NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

VAMED – a strong partner

VAMED provides services for hospitals and other healthcare facilities. The company, headquartered in Vienna, Austria, was founded in 1982. Since 1984, VAMED Engineering has been active in the areas of real estate development, facility and hospital management.

To date, the company has completed around 1,000 projects in more than 98 countries.

PROJECTS

1,000 projects

96 countries

over the last
40 years

SELECTION OF PROJECTS

Africa

Cacuaco General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 27,000 m²

Implementation: 26.07.2024

The Project

The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.

Viana General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 25,000 m²

Implementation: 23.04.2024

The Project

The Viana General Hospital, located in Luanda, Angola is being developed by VAMED in a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, as well as all construction works and installation.

This new hospital is located on a land of around 25,000 m2, and consists of a 3-storey main building and 5 smaller satellite buildings that function autonomously (the Maintenance Building, the Morgue Building, the Laundry Building, the Cafeteria Building and the Technical Building), essentially made up of ground floor and roof structures. In terms of services, it has five operating theatres, eight inpatient wards, a centralised diagnostic centre, an emergency service, obstetrics and gynaecology, paediatrics, orthopaedics and general medicine.

Urology and Nephrology Centre of Excellence

Ghana

Client

Ministry of Health

Key data

Beds: 101 + 30 Dialysis stations
Gross Floor Area: 7,800 m²

Implementation: 12.2023

The Project

Turn key / Design / Build / Equip /Finance /Train / 3 years Maintenance

Military Regional Hospital of Cabinda, Angola

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 102
Gross Floor Area: 11,450 m²

Implementation: 2022-2026

The Project

The Cabinda Regional Military Hospital is a state-of-the-art facility developed under a turn-key contract including design, construction, equipment, training, and 4 years of support. Located in the strategic enclave of Cabinda, Angola, it addresses the specific health needs of an isolated province by reducing the need for long-distance patient transfers. The hospital spans 11,450 m² and features 102 beds, emergency services, internal medicine, obstetrics, and rehabilitation. It includes an integrated diagnostic hub with CT, digital X-ray, ultrasound, and advanced labs for fast, coordinated care. Training and co-management strategies ensure sustained performance and safety. Together with the new General Hospital, it significantly enhances Cabinda’s healthcare infrastructure.

Military Regional Hospital of Huambo

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 201
Gross Floor Area: 17,300 m²

Implementation: 2022-2026

The Project

The Regional Military Hospital of Huambo, developed under a turn-key contract, includes concept, design, construction, equipment, training, and 4 years of management support. Spanning 17,300 m², it serves both military and civilian needs, and is a benchmark for advanced care in central Angola. Its integrated diagnostic hub houses MRI, multi-slice CT, digital X-ray with fluoroscopy, and high-definition ultrasound, enabling rapid, precise diagnostics. With 201 beds, the hospital offers specialized services in emergency, obstetrics, dialysis, rehab, and surgery. It addresses historic gaps in local healthcare, reducing reliance on distant facilities. Together with a new Maternity Hospital and extensive training programs, it forms a resilient medical network that elevates care in the region.

Military Regional Hospital of Luena

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 102
Gross Floor Area: 11,450 m²

Implementation: 2022-2026

The Project

The Luena Regional Military Hospital, under a turn-key contract including design, construction, equipment, training, and 4 years of support, is set to open in 2026. Built on 11,450 m², it addresses the healthcare needs of Angola’s eastern region. It features an advanced diagnostic hub with CT, digital X-ray with fluoroscopy, high-resolution ultrasound, and in-house lab services, enabling accurate, rapid diagnoses. With 102 beds, the hospital includes emergency and specialized wards to provide timely care. Located in remote Moxico province, it minimizes long-distance travel for treatment. Training programs and co-management strategies ensure sustainable performance. This facility marks a major step forward in healthcare access for Angola’s eastern frontier.

Maternity Upgrade Kenya – 20 Sites

Kenya

Client

Ministry of Health

Key data

Beds: 177 beds + 26 delivery beds
Gross Floor Area: 6,420 m2 total (across 20 facilities)

Implementation: N/A

The Project

To reduce maternal and newborn mortality, Kenya’s Ministry of Health is modernizing 20 maternity and neonatal units across 12 counties, with support from VAMED. The project enhances access to skilled care for low-income families, minimizing travel and costs. VAMED is responsible for design, construction, refurbishment, equipment supply, and staff training, with 36 months of maintenance included. The facilities will receive 177 beds, 26 delivery beds, 7 operating theatres, and essential equipment like incubators, ventilators, and oxygen generators. Training covers hygiene, emergency care, and includes a four-week observership in Finland. This initiative strengthens rural healthcare and improves maternal and newborn outcomes.

Eleven 40-bed Hospitals in Ashanti, Eastern Region and Greater Accra Regions and one Polyclinic in Brong-Ahafo

Ghana

Client

Ministry of Health

Key data

Beds: 470 (40 for each Hospital and 30 for the Polyclinic)
Gross Floor Area: total sqm of 11 Hospitals + 1 Polyclinic: 26,200 m²

Implementation:

o Commencement: 27th September 2021
o Taking-over Certificate/Completion. Issued on 9th September 2024

The Project

The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.

4 Regional Hospitals

Guinea

Client

Ministry of Health

Key data

Beds: 100-110
Gross Floor Area: 10,000-12,000 m²

Implementation: 2023

The Project

With four hospitals delivered in 2022, VAMED France is now the leading healthcare operator in Côte d’Ivoire. A Memorandum of Understanding (MoU) has been signed for two new General Hospitals and one Regional Hospital, currently in the final decision phase. In 2023, VAMED HQ (Vienna), VAMED France (Paris), and VAMED Côte d’Ivoire (Abidjan) jointly advanced three new hospital projects under a “Protocole d’Accord” with the Ministry of Health. Each facility (100–110 beds, 10,000–12,000 m²) will include Emergency, Outpatient, Internal and Surgical Medicine, Pediatrics, Gynecology, a Metabolic Diseases Unit, MEQ (incl. CT), and Labs. Preliminary designs were validated in November 2023; final negotiations are underway.

Urology and Nephrology Centre of Excellence - Korle Bu Teaching Hospital

Ghana

Client

Ministery of Health.  End User: Korle Bu Teaching Hospital

Key data

Beds: 101 + 30 Dialysis Stations
Gross Floor Area: 7,800 m²

Implementation: 07.2021 – 12.2023

The Project

The Urology and Nephrology Centre of Excellence at Korle Bu Teaching Hospital spans 7,800 m² across three blocks and delivers advanced inpatient and outpatient care. It features 101 beds, 4 ICU beds, and 3 operating theatres—two major ones next to the CSSD for efficient logistics, and a minor one in the outpatient area. The facility includes 30 Hemodialysis stations with separate access and a cutting-edge imaging unit with CT, fluoroscopy, ultrasound, and lithotripter. A 100-seat teaching room supports clinical training. Completed in 30 months and handed over in December 2023, it includes further staff training and technical management by VAMED through 2026. This centre meets critical urology and nephrology needs in an underserved region with top-tier care.

2 new General Hospitals and 1 Regional Hospital

Ivory Coast

Client

Key data

Beds: 200 (each hospital)
Gross Floor Area: N/A m²

Implementation: 2024

The Project

VAMED France, in consortium with EIFFAGE and EGIS, is developing four 200-bed Regional Hospitals in Guinea. Phase 1 includes Kindia and Labé; optional Phase 2 covers Kankan and N’zerekore. VAMED France is responsible for medical equipment—engineering, procurement, delivery, installation, commissioning, and a one-year warranty. Site preparation has begun in Kindia, with formal commencement expected in March 2024. Beyond supplying MEQ, VAMED was selected as the healthcare expert for the project, providing technical advisory support across the full value chain of these turnkey hospital developments.

5 District Hospitals + 1 Polyclinic

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 370
Gross Floor Area: 27,090 m²

Implementation: 2020

The Project

Construction of 5 district Hospitals in Ghana’s northern region in Sawla, Tolon and Buipe, Eastern Region in Somanya and Volta Region in Wheta as well as a polyclinic in Northern Region in Bamboi.

Ghana 20 Polyclinics

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 375
Gross Floor Area: 18,250 m²

Implementation: 2017

The Project

Turnkey construction of 15 polyclinics:
– 5 in the Northern Region (Janga, Karaga, Chereponi, Tatale, Kpandai).
– 5 in the Upper West Region (Babile, Hain, Ko, Lambussie, Wechiau).
– 5 in Brong-Afaho (Booma, Kwatire, Nkrankwanta, Techimantia, Wamfie).
– 5 in Greater Accra Province (Adentan, Ashiaman, Bortianor, Oduman, Sege).

University Hospital Jeanne Ebori

Gabon

Client

Ministry of Health

Key data

Beds: 176
Gross Floor Area: 17,500 m²

Implementation: 2016

The Project

Turn-key implementation of Mother & Child University Hospital.

Libreville University Clinics (CHL)

Gabon

Client

Ministry of Health

Key data

Beds: 276
Gross Floor Area: 28,000 m²

Implementation: 2016

The Project

Planning, construction and equipping of an emergency hospital, warranty for 1 year

Completion:
Phase 1 – 2014
Phase 2 – 2016

Regional Hopsital Fogo

Cabo Verde

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2016

The Project

Turn-Key extension of a Regional Hospital.

Kabarnet Hospital

Kenya

Client

Government of Baringo

Key data

Beds: 100
Gross Floor Area: –

Implementation: 2016

The Project

Extension of the existing hospital by a surgical block, supply and installation of technical medical equipment and medical gas system.

Libreville Owendo University Hospital

Gabon

Client

Ministry of Health

Key data

Beds: 120
Gross Floor Area: 16,700 m²

Implementation: 2014

The Project

Turn-key implementation of a University Hospital.

Monapo Hospital

Mozambique

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Turn-key implementation.

Senegal Telemedicine

Senegal

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Radiology and infrastructure and IT for the University Hospital of Dakar and 3 Regional Hospitals in Thies, Diourbel and Louga IT connection of 4 Hospitals.

Bamako Radiotherapy Centre Yirimadio

Mali

Client

Ministry of Health

Key data

Beds: 190
Gross Floor Area: –

Implementation: 2012

The Project

Turn-key implementation of a radiotherapy centre.

Angondje University Hospital & Cancer Institute Libreville

Gabon

Client

Ministry of Health, Gabon

Key data

Beds: 168
Gross Floor Area: 13,500 m²

Implementation: 2012

The Project

Planning & Construction of the University Hospital Angondje and Nuclear Therapy Libreville.

University Teaching Hospitals

Nigeria

Client

Ministry of Health, Nigeria

Key data

Beds: 7500
Gross Floor Area: 84,600 m2

Implementation: 2012

The Project

Medical equipment, upgrade.

Key data

Libreville HIAOBO Training Center for Army Doctors

Gabon

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

The Project

Turn-key implementation of a training center incl. housing for applicants.

Lambarene, Makokou & Tchibanga Regional Hospitals

Gabon

Client

Ministry of Health

Key data

Beds: 80
Gross Floor Area: –

Implementation: 2008

The Project

Turn-key implementation and total operation.

Gushegu District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 86
Gross Floor Area: 5,724 m²

Implementation: 2007

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Libreville Hôpital d'Instruction des Armees Omar Bongo Ondimba (HIAOBO)

Gabon

Client

Ministry of Defense, Gabon

Key data

Beds: 130
Gross Floor Area: 14,400 m²

Implementation: 2005

The Project

Turn-key Implementation, total operation. Design, engineering, construction, equipping, installation, testing and commisioning, extensions ongoing.

Begoro District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 60
Gross Floor Area: 5,000 m²

Implementation: 2003

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Regional Hospital Franceville

Gabon

Client

Ministère de la Santé Publique, Gabon

Key Data

Beds: 160
Gross Floor Area: –

Implementation: 2002

The Project

Turn-key Implementation.

District Hospital Abuja

Nigeria

Client

Federal Capital Development Authority

Key data

Beds: 60
Gross Floor Area: –

Implementation: 2001

The Project

Design, construction, mechanical and electrical building works, supply and installation of medical equipment and furniture, testing and commissioning. Training of users and maintanence staff including maintenance for a 6 month period.

Rural Health Centers Ethiopia

Ethiopia

Client

Ministry of Health, Ethiopia; Foreign Ministry, Austria

Key data

Beds: 30
Gross Floor Area: –

Implementation: 1991

The Project

Turn-key.

Rural Hospitals

Nigeria

Client

Ministry of Health, Nigeria

Key data

Beds: 44
Gross Floor Area: –

Implementation: 1991

The Project

Medical equipment.

Privatklinik Haikou - Hainan

China

Client

JVCO Hainan Unicare Hospital

Key data

Beds: 325
Gross Floor Area: 60,000 m²

Implementation: 2022

The Project

Planning, supply and installation of medical and IT equipment, operational management.

Songinokhairkhan District Hospital

Mongolia

Client

Ministry of Health

Key data

Beds: 200
Gross Floor Area: 18,000 m²

Implementation: 2017 – 2021

The Project

The 200-bed District Hospital in Songinokhairkhan, Ulaanbaatar—the largest district in Mongolia—was built under the ADB-funded “Fourth Health Sector Development Program.” As a turn-key project, it replaced outdated infrastructure, ensuring first-class healthcare delivery and expanding access to specialized primary care. The hospital serves both local residents and referred patients from Bayangol District. VAMED’s scope included full construction and equipping, as well as support for human resource development. Commissioned during the COVID-19 pandemic, the facility is equipped to operate under emergency conditions, enhancing resilience and health service quality in the capital.

Goroka Regional Hospital

Papua New Guinea

Client

Ministry of Health

Key data

Beds: 300
Gross Floor Area: 7,980 m²

Implementation: 2014 – 2018

The Project

 The location of the Hospital on the Eastern Highlands poses particular implementation challenges, as the nearest port is about 300 km away. Still, the modernization and exten-sion of the Goroka Provincial Hospital was successfully completed in 2018. With its newly constructed and modernized areas, the Hospital features around 300 patient beds, locat-ed in a remote region in the island’s interior about 1,600 meters above sea level. The project comprised the turn-key construction of a new central hospital building com-prising following departments: Accident and Emergency, Critical Care Unit, Outpatient Clinics, Radiology, Operating Theaters, Endoscopy, Intensive-Care Unit, Laboratory, Woman Healths & Birthing Suite and Central Sterilization Unit.

Friendship Hospital - Vientiane

Laos

Client

Ministry of Health

Key data

Beds: 150
Gross Floor Area: 24,000 m²

Implementation: 2015 – 2019

The Project

The Friendship Hospital in Vientiane is a leading public healthcare and the main university teaching and research facility in Laos. It specializes in treating orthopedic, neurological, and kidney-related conditions. Extension works were executed in two phases, covering the design, construction, and full equipping of new facilities with medical and non-medical items. VAMED’s scope included comprehensive training programs—both locally and in Europe—and ongoing technical maintenance by VAMED specialists, ensuring sustainable operation and enhanced care quality in one of the country’s most important hospitals.

Beijing University International Hospital

China

Client

Beijing University International Hospital

Key data

Beds: 1900
Gross Floor Area: –

Implementation: 2017

The Project

Supply and installation of medical equipment.

Radiotherapy Center
Friendship Hospital - Vientiane

Laos

Client

Ministry of Health

Key data

Beds: N/A
Gross Floor Area: 1700 m² (net)

Implementation: 2014 – 2017

The Project

The Friendship Hospital in Vientiane is one of Laos’ leading public healthcare and teaching facilities. As part of the national hospital upgrade program, VAMED delivered the country’s first MRI and implemented the first radiotherapy department during Phase 1. The project included a turnkey radiotherapy building, equipment supply, and extensive training and start-up support. The hospital specializes in orthopaedics, neurology, and kidney disease treatment, and serves as Laos’ primary university teaching and research hospital—marking a significant advancement in the nation’s medical capabilities.

Dr. Midiyato Hospital

Indonesia

Client

Ministry of Defense, Indonesia

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2016

The Project

Supply and installation of medical equipment, UPS, Elevators, Medgas supply, CSSD, water tanks.

Affiliated People´s Hospital of Inner Mongolia University

China

Client

Affiliated People´s Hospital of Inner Mongolia University

Key data

Beds: –
Gross Floor Area: –

Implementation: 2015

The Project

Supply and installation of medical equipment.

Hue Central Hospital

Vietnam

Client

Ministry of Health Vietnam

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Planning, supply and installation of medical equipment

Hefei No 2 People´s Hospital

China

Client

Hefei No. 2 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ningxia Hui Autonomous Region People‘s Hospital Nanchang

China

Client

Ningxia Hui Autonomous Region People‘s Hospital Nanchang

Key data

Beds: 2.630
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Xuancheng People’s Hospital

China

Client

Xuancheng People’s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

National Cancer Institute (NCI)

Malaysia

Client

JV Kiara Teratai / IJM Construction, Malaysia

Key data

Beds: 252
Gross Floor Area: 75,000 m²

Implementation: 2011 – 2013

The Project

The National Referral Centre for Cancer Treatment in Malaysia is the country’s most advanced cancer care facility. VAMED Engineering was responsible for the specification, supply, installation, commissioning, and training for high-end medical equipment across key departments: Radiology (CT, MRI, Angiography), Radiotherapy (Linear Accelerator, Tomotherapy, Brachytherapy, Radiosurgery), Nuclear Medicine (PET/CT), Surgical and ICU, and Laboratory (Histology, Hematology). These state-of-the-art facilities enable cutting-edge diagnostics and treatment, significantly advancing cancer care capabilities in Malaysia.

Xundian No.1 People´s Hospital

China

Client

Xundian No.1 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The project

Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.

Yingtan People´s Hospital

Yingtan

Client

Yingtan People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ziyang People´s Hospital

China

Client

Ziyang People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Ziyang No.2 People´s Hospital

China

Client

Ziyang No. 2 People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Shijiazhuang No.3 Hospital

China

Client

Shijiazhuang No.3 Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Qinghai Woman & Chrildren´s Hospital

China

Client

Qinghai Woman & Children´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Nanchang Hospital of Integrated Traditional and Western Medicine

China

Client

Nanchang Hospital of Integrated Traditional and Western Medicine

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Provincial People‘s Hospital Changsha

China

Client

Provincial People‘s Hospital Changsha

Key data

Beds: –
Gross Floor Area: –

Implementation: 2013

The Project

Supply and installation of medical equipment.

Zigong No. 1 People’s Hospital

Zigong

Client

Zigong No. 1 People’s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply of medical equipment

Wuhu No.1 People´s Hospital

China

Client

Wuhu No.1 People´s Hospital

Key data

Beds: 800
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Hexian People‘s Hospital

China

Client

Hexian People‘s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Chongqing Three Gorges Vocational College

China

Client

Chongqing Three Gorges Vocational College

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of educational equipment.

Yingcheng People´s Hospital

China

Client

Yingcheng People´s Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2012

The Project

Supply and installation of medical equipment.

Wuan Hospital

China

Client

Wuan Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

Key data

Supply and installation of medical equipment.

Mahosot Hospital

Laos

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2011

The Project

Planning, supply and installation of medical equipment.

Sarawak International Medical Center

Malaysia

Client

Sarawak International Medical Center.

Key data

Beds: 200
Gross Floor Area: 60,000 m²

Implementation: 2010

The Project

Project Management, planning, supply and installation of medical equipment and hospital IT-system, Training of Hospital personnel, Maintenance for 2 years.

Wushan People´s Hospital

China

Client

Wushan People´s Hospital

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment.

Weixian Traditional Chinese Medicine Hospital

Weixian

Client

Weixian Traditional Chinese Medicine Hospital

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply of medical equipment

Qingyang People´s Hospital

China

Client

Quingyang People´s Hospital

Key data

Beds: 500
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment

Puhua Jinson Clinic

China, Beijing

Client

Key data

Beds: 30
Gross Floor Area: 1,700 m²

Implementation: 2010

The Project

Consultancy Services: design, functional planning.

Potalai Medical Spa

Thailand

Client

Photaria Co Ltd

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Consulting & project management for improvement and extension of SPA services.

Universiti Teknologi Mara (UiTM)

Malaysia

Client

TRIplc Resources (TRI) Sdn Bhd

Key data

Beds: 400
Gross Floor Area: – m²

Implementation: 2019 – 2021

The Project

The new Universiti Teknologi MARA (UiTM) Hospital in Puncak Alam, Selangor, Malaysia, is a 400-bed teaching and tertiary care hospital for undergraduate and postgraduate medical studies. Managed by the Ministry of Education, the campus includes academic facilities and accommodations. UiTM Hospital also serves as a general hospital for tertiary care referrals. VAMED’s scope included the supply, installation, and commissioning of medical and non-medical equipment, along with a 3-year comprehensive maintenance service. Despite COVID-19 challenges, the project was completed on schedule, supporting Malaysia’s medical education and healthcare infrastructure.

Laibin Municipal People’s Hospital

China

Client

Laibin Municipal People’s Hospital

Key data

Beds: 336
Gross Floor Area: –

Implementation: 2009

The Project

Supply and installation of medical equipment.

Kurunegala

Sri Lanka

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2009

The Project

Supply and installation of medical & mechanical equipment for 30 hospitals & health facilities.

Chaocheng Central Hospital Chaohu

China

Client

Chaocheng Central Hospital

Key data

Beds: 300
Gross Floor Area: –

Implementation: 2008

The Project

Design, engineering, supply and installation of medical equipment, training of personnel, maintenance for 1 year.

Hohhot Hospital No 4

China

Client

Hohhot Hospital No. 4

Key data

Beds: 260
Gross Floor Area: –

Implementation: 2008

The Project

Supply and installation of medical equipment.

Dongsheng District People’s Hospital Erdos

China

Client

Dongsheng District People’s Hospital Erdos

Key data

Beds: 198
Gross Floor Area: –

Implementation: 2008

The Project

Supply and installation of medical equipment.

Banda Aceh - Meuraxa Hospital

Indonesia

Client

Hilfswerk International

Key data

Beds: 366
Gross Floor Area: 5,600 m²

Implementation: 2007

The Project

Turn-key implementation of a general & children hospital

Kuala Lumpur Prince Court Medical Center (PCMC)

Kuala Lumpur

Client

Petronas

Key data

Beds: 280
Gross Floor Area: 100,000 m²

Implementation: 2007

The Project

Planning and medical equipment supply, total operation

Sungai Buloh Teaching Hospital

Malaysia

Client

Tunas Selatan Sdn. Bhd.

Key data

Beds: 620
Gross Floor Area: –

Implementation: 2006

The Project

Supply and installation of medical equipment.

15 hospitals in Vietnam

Vietnam

Client

PMU

Key data

Beds: –
Gross Floor Area: –

Implementation: 2006

The Project

Project management, planning, delivery, installation and commissioning of key medical and building services equipment, supervision of construction work, staff training, 1 year maintenance.

Tongliang Chinese Medical Hospital

China

Client

Tongliang Chinese Medical Hospital

Key data

Beds: 235
Gross Floor Area: –

Implementation: 2006

The Project

Supply and installation of medical equipment.

Wuyi Chinese Medical Hospital

China

Client

Wuyi Chinese Medical Hospital

Key data

Beds: 325
Gross Floor Area: –

Implementation: 2005

The Project

Supply and installation of medical equipment.

Various hospitals in the Philippines

Philippines

Client

Department of Health

Key data

Beds: –
Gross Floor Area: 1.700

Completion year: 2003

The Project

Supply and installation of medical and environmental equipment.

Shanghai Yangpu District Central Hospital

China

Client

Shanghai Yangpu District Hospital

Key data

Beds: 350
Gross Floor Area: –

Implementation: 2003

The Project

Supply and installation of medical equipment.

Dr. Jamil and Dr. Sardjito Hospital

Indonesia

Client

Ministry of Health

Key data

Beds: 1390
Gross Floor Area: –

Implementation: 2002

The Project

Design and detailed engineering, installations and supply of medical equipment, project management, installation, testing and commissioning, training of hospital personnel, 2 years maintenance, 1 year Quality assurance programme for Dr. Jamil Hospital and Dr. Sardjito Hospital.

25 Hospitals

Vietnam

Client

Ministry of Health

Key data

Beds: –
Gross Floor Area: –

Implementation: 2002

The Project

Installation of hospital waste incinerator.

Shanghai Baoshan Sitang Hospital

China

Client

Baoshan Health Bureau Shanghai

Key data

Beds: 400
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical equipment.

Surgical Center RSUD Dr. Soetomo Hospital Surabaya

Indonesia

Client

Ministry of Health

Key data

Beds: 1500
Gross Floor Area: –

Implementation: 1999

The Project

Design, engineering and supply of the mechanical, electrical and medical equipment; installation, testing, commissioning including staff training, quality assurance programme for 1 year, maintenance for 2 years.

Purwokerto General Hospital Indonesia

Indonesia

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: –

Implementation: 1995

The Project

Supply and installation of medical equipment

Shanghai First People's Hospital

China

Client

Municipality of Shanghai

Key data

Beds: 680
Gross Floor Area: –

Implementation:1993

The Project

Supply and installation of medical equipment.

Kuala Lumpur Cardio Thoracic Center

Kuala Lumpur

Client

Ministry of Health

Key data

Beds: 270
Gross Floor Area: –

Implementation: 1992

The Project

Turn-key implementation

Malaysia 71 Government Hospitals

Malaysia

Client

Faber Medi-Serve Sdn Bhd

Key data

Beds: 18,935
Gross Floor Area: 31,000 m²

Implementation: –

The Project

Hospital Support Services

Guyana Paediatric and Maternal Hospital

Guyana

Client

Ministry of Health

Key data

Beds: 256
Gross Floor Area: 24,000 m²

Implementation: On Going

The Project

The Guyana Pediatric and Maternal Hospital (GPMH) is a landmark project under an MoU between the Governments of Austria and Guyana, part of a wider effort to modernize Guyana’s public healthcare. Addressing historic gaps in funding and access to specialized care, GPMH serves both Georgetown and remote hinterland communities. This state-of-the-art facility provides comprehensive services across specialized departments, including Accident & Emergency, Outpatients, Surgery, ICU, Obstetrics, Imaging, Radiology, Endoscopy, Dialysis, Chemotherapy, Lab Services, and a Mortuary. GPMH is a critical step toward equitable, high-quality care for women and children in Guyana.

New Amsterdam Hospital Campus

Guyana

Client

Ministry of Health, Angola

Key data

Beds: 230
Gross Floor Area: 24,000 m²

Implementation: On Going

The Project

The New Amsterdam Hospital Campus is a landmark project under an MoU between the Governments of Austria and Guyana, aiming to address major gaps in Guyana’s public healthcare system. Designed as a modern, sustainable facility, it offers emergency, inpatient, and outpatient care, surgical theatres, diagnostic and treatment areas, a pharmacy, labs, central sterilization, a mental health clinic, and a teaching facility. This campus decentralizes access to high-quality care, integrates clinical training, and promotes mental health support. As a catalyst for long-term transformation, it sets a model for regional hospital development and improved health equity in Guyana.

Hospital de Sangre Grande

Trinidad and Tobago

Client

Corporación de Desarrollo Urbano de Trinidad and Tobago (UDECOTT)

Key data

Beds: 106
Gross Floor Area: 18.000 m²

Implementation: 2020 – 2024

The Project

The New Sangre Grande Hospital is a flagship healthcare project in eastern Trinidad, part of a national initiative to modernize public health services. It marks VAMED’s third hospital project in Trinidad and Tobago, following Point Fortin and San Fernando Teaching Hospitals. Delivered as a full turn-key project, VAMED was responsible for planning, design, construction, equipment supply, commissioning, staff training, and maintenance. The hospital includes outpatient care, diagnostics, lab, pharmacy, imaging (CT, MRI, fluoroscopy), central sterile services, and surgery with 4 operating theatres (including one for endoscopy), as well as rehabilitation services—offering comprehensive, modern care.
 

Level 3 Hospital Trinidad

Bolivia

Client

AISEM (Agencia de Infraestructura en Salud y Equipamiento Médico)

Key data

Beds: 205
Gross Floor Area: 22,639 m²

Implementation: 2021

The Project

Turn-key implementation.

Hospital Nueva Segovia

Nicaragua

Client

Ministry of Health of the Republic of Nicaragua

Key data

Beds: 234
Gross Floor Area: 23,600 m²

Implementation: On Going

The Project

Located in Ocotal, Nueva Segovia, about 225 km from Managua, the new “Hospital Departmental de Nueva Segovia” replaces a 60-year-old facility. Awarded to VAMED in late 2018, the project includes construction, equipment delivery, installation, training, and maintenance. With approximately 230 beds, the hospital offers services in internal medicine, surgery, pediatrics, orthopedics, ophthalmology, and ENT. It features five operating theatres, adult and pediatric ICUs, and neonatology. Serving over 260,000 people, it sets new medical standards for northern Nicaragua and stands as a key reference project in the national healthcare system.

Point Fortin Hospital

Trinidad and Tobago

Client

 UDECOTT

Key data

Beds: 100
Net Floor Area: 16,000 m²

Implementation: 2015 – 2020

The Project

This turn-key contract covers the planning, construction, furnishing, and full equipping of a new 3-storey general hospital in Trinidad & Tobago, including both medical and non-medical equipment. It also includes start-up services, staff training, and 3 years of maintenance. The hospital will specialize in burn treatment, addressing needs linked to the region’s major liquid gas industry. Additional departments include Emergency, Radiology, Surgery, Physiotherapy, Outpatient, and Psychiatry. The project aims to deliver a modern, fully integrated healthcare facility tailored to the specific needs of the local population.

Hospital Zonal Suroeste

Argentina

Client

Ministry of Health

Key data

Beds: 25
Gross Floor Area: 5,000 m²

Implementation: 2020

The Project

The Hospital del Suroeste is a flagship project by the Government of Córdoba aimed at modernizing and decentralizing the public health system. Located in Los Filtros, one of the city’s most densely populated and underserved neighborhoods, the hospital will serve over 250,000 residents in the southwest zone of Córdoba and nearby areas. This state-of-the-art facility is strategically positioned to improve healthcare access and reduce the burden on central hospitals like Hospital San Roque and Hospital Misericordia. It represents a major step toward delivering quality, equitable care to historically underserved communities.

Hospital Manolo Morales

Nicaragua

Client

Ministry of Health 

Key data

Beds: 240
Gross Floor Area: 1,148 m²

Implementation: 2019

The Project

Turnkey hospital realized to provide medical services for the Radiology and Emergency Departments.

General Hospital Villa Tunari

Bolivia

Client

AISEM

Key data

Beds: 200
Gross Floor Area: 21.000 m²

Implementation: 2018 – 2022

The Project

As part of Bolivia’s national healthcare modernization masterplan, the tertiary hospital in Villa Tunari, Cochabamba Province, is designed to deliver state-of-the-art diagnostics, treatment, and hospitalization. The hospital also serves as a training site for medical students under the guidance of expert clinicians. Key service areas include obstetrics, dialysis, cancer chemotherapy, and trauma care, including ICU services for road accident victims. Additional functions encompass emergency and outpatient services, diagnostics, imaging, laboratory and pharmacy, surgery with ICU, day clinic, rehabilitation, therapies, and mortuary and pathology services—ensuring comprehensive regional care.

Hospital Santiago II

Bolivia

Client

Caja Nacional de Salud (CNS) Bolivia

Key data

Beds: 220
Gross Floor Area: 27,000 m²

Implementation: 2019

The Project

Project management, supply and installation of medical equipment, IT equipment, training and 2 years maintenance.

Ayacucho Hospital

Peru

Client

Consortium Hospital Ayacucho

Key data

Beds: 240
Gross Floor Area: 53,000 m²

Implementation: 2018

The Project

Supply and installation of medical equipment.

Hospital Occidental, Managua

Nicaragua

Client

Ministry of Health

Key data

Beds: 300
Gross Floor Area: 22,800 m²

Implementation: 2017

The Project

Supply and installation of medical equipment, maintenance for 36 months.

Hospital Bertha Calderon

Nicaragua

Client

Ministry of Health

Key data

Beds: 270
Gross Floor Area: – m²

Implementation: 2017

The Project

Supply and installation of the new emergency department, imaging equipment and maternity department.

Quito 3 Hospitals Ecuador

Ecuador

Client

Ministry of Health Ecuador

Key data

Beds: –
Gross Floor Area: – m²

Implementation: 2016

The Project

Supply and Installation of medical equipment for
– Hospital Pablo Arturo Suarez
– Teaching Hospital Calderón
– New Southern Maternity Hospital

Castries National Hospital St. Lucia

Santa Lucia

Client

Government of St. Lucia

Key data

Beds: –
Gross Floor Area: –

Implementation: 2015

The Project

Supply and installation of medical equipment.

San Fernando General Hospital

Trinidad and Tobago

Client

UDECOTT

Key data

Beds: 216
Gross Floor Area: 30,300 m²

Implementation: 2014

The Project

Functional concept, engineering, project management, renovation of existing building, supply & installation of medical & electro-mechanical equipment, training, maintenance.

Santa Rosa de Copan Hospital del Occidente Honduras

Honduras

Client

Ministry of Health Honduras

Key data

Beds: 400
Gross Floor Area: 25,000 m² 

Implementation: 2014

The Project

Turnkey implementation of the Radiology Department.

Hospital Leonardo Martinez, San Pedro Sula

Honduras

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: 68.000 m²

Implementation: 2013

The Project

Supply and installation of medical equipment.

San Pedro Sula Catarino Rivas Honduras

Honduras

Client

Ministry of Health Honduras

Key data

Beds: 500
Gross Floor Area: 75,000 m²

Implementation: 2013

The Project

Supply and installation of medical and non-medical equipment

Municipal Hospital St.Louis du Nord

Haiti

Client

Hilfswerk International

Key data

Beds: 20
Gross Floor Area: 720 m²

Implementation: 2010

The Project

Turnkey implementation of a community hospital.

Daniel Alcides Carrion Hospital, Callao

Peru

Client

Ministry of Health

Key data

Beds: 500
Gross Floor Area: –

Implementation: 2010

The Project

Supply and Installation of medical equipment.

Mobile Clinics

Dominican Republic

Client

Border Provinces Health & Social Development Authority

Key data

Beds: –
Gross Floor Area: –

Implementation: 2006

The Project

Planning, medical equipment supply for mobile clinics.

NEW AL AIN HOSPITAL (STMC)

United Arab Emirates

Client

SEHA (Main contractor ARABTECH – SAN JOSE JV)

Key data

Beds: 719
Gross Floor Area: 341,860.820 m²

Implementation: Ongoing / 2020-2026

The Project

The New Al Ain Hospital, now named STMC, in Abu Dhabi provides state-of-the-art medical care aligned with international standards. With 719 beds—including 510 for general care, 67 ICU, and 142 for rehabilitation—the facility features 104 specialized clinics, 12 operating theatres (including 1 hybrid), 20 radiology rooms, advanced endoscopy suites, a robotic pharmacy, and a hyperbaric chamber system. An educational and simulation center with training rooms and a central library is also included. VAMED’s scope covered supply, project management, engineering, IT integration, installation, staff training, and a 3-year comprehensive warranty for all medical equipment.

THE ROYAL OMAN POLICE NEW HOSPITAL PROJECT (MEDICAL CITY HOSPITAL FROR MIL-ITARY & SECURITY SERVICES – MUSCAT)

Oman

Client

ROYAL OMAN POLICE. Contractor/ Client: GALFAR Engineering & Contracting SAOG

Key data

Beds: 459
Gross Floor Area: 185,000 m²

Implementation: 2020

The Project

In Muscat’s Airport Heights, the Sultanate of Oman is constructing the Royal Oman Police Hospital, spanning 185,000 m² with an initial capacity of 459 beds, expandable to 600. The hospital will serve military and security personnel and their families, offering care in oncology, traumatology, pediatrics, gynecology, cardiology, and surgery. VAMED was awarded project management and MEP systems supply, including Medical Gas Systems, Nurse Call System, Laminar Flow & Critical Environment Diffusers, and a Photovoltaic System. VAMED also handles the supply, installation, testing, commissioning, training, and 3-year warranty for the full Medical & Laboratory Equipment Package.

AL REEM HOSPITAL

United Arab Emirates

Client

Blue Apple Property Management LLC, UAE

Key data

Beds: 219
Gross Floor Area: 48,600 m²

Implementation: 2020

The Project

Reem Hospital comprises three advanced healthcare facilities operated by VAMED. The Family Medicine Centre (FMC) includes 32 clinics initially (expanding to 47), offering comprehensive specialty care with a focus on pediatrics. FMC physicians also access 25 acute care beds for short stays. The second facility is a 73-bed medical rehabilitation center providing intensive orthopedic, neurologic, cardiologic, and oncologic rehab for in- and out-patients. The third is a 119-bed specialized pediatrics and women’s hospital, operated with a leading clinical partner. VAMED aims to establish Reem Hospital as the top destination for rehabilitation services in the UAE and GCC.

Dar Al Shifa Hospital

United Arab Emirates

Client

Dar Al Shifa Hospital LLC

Key data

Beds: 100
Gross Floor Area: 32,000 m²

Implementation: 2017

The Project

Turn-key implementation.

Ras Al Kahima Rashid Abdullah Hospital

United Arab Emirates

Client

China State Contraction Company LLC

Key data

Beds: 68
Gross Floor Area: 15,400 m²

Implementation: 2014

The Project

Supply and installation of medical equipment.

Al Ahli Hospital Doha

Qatar

Client

Al Ahli Hospital Corporation Q.S.C./ Contraco W.W.L., Qatar

Key data

Beds: 200
Gross Floor Area: –

Completion: 2006

The Project

Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works, Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture, warranty for 1 year.

Doha Al Ahli Hospital

Qatar

Client

Al Ahli Hospital

Key data

Beds: 200
Gross Floor Area: – m²

Implementation: 2004

The Project

Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works. Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture. warranty for 1 year.

Hufuf Al Ahsa Hospital

Saudi Arabia

Client

Al Ahsa Medical Ltd.

Key data

Beds: 300
Gross Floor Area: – m²

Implementation: 2003

The Project

Project Management, Design, engineering, supply and installation of medical equipment, Training of personnel, maintenance for 1 year.

6 Hospitals

Syria

Client

Key data

Beds: 140
Gross Floor Area: –

Implementation: 1995

The Project

Engineering, installation and supply of medical equipment, testing and commissioning. training of personnel, 3 years maintenance.

Tripoli University Hospital

Lebanon

Client

Ministry of Health

Key data

Beds: 1400
Gross Floor Area: –

Completion: 1992

The Project

Medical equipment and maintenance. Planning, supply and installation of medical equipment, maintenance, staff training, implementation of quality assurance programs, IT-supported maintenance and information systems.

Rehabilitation Center Yerevan

Armenia

Client

International Federation of Red Cross and Red Crescent Societies.

Key data

Beds: 120
Gross Floor Area: –

Implementation: 1992

The Project

Design and supply of complete medical equipment, including training of personnel. provision of management program, planning, and management assistance during the start-up period.

Muscat Private Hospital Bausher

Oman

Client

Oman Medical Projects Company (SAOG)

Key data

Beds: 120
Gross Floor Area: –

Implementation: 1990

The Project

Turn-key implementation.

8 Hospitals Iraq

Iraq

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: –

Implementation: 1986

The Project

Medical engineering, supply of the complete medical equipment and furniture, installation and commissioning plus the training of the personnel and maintenance for 5 years. The project involved six 260 bed maternity/child hospitals, and one 400 bed central child hospital and one 200 bed rehabilitation center.

Al Ain Hospital

United Arab Emirates

Client

Arabtec San Jose JV

Key data

Beds: 425
Gross Floor Area: –

Implementation: –

The Project

Total operation, modernisation of OT & ICU departments.

Nork Marash Medical Centre

Armenia

Client

Nork Marash Medical Centre

Key data

Beds: 75
Gross Floor Area: –

Implementation: 2018

The Project

Supply and installation of medical equipment.

Moscow Medsi CDC

Russia

Client

Moscow Medsi CDC

Key data

Beds: 20
Gross Floor Area: 22,800 m²

Implementation: 2015

The Project

Supply and installation of medical equipment.

MCS Intermed Hospital

Mongolia

Client

MCS Intermed Hospital

Key data

Beds: 91
Gross Floor Area: 13.000 m2

Implementation: 2014

The Project

Hospital planning, supply & Installation of medical equipment.

St. Petersburg AVA Peter Nord

Russia

Client

AVA Peter Nord

Key data

Beds: 120
Gross Floor Area: – m²

Implementation: 2014

The Project

Supply and installation of medical equipment.

Sochi Hospital Nº4

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 300
Gross Floor Area: 44,500 m²

Implementation: 2013

The Project

Turnkey hospital realized to provide medical services especially for the Olympic Winter Games 2014.

Regional Hospital No 1 Ochapovski, Krasnodar

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 1200
Gross Floor Area: 71,000 m²

Implementation: 2012

The Project

Turn-key implementation.

Health Improvement Project

Ukraine

Client

Ukrmedpstatsch

Key data

Beds: –
Gross Floor Area: –

Implementation: 2010

The Project

Supply and installation of medical equipment.

Hawari Hospital, Benghazi

Libya

Client

PWA (Public Works Authorities)

Key data

Beds: 520
Gross Floor Area: –

Implementation: 2008

The Project

Upgrade of the civil, mechanical, and electrical installations of the existing hospital. Training of personnel and warranty for 1 year.

Krasnodar Cardio Center

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 305
Gross Floor Area: 31,700 m²

Implementation: 2002

The Project

Turn-key implementation.

Al Essra Hospital

Jordan

Client

Al Essra Committee.

Key data

Beds: 100
Gross Floor Area: –

Implementation: 2001

The Project

Supply, installation and commissioning of medical equipment, training of hospital personnel.

Erzincan World Bank Project

Turkey

Client

World Bank.

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1996

The Project

Design, engineering and supervision of 3 hospitals.

3 Hospitals - Turkey

Turkey

Client

Ministry of Health

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1990

The Project

Supply and instalation of medical equipment for hospitals in Milas, Polatli and Susheri.

Bundeswehrkrankenhaus Ulm

Germany

Client

Bundesamt f. Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw)

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: Engineering 2022 – 2023 / Supply 03/2024 – 04/2025

The Project

The German Armed Forces Hospital Ulm (BWK), the largest military hospital in southern Germany, serves both military and civilian patients and is affiliated with the University Hospital of Ulm. Since 2009, Hospitalia international gmbh has delivered multiple projects at BWK, including upgrades to Emergency, OR, Endoscopy, Pathology, and ICU areas. In 2023, Hospitalia won the tender to renew equipment in the Pathology Lab and Pharmacy. The scope included planning, supply, installation, staff training, and commissioning of analytical systems, safety cabinets, and GMP-compliant isolators. Tasks followed strict quality protocols, including mockups, FAT, IQ, and OQ, ensuring full integration and compliance.

ZLR – Zentrum für Luft- u. Raumfahrtmedizin

Germany

Client

Bundesamt f. Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw)

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: Design 2021 / Supply of Equipment 2022 – 2023

The Project

The ZLR, Germany’s Air Force Center for Aerospace Medicine, specializes in military aviation medicine—from personnel assessment to long-term support. It also conducts forensic and chemical investigations of flight accidents, including histopathology labs with a scanning electron microscope for material analysis. In 2022, the new ZLR building in Cologne Wahn was completed, housing 11 functional and diagnostic departments. Hospitalia international gmbh, as the successful bidder, managed the integration of relocated and new medical equipment. Scope included planning, supply, installation, staff training, and coordination of warranty services—ensuring full operational readiness of the advanced facility.

Bundeswehr Hospitals

Germany

Client

Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr” Ministry of Defense on behalf of Federal Republic of Germany
 

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: 2024-2030

The Project

On behalf of the German Ministry of Defense, the Federal Office for Bundeswehr Equipment (BAAINBw) is overseeing a major medical equipment project, currently in the planning phase. The first delivery is expected in Q4 2026, with construction on schedule. The project includes planning, delivery, installation, and integration of medical equipment, along with training, a full service and IT concept, and an operating theatre information system with warranty. Key suppliers include Siemens, Philips, Dräger, and Olympus. Orders placed for Koblenz and Hamburg (2024–2027), with potential framework call-offs extending to 2033. The project is fully financed by the federal budget.

Kalamata General Hospital

Greece

Client

Key data

Beds: 280
Gross Floor Area: –

Implementation: 2000

The Project

Turn-key implementation. Construction, Medical equipment design and supply, installation, testing and commissioning; training of the hospital personnel, warranty for 2 years.

Cardiac Center Minsk

Belarus

Client

Department of Health of Minsk

Key data

Beds: –
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical and electro-mechanical equipment for the Cardiac Center of the 4th Minsk Clinic.
Training of personnel and 1 year guarantee.

Bratislava Radiotherapy Center

Slovakia

Client

National Oncological Institute Bratislava.

Key data

Beds: 30
Gross Floor Area: –

Implementation: 1996

The Project

Supply of medical equipment. General contractor and responsible for the complete design, construction, electro-mechanical systems and medical equipment supply.

Scroll to Top