementation: 2010

The Project

Turnkey implementation of a community hospital.

Daniel Alcides Carrion Hospital, Callao

Peru

Client

Ministry of Health

Key data

Beds: 500
Gross Floor Area: –

Implementation: 2010

The Project

Supply and Installation of medical equipment.

Mobile Clinics

Dominican Republic

Client

Border Provinces Health & Social Development Authority

Key data

Beds: –
Gross Floor Area: –

Implementation: 2006

The Project

Planning, medical equipment supply for mobile clinics.

Dar Al Shifa Hospital

United Arab Emirates

Client

Dar Al Shifa Hospital LLC

Key data

Beds: 100
Gross Floor Area: 32,000 m²

Implementation: 2017

The Project

Turn-key implementation.

Ras Al Kahima Rashid Abdullah Hospital

United Arab Emirates

Client

China State Contraction Company LLC

Key data

Beds: 68
Gross Floor Area: 15,400 m²

Implementation: 2014

The Project

Supply and installation of medical equipment.

Al Ahli Hospital Doha

Qatar

Client

Al Ahli Hospital Corporation Q.S.C./ Contraco W.W.L., Qatar

Key data

Beds: 200
Gross Floor Area: –

Completion: 2006

The Project

Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works, Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture, warranty for 1 year.

Doha Al Ahli Hospital

Qatar

Client

Al Ahli Hospital

Key data

Beds: 200
Gross Floor Area: – m²

Implementation: 2004

The Project

Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works. Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture. warranty for 1 year.

Hufuf Al Ahsa Hospital

Saudi Arabia

Client

Al Ahsa Medical Ltd.

Key data

Beds: 300
Gross Floor Area: – m²

Implementation: 2003

The Project

Project Management, Design, engineering, supply and installation of medical equipment, Training of personnel, maintenance for 1 year.

6 Hospitals

Syria

Client

Key data

Beds: 140
Gross Floor Area: –

Implementation: 1995

The Project

Engineering, installation and supply of medical equipment, testing and commissioning. training of personnel, 3 years maintenance.

Tripoli University Hospital

Lebanon

Client

Ministry of Health

Key data

Beds: 1400
Gross Floor Area: –

Completion: 1992

The Project

Medical equipment and maintenance. Planning, supply and installation of medical equipment, maintenance, staff training, implementation of quality assurance programs, IT-supported maintenance and information systems.

Rehabilitation Center Yerevan

Armenia

Client

International Federation of Red Cross and Red Crescent Societies.

Key data

Beds: 120
Gross Floor Area: –

Implementation: 1992

The Project

Design and supply of complete medical equipment, including training of personnel. provision of management program, planning, and management assistance during the start-up period.

Muscat Private Hospital Bausher

Oman

Client

Oman Medical Projects Company (SAOG)

Key data

Beds: 120
Gross Floor Area: –

Implementation: 1990

The Project

Turn-key implementation.

8 Hospitals Iraq

Iraq

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: –

Implementation: 1986

The Project

Medical engineering, supply of the complete medical equipment and furniture, installation and commissioning plus the training of the personnel and maintenance for 5 years. The project involved six 260 bed maternity/child hospitals, and one 400 bed central child hospital and one 200 bed rehabilitation center.

Al Ain Hospital

United Arab Emirates

Client

Arabtec San Jose JV

Key data

Beds: 425
Gross Floor Area: –

Implementation: –

The Project

Total operation, modernisation of OT & ICU departments.

Nork Marash Medical Centre

Armenia

Client

Nork Marash Medical Centre

Key data

Beds: 75
Gross Floor Area: –

Implementation: 2018

The Project

Supply and installation of medical equipment.

Moscow Medsi CDC

Russia

Client

Moscow Medsi CDC

Key data

Beds: 20
Gross Floor Area: 22,800 m²

Implementation: 2015

The Project

Supply and installation of medical equipment.

MCS Intermed Hospital

Mongolia

Client

MCS Intermed Hospital

Key data

Beds: 91
Gross Floor Area: 13.000 m2

Implementation: 2014

The Project

Hospital planning, supply & Installation of medical equipment.

St. Petersburg AVA Peter Nord

Russia

Client

AVA Peter Nord

Key data

Beds: 120
Gross Floor Area: – m²

Implementation: 2014

The Project

Supply and installation of medical equipment.

Sochi Hospital Nº4

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 300
Gross Floor Area: 44,500 m²

Implementation: 2013

The Project

Turnkey hospital realized to provide medical services especially for the Olympic Winter Games 2014.

Regional Hospital No 1 Ochapovski, Krasnodar

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 1200
Gross Floor Area: 71,000 m²

Implementation: 2012

The Project

Turn-key implementation.

Health Improvement Project

Ukraine

Client

Ukrmedpstatsch

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment.

Hawari Hospital, Benghazi

Libya

Client

PWA (Public Works Authorities)

Key data

Beds: 520
Gross Floor Area: –

Implementation: 2008

The Project

Upgrade of the civil, mechanical, and electrical installations of the existing hospital. Training of personnel and warranty for 1 year.

Krasnodar Cardio Center

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 305
Gross Floor Area: 31,700 m²

Implementation: 2002

The Project

Turn-key implementation.

Al Essra Hospital

Jordan

Client

Al Essra Committee.

Key data

Beds: 100
Gross Floor Area: –

Implementation: 2001

The Project

Supply, installation and commissioning of medical equipment, training of hospital personnel.

Erzincan World Bank Project

Turkey

Client

World Bank.

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1996

The Project

Design, engineering and supervision of 3 hospitals.

3 Hospitals - Turkey

Turkey

Client

Ministry of Health

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1990

The Project

Supply and instalation of medical equipment for hospitals in Milas, Polatli and Susheri.

Kalamata General Hospital

Greece

Client

Key data

Beds: 280
Gross Floor Area: –

Implementation: 2000

The Project

Turn-key implementation. Construction, Medical equipment design and supply, installation, testing and commissioning; training of the hospital personnel, warranty for 2 years.

Cardiac Center Minsk

Belarus

Client

Department of Health of Minsk

Key data

Beds: –
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical and electro-mechanical equipment for the Cardiac Center of the 4th Minsk Clinic.
Training of personnel and 1 year guarantee.

Bratislava Radiotherapy Center

Slovakia

Client

National Oncological Institute Bratislava.

Key data

Beds: 30
Gross Floor Area: –

Implementation: 1996

The Project

Supply of medical equipment. General contractor and responsible for the complete design, construction, electro-mechanical systems and medical equipment supply.

Scroll to Top