NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

NEWS:

WWH and Vamed joined forces.

The international project business of Vamed Engineering was sold by Fresenius SE & Co KGAA to the WWH Group with effect from April 1, 2025.

VAMED – a strong partner

VAMED provides services for hospitals and other healthcare facilities. The company, headquartered in Vienna, Austria, was founded in 1982. Since 1984, VAMED Engineering has been active in the areas of real estate development, facility and hospital management.

To date, the company has completed around 1,000 projects in more than 98 countries.

PROJECTS

1,000 projects

96 countries

over the last
40 years

Our International Footprint

Turnkey Solutions

Cacuaco General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 27,000 m²

Implementation: 26.07.2024

The Project

The Cacuaco General Hospital, located in Luanda, is being developed by VAMED on a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, including the imaging, as well as all construction works and installation. Commissioning, training and two-year management assistance is also part of the contract.

Viana General Hospital

Angola

Client

Ministry of Health

Key data

Beds: 322
Gross Floor Area: 25,000 m²

Implementation: 23.04.2024

The Project

The Viana General Hospital, located in Luanda, Angola is being developed by VAMED in a turn-key basis. The scope for this project includes the complete design, the development of the entire medical equipment and engineering, as well as all construction works and installation.

This new hospital is located on a land of around 25,000 m2, and consists of a 3-storey main building and 5 smaller satellite buildings that function autonomously (the Maintenance Building, the Morgue Building, the Laundry Building, the Cafeteria Building and the Technical Building), essentially made up of ground floor and roof structures. In terms of services, it has five operating theatres, eight inpatient wards, a centralised diagnostic centre, an emergency service, obstetrics and gynaecology, paediatrics, orthopaedics and general medicine.

Military Regional Hospital of Cabinda, Angola

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 102
Gross Floor Area: 11,450 m²

Implementation: 2022 – 2026

The Project

The Cabinda Regional Military Hospital is a state-of-the-art facility developed under a turn-key contract including design, construction, equipment, training, and 4 years of support. Located in the strategic enclave of Cabinda, Angola, it addresses the specific health needs of an isolated province by reducing the need for long-distance patient transfers. The hospital spans 11,450 m² and features 102 beds, emergency services, internal medicine, obstetrics, and rehabilitation. It includes an integrated diagnostic hub with CT, digital X-ray, ultrasound, and advanced labs for fast, coordinated care. Training and co-management strategies ensure sustained performance and safety. Together with the new General Hospital, it significantly enhances Cabinda’s healthcare infrastructure.

Buzi District Hospital

Mozambique

Client

Ministry of Health

Key data

Beds: 54
Gross Floor Area: 1,800 m²

Implementation: 2024 – On Going

The Project

Turn-key Realization: Design, Planning, Engineering, Construction 2.750 sqm (1,800 sqm belong to this project), Supply of Equipment, Installation, Testing, Commissioning, Training.

Sussundenga District Hospital

Mozambique

Client

Ministry of Health

Key data

Beds: 21
Gross Floor Area: 950 m²

Implementation: 2024 – On Going

The Project

Turn-key Realization: Design, Planning, Engineering, Construction 2.750 sqm (950 sqm belong to this project), Supply of Equipment, Installation, Testing, Commissioning, Training.

Urology and Nephrology Centre of Excellence - Korle Bu Teaching Hospital

Ghana

Client

Ministery of Health.  End User: Korle Bu Teaching Hospital

Key data

Beds: 101 + 30 Dialysis Stations
Gross Floor Area: 7,800 m²

Implementation: 07.2021 – 12.2023

The Project

The Urology and Nephrology Centre of Excellence at Korle Bu Teaching Hospital spans 7,800 m² across three blocks and delivers advanced inpatient and outpatient care. It features 101 beds, 4 ICU beds, and 3 operating theatres—two major ones next to the CSSD for efficient logistics, and a minor one in the outpatient area. The facility includes 30 Hemodialysis stations with separate access and a cutting-edge imaging unit with CT, fluoroscopy, ultrasound, and lithotripter. A 100-seat teaching room supports clinical training. Completed in 30 months and handed over in December 2023, it includes further staff training and technical management by VAMED through 2026. This centre meets critical urology and nephrology needs in an underserved region with top-tier care.

Military Regional Hospital of Huambo

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 201
Gross Floor Area: 17,300 m²

Implementation: 2022 – 2026

The Project

The Regional Military Hospital of Huambo, developed under a turn-key contract, includes concept, design, construction, equipment, training, and 4 years of management support. Spanning 17,300 m², it serves both military and civilian needs, and is a benchmark for advanced care in central Angola. Its integrated diagnostic hub houses MRI, multi-slice CT, digital X-ray with fluoroscopy, and high-definition ultrasound, enabling rapid, precise diagnostics. With 201 beds, the hospital offers specialized services in emergency, obstetrics, dialysis, rehab, and surgery. It addresses historic gaps in local healthcare, reducing reliance on distant facilities. Together with a new Maternity Hospital and extensive training programs, it forms a resilient medical network that elevates care in the region.

Military Regional Hospital of Luena

Angola

Client

Ministry of National Defense, Former Combatants and Veterans of the Homeland of Angola

Key data

Beds: 102
Gross Floor Area: 11,450 m²

Implementation: 2022 – 2026

The Project

The Luena Regional Military Hospital, under a turn-key contract including design, construction, equipment, training, and 4 years of support, is set to open in 2026. Built on 11,450 m², it addresses the healthcare needs of Angola’s eastern region. It features an advanced diagnostic hub with CT, digital X-ray with fluoroscopy, high-resolution ultrasound, and in-house lab services, enabling accurate, rapid diagnoses. With 102 beds, the hospital includes emergency and specialized wards to provide timely care. Located in remote Moxico province, it minimizes long-distance travel for treatment. Training programs and co-management strategies ensure sustainable performance. This facility marks a major step forward in healthcare access for Angola’s eastern frontier.

Angondje University Hospital & Cancer Institute Libreville

Gabon

Client

Ministry of Health

Key data

Beds: 168
Gross Floor Area: 13,500 m²

Implementation: 2012

The Project

Planning & Construction of the University Hospital Angondje and Nuclear Therapy Libreville.

Hôpital d'Instruction des Armees Omar Bongo Ondimba (HIAOBO)

Gabon

Client

Ministry of Defense

Key data

Beds: 130
Gross Floor Area: 14,400 m²

Implementation: 2005

The Project

Turn-key Implementation, total operation. Design, engineering, construction, equipping, installation, testing and commisioning, extensions ongoing.

2 new General Hospitals and 1 Regional Hospital

Ivory Coast

Client

Ministry of Health

Key data

Beds: 200 (each hospital)
Gross Floor Area: N/A m²

Implementation: 2024

The Project

VAMED France, in consortium with EIFFAGE and EGIS, is developing four 200-bed Regional Hospitals in Guinea. Phase 1 includes Kindia and Labé; optional Phase 2 covers Kankan and N’zerekore. VAMED France is responsible for medical equipment—engineering, procurement, delivery, installation, commissioning, and a one-year warranty. Site preparation has begun in Kindia, with formal commencement expected in March 2024. Beyond supplying MEQ, VAMED was selected as the healthcare expert for the project, providing technical advisory support across the full value chain of these turnkey hospital developments.

4 Regional Hospitals

Guinea

Client

Ministry of Health

Key data

Beds: 100 – 110
Gross Floor Area: 10,000 – 12,000 m²

Implementation: 2023

The Project

With four hospitals delivered in 2022, VAMED France is now the leading healthcare operator in Côte d’Ivoire. A Memorandum of Understanding (MoU) has been signed for two new General Hospitals and one Regional Hospital, currently in the final decision phase. In 2023, VAMED HQ (Vienna), VAMED France (Paris), and VAMED Côte d’Ivoire (Abidjan) jointly advanced three new hospital projects under a “Protocole d’Accord” with the Ministry of Health. Each facility (100–110 beds, 10,000–12,000 m²) will include Emergency, Outpatient, Internal and Surgical Medicine, Pediatrics, Gynecology, a Metabolic Diseases Unit, MEQ (incl. CT), and Labs. Preliminary designs were validated in November 2023; final negotiations are underway.

Eleven 40-bed Hospitals in Ashanti, Eastern Region and Greater Accra Regions and one Polyclinic in Brong-Ahafo

Ghana

Client

Ministry of Health

Key data

Beds: 470 (40 for each Hospital and 30 for the Polyclinic)
Gross Floor Area: total sqm of 11 Hospitals + 1 Polyclinic: 26,200 m²

Implementation:
o Commencement: 27th September 2021
o Taking-over Certificate/Completion: Issued on 9th September 2024

The Project

The construction of twelve new hospitals supports the Sustainable Development Goal of achieving universal health coverage by improving access to essential healthcare services, medicines, and vaccines. The project aims to elevate medical service levels in selected regions, fostering healthier communities and boosting local economies through job creation. Each hospital will include buildings for clinics, wards, maternity care, staff, administration, kitchen, and technical support. Services will cover outpatient care, pharmacy, diagnostics, surgery, obstetrics, immunization, and health education. Locations: Kpone Katamanso, Jumapo, Kwabeng, Nkwantia, Adukrom, Achiase, Drobonso, Sabronum, Manso Nkwanta, Twedie, Mim, and Suame.

Maternity Upgrade – 20 Sites

Kenya

Client

Ministry of Health

Key data

Beds: 177 beds + 26 delivery beds
Gross Floor Area: 6,420 m2 total (across 20 facilities)

Implementation: 2023 – 2024

The Project

To reduce maternal and newborn mortality, Kenya’s Ministry of Health is modernizing 20 maternity and neonatal units across 12 counties, with support from VAMED. The project enhances access to skilled care for low-income families, minimizing travel and costs. VAMED is responsible for design, construction, refurbishment, equipment supply, and staff training, with 36 months of maintenance included. The facilities will receive 177 beds, 26 delivery beds, 7 operating theatres, and essential equipment like incubators, ventilators, and oxygen generators. Training covers hygiene, emergency care, and includes a four-week observership in Finland. This initiative strengthens rural healthcare and improves maternal and newborn outcomes.

5 District Hospitals + 1 Polyclinic

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 370
Gross Floor Area: 27,090 m²

Implementation: 2020

The Project

Construction of 5 district Hospitals in Ghana’s northern region in Sawla, Tolon and Buipe, Eastern Region in Somanya and Volta Region in Wheta as well as a polyclinic in Northern Region in Bamboi.

Ghana 20 Polyclinics

Ghana

Client

Ministry of Health, Ghana

Key data

Beds: 375
Gross Floor Area: 18,250 m²

Implementation: 2017

The Project

Turnkey construction of 15 polyclinics:
– 5 in the Northern Region (Janga, Karaga, Chereponi, Tatale, Kpandai).
– 5 in the Upper West Region (Babile, Hain, Ko, Lambussie, Wechiau).
– 5 in Brong-Afaho (Booma, Kwatire, Nkrankwanta, Techimantia, Wamfie).
– 5 in Greater Accra Province (Adentan, Ashiaman, Bortianor, Oduman, Sege).

University Hospital Jeanne Ebori

Gabon

Client

Ministry of Health

Key data

Beds: 176
Gross Floor Area: 17,500 m²

Implementation: 2016

The Project

Turn-key implementation of Mother & Child University Hospital.

Libreville University Clinics (CHL)

Gabon

Client

Ministry of Health

Key data

Beds: 276
Gross Floor Area: 28,000 m²

Implementation: 2016

The Project

Planning, construction and equipping of an emergency hospital, warranty for 1 year

Completion:
Phase 1 – 2014
Phase 2 – 2016

Regional Hopsital Fogo

Cabo Verde

Client

Ministry of Health

Key data

Beds: 40
Gross Floor Area: N/A m²

Implementation: 2016

The Project

Turn-Key extension to a regional hospital. Construction of Public building reinforced with concrete and specific materials related to the purpose of the building, including new construction and renovation of existing buildings.

Kabarnet Hospital

Kenya

Client

Government of Baringo

Key data

Beds: 100
Gross Floor Area: N/A m²

Implementation: 2016

The Project

Extension of the existing hospital by a surgical block, supply and installation of technical medical equipment and medical gas system.

Libreville Owendo University Hospital

Gabon

Client

Ministry of Health

Key data

Beds: 120
Gross Floor Area: 16,700 m²

Implementation: 2014

The Project

Turn-key implementation of a University Hospital.

Monapo Hospital

Mozambique

Client

Ministry of Health

Key data

Beds: 65
Gross Floor Area: N/A m²

Implementation: 2014 – 2016

The Project

The Regional Hospital Monapo in Nampula Province, Mozambique, is a general hospital focused on primary healthcare, with special services in maternal and child health. Located in a region with around 250,000 people, the hospital includes outpatient units (emergency, ENT, gynecology), diagnostics (lab for HIV, malaria, TBC), radiology, minor surgery and C-section operating rooms, delivery and sterilization areas, and wards for men, women, and children. Support facilities include a kitchen, laundry, pharmacy, medical storage, offices, and a waste recycling plant. The contract covers planning, turn-key construction, equipment, commissioning, staff training, and one year of maintenance.

Bamako Radiotherapy Center

Mali

Client

Ministry of Health

Key data

Beds: 190
Gross Floor Area: N/A m²

Implementation: 2012

The Project

Turn-key implementation of a radiotherapy centre.

Libreville Military Health Service Training School

Gabon

Client

Ministry of Defense

Key data

Beds: N/A
Gross Floor Area: 4,000 m²

Implementation: 2007 – 2009

The Project

Turn-key implementation of a training center. The École d’Application du Service de Santé Militaire de Libreville (EASSML) consists of 3 buildings including classrooms, a computer room with an Internet connection, trainees’ rooms, honor rooms, the multipurpose room, the foyer, the canteen, the administration and the sports infrastructure.

Lambarene, Makokou & Tchibanga Regional Hospitals

Gabon

Client

Ministry of Health

Key data

Beds: 80
Gross Floor Area: N/A m²

Implementation: 2008

The Project

Turn-key implementation and total operation.

Gushegu District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 86
Gross Floor Area: 5,724 m²

Implementation: 2007

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Begoro District Hospital

Ghana

Client

Ministry of Health

Key data

Beds: 60
Gross Floor Area: 5,000 m²

Implementation: 2003

The Project

Design, engineering, construction, supply of complete medical and non-medical equipment, installation, commissioning. Training of hospital personnel. 2 years maintenance.

Songinokhairkhan District Hospital

Mongolia

Client

Ministry of Health

Key data

Beds: 200
Gross Floor Area: 18,000 m²

Implementation: 2017 – 2021

The Project

The 200-bed District Hospital in Songinokhairkhan, Ulaanbaatar—the largest district in Mongolia—was built under the ADB-funded “Fourth Health Sector Development Program.” As a turn-key project, it replaced outdated infrastructure, ensuring first-class healthcare delivery and expanding access to specialized primary care. The hospital serves both local residents and referred patients from Bayangol District. VAMED’s scope included full construction and equipping, as well as support for human resource development. Commissioned during the COVID-19 pandemic, the facility is equipped to operate under emergency conditions, enhancing resilience and health service quality in the capital.

Friendship Hospital - Vientiane

Laos

Client

Ministry of Health

Key data

Beds: 150
Gross Floor Area: 24,000 m²

Implementation: 2015 – 2019

The Project

The Friendship Hospital in Vientiane is a leading public healthcare and the main university teaching and research facility in Laos. It specializes in treating orthopedic, neurological, and kidney-related conditions. Extension works were executed in two phases, covering the design, construction, and full equipping of new facilities with medical and non-medical items. VAMED’s scope included comprehensive training programs—both locally and in Europe—and ongoing technical maintenance by VAMED specialists, ensuring sustainable operation and enhanced care quality in one of the country’s most important hospitals.

Kimbe Provincial Hospital

Papua New Guinea

Client

Ministry of Health

Key data

Beds: 200
Gross Floor Area: 12,190 m²

Implementation: 2025 – 2027

The Project

Kimbe, a major port and fast-growing city in Papua New Guinea, is set to receive a new 200-bed Level 5 Provincial Hospital. Aligned with PNG’s National Health Services Standards, the facility will enhance healthcare access in West New Britain Province. VAMED, as main contractor, is responsible for delivering a turn-key solution that includes design, construction, installation of medical and mechanical equipment, and comprehensive user and technical training. Key service upgrades include diagnostic and outpatient care, patient treatment, operating theatres, ICU, radiology, and support services—boosting value, efficiency, and care quality for the region.

Army Hospital of Gatot Subroto

Indonesia

Client

Ministry of Defence

Key data

Beds: N/A
Gross Floor Area: 9,500 m²

Implementation:
Phase1: 2018 – 2022
Phase2: 2022 – 2026

The Project

The Center for Nuclear Medicine and Radiation Therapy at RSPAD Gatot Subroto is set to become a leading oncology hospital in ASEAN, with Indonesia’s first proton therapy system. Developed by VAMED, this turn-key project includes design, construction, equipment installation, and advanced training. Phase 1 upgraded MRI (3 units), DSA (5 units), and CT (2 units) centers. Phase 2 adds a state-of-the-art Proton Therapy and Radiotherapy Center, with Linear Accelerators, Cyclotron, Brachytherapy, PET CT, SPECT, and radiopharmaceutical production. This Austrian-Indonesian collaboration brings cutting-edge cancer care to the region, improving diagnosis, treatment, and follow-up for local patients.

National Cancer Center (NCC) Phase II

Mongolia

Client

Ministry of Health

Key data

Beds: 275
Gross Floor Area: approx. 1500 m² for the new Radiosurgery Department.

 

Implementation: 2022 – 2024

The Project

Mongolia’s National Cancer Center (NCC), founded in 1961, is the country’s sole state institution for cancer prevention, diagnosis, treatment, and research. This Austrian-funded project enhanced NCC’s services by upgrading outdated radiation therapy equipment and establishing a stereotactic radiosurgery center. It included construction of a bunker, installation, commissioning, warranty services, and domestic and international training. The bill of quantity focused on neurosurgery and radiotherapy. With advanced technology and expanded capacity, the NCC can now treat two previously incurable cancers in Mongolia, significantly improving survival rates, especially for underserved populations.

Northern Province Hospitals

Sri Lanka

Client

Ministry of Health, Nutrition & Indigenous Medicine

Key data

Beds: 525 (Total beds for 4 location)
Gross Floor Area: 19,308 m² NET (Total area for 4 location)

Implementation: 2021 – 2024

The Project

To address post-war health challenges in Sri Lanka’s Northern Province, the government prioritized restoring healthcare infrastructure through its 2015–2025 National Master Plan. Funded by a Dutch soft-loan, this turn-key project enhances healthcare equity, quality, and access across four hospitals: Point Pedro, Kilinochchi, Mankulam, and Vavuniya. The facilities include a maternal and women’s health center with the province’s first mammography unit, a rehabilitation and mental health center, and cardiology, nephrology, accident, and emergency units. This initiative marks a major step toward rebuilding and modernizing care in a region long affected by conflict and chronic health issues.

Boram Provincial Hospital

Papua New Guinea

Client

Ministry of Health

Key data

Beds: 360
Gross Floor Area: 5,120 m²

Implementation: 2018-2022

The Project

Boram General Hospital in Wewak, East Sepik Province, serves a catchment area of 500,000 people across multiple provinces in Papua New Guinea. Currently a Level 4 District Hospital, it is being upgraded to a Level 5 Provincial Hospital to offer advanced clinical services. VAMED, as main contractor, was tasked with raising the hospital’s service quality and cost-effectiveness. The turn-key project includes design, construction, installation of medical and mechanical equipment, and advanced training and maintenance. Key upgrades focus on diagnostic, outpatient, and patient treatment services, enhancing care delivery across the region.

Dazhou Hospital Feasibility Conceptual Design

China

Client

China International Trust and Investment Corporation (CITIC)

Key data

Beds: 2100
Gross Floor Area: 20,000 m²

Implementation: 2019

The Project

Sichuan Province, located in southwest China, spans the Sichuan Basin and the Tibetan Plateau. Dazhou, in the province’s northeast, borders Shanxi and Chongqing and features mountainous terrain surrounded by hills and forests. The designated land for development is expected to be leveled by the government or developer. CITIC has awarded VAMED Engineering the Feasibility Study, Masterplan Design, and Preliminary Architectural Concept for a planned project in the region—marking the initial phase of a potential healthcare infrastructure development in this strategically located area.

Hospital 106 Pakse

Laos

Client

General Logistics Department of the Ministry of National Defence of the Lao PDR

Key data

Beds: N/A
Gross Floor Area: 3,500 m²

Implementation: 2016 – 2019

The Project

The public Hospital 106 Pakse is located in Bachieng district of Pakse city in Laos.
 
The project aims to provide the best health care for the urban population of Pakse and the region of Champasak, as well as coping with the increasing demand of health services in Laos, by integrating cutting-edge technologies, modernization and extension of the existing Hospital 106 Pakse.
 
VAMED’s scope included the supply of the equipment and mechanical, electrical and building material; as well as the planning, engineering and construction management, the
total site development and building construction including warranty, maintenance and the human resource development of this project.
 

Goroka Regional Hospital

Papua New Guinea

Client

Ministry of Health

Key data

Beds: 300
Gross Floor Area: 7,980 m²

Implementation: 2014 – 2018

The Project

 The location of the Hospital on the Eastern Highlands poses particular implementation challenges, as the nearest port is about 300 km away. Still, the modernization and exten-sion of the Goroka Provincial Hospital was successfully completed in 2018. With its newly constructed and modernized areas, the Hospital features around 300 patient beds, locat-ed in a remote region in the island’s interior about 1,600 meters above sea level. The project comprised the turn-key construction of a new central hospital building com-prising following departments: Accident and Emergency, Critical Care Unit, Outpatient Clinics, Radiology, Operating Theaters, Endoscopy, Intensive-Care Unit, Laboratory, Woman Healths & Birthing Suite and Central Sterilization Unit.

Radiotherapy Center
Friendship Hospital - Vientiane

Laos

Client

Ministry of Health

Key data

Beds: N/A
Gross Floor Area: 1700 m² (net)

Implementation: 2014 – 2017

The Project

The Friendship Hospital in Vientiane is one of Laos’ leading public healthcare and teaching facilities. As part of the national hospital upgrade program, VAMED delivered the country’s first MRI and implemented the first radiotherapy department during Phase 1. The project included a turnkey radiotherapy building, equipment supply, and extensive training and start-up support. The hospital specializes in orthopaedics, neurology, and kidney disease treatment, and serves as Laos’ primary university teaching and research hospital—marking a significant advancement in the nation’s medical capabilities.

Banda Aceh - Meuraxa Hospital

Indonesia

Client

Hilfswerk International

Key data

Beds: 366
Gross Floor Area: 5,600 m²

Implementation: 2007

The Project

Turn-key implementation of a general & children hospital

RSAL Dr. R. Oetoko Sorong

Indonesia

Client

Ministry of Defence

Key data

Beds: 4 ICU beds in the new Surgical Building
Gross Floor Area: 2 storey building, 1.400 m² Net

Implementation: 2020 – 2025

The Project

The “Upgrading Medical Equipment & Supporting Facilities for Navy Hospital Dr. R. Oetojo, Sorong” project involved the construction and MEP works for a new standalone two-storey department. VAMED Engineering delivered, installed, and commissioned all medical and non-medical equipment, including furnishings. The facility features a Radiology unit with CT and digital X-ray, two operating theatres, ICU, CSSD, laundry, lab, pharmacy, and renovated dental and ENT rooms. The scope included planning, training, and commissioning, with advanced hands-on CT training at a specialized center—enhancing clinical capabilities at RSAL Dr. R. Oetojo.

Dr. Wahyu Slamet Bitung

Indonesia

Client

Dr. Wahyu Slamet Hospital and Ministry of Defense

Key data

Beds: 100
Gross Floor Area: N/A m²

Implementation: 2018 – 2020

The Project

The Dr. Wahyu Slamet Hospital confirmed its commitment to the continues provision of a range of healthcare services in Bitung, Sulawesi Utara, Indonesia. As the Ministry of Defense of the Republic of Indonesia was adapting a referral system for Hospitals in Bitung, the plan was to equip and upgrade the Dr. Wahyu Slamet Hospitalto strengthen its health service delivery capability as atertiary referral Hospital in Sulawesi Utara. In many cases the existing medical equipment and devices of the Dr. Wahyu Slamet Hospital were strongly outdated and considered as obsolete. Within this project VAMED Engineering GmbH represents a unique project, with its very first delivery and installation of a hyperbaric medical treatment system. The project has been funded by a concessional Loan from Austria.
 

Cancer Prevention and Early Detection Network (CPEDU)

Mongolia

Client

Ministry of Health

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: Ongoing (2024 – 2025)

The Project

This project aims to create a nationwide cancer detection network in Mongolia, with a Center of Excellence in Ulaanbaatar and satellite hospitals in rural areas. It strengthens diagnostics at all sites and uses custom cancer detection and registration software to track outcomes. The project includes IT systems, medical equipment for the center, and screening tools for satellite centers. Most funding goes to high-tech diagnostics at the main center, building on prior support, including a LINAC for tumor treatment. The system enables early cancer identification, efficient patient referrals, and better information sharing across facilities to reduce long-term health impacts.

Hospital de Sangre Grande

Trinidad and Tobago

Client

Corporación de Desarrollo Urbano de Trinidad and Tobago (UDECOTT)

Key data

Beds: 106
Gross Floor Area: 18.000 m²

Implementation: 2020 – 2024

The Project

The New Sangre Grande Hospital is a flagship healthcare project in eastern Trinidad, part of a national initiative to modernize public health services. It marks VAMED’s third hospital project in Trinidad and Tobago, following Point Fortin and San Fernando Teaching Hospitals. Delivered as a full turn-key project, VAMED was responsible for planning, design, construction, equipment supply, commissioning, staff training, and maintenance. The hospital includes outpatient care, diagnostics, lab, pharmacy, imaging (CT, MRI, fluoroscopy), central sterile services, and surgery with 4 operating theatres (including one for endoscopy), as well as rehabilitation services—offering comprehensive, modern care.
 

General Hospital Villa Tunari

Bolivia

Client

AISEM

Key data

Beds: 200
Gross Floor Area: 21.000 m²

Implementation: 2018 – 2022

The Project

As part of Bolivia’s national healthcare modernization masterplan, the tertiary hospital in Villa Tunari, Cochabamba Province, is designed to deliver state-of-the-art diagnostics, treatment, and hospitalization. The hospital also serves as a training site for medical students under the guidance of expert clinicians. Key service areas include obstetrics, dialysis, cancer chemotherapy, and trauma care, including ICU services for road accident victims. Additional functions encompass emergency and outpatient services, diagnostics, imaging, laboratory and pharmacy, surgery with ICU, day clinic, rehabilitation, therapies, and mortuary and pathology services—ensuring comprehensive regional care.

Guyana Paediatric and Maternal Hospital

Guyana

Client

Ministry of Health

Key data

Beds: 256
Gross Floor Area: 24,000 m²

Implementation: On Going

The Project

The Guyana Pediatric and Maternal Hospital (GPMH) is a landmark project under an MoU between the Governments of Austria and Guyana, part of a wider effort to modernize Guyana’s public healthcare. Addressing historic gaps in funding and access to specialized care, GPMH serves both Georgetown and remote hinterland communities. This state-of-the-art facility provides comprehensive services across specialized departments, including Accident & Emergency, Outpatients, Surgery, ICU, Obstetrics, Imaging, Radiology, Endoscopy, Dialysis, Chemotherapy, Lab Services, and a Mortuary. GPMH is a critical step toward equitable, high-quality care for women and children in Guyana.

New Amsterdam Hospital Campus

Guyana

Client

Ministry of Health

Key data

Beds: 230
Gross Floor Area: 24,000 m²

Implementation: On Going

The Project

The New Amsterdam Hospital Campus is a landmark project under an MoU between the Governments of Austria and Guyana, aiming to address major gaps in Guyana’s public healthcare system. Designed as a modern, sustainable facility, it offers emergency, inpatient, and outpatient care, surgical theatres, diagnostic and treatment areas, a pharmacy, labs, central sterilization, a mental health clinic, and a teaching facility. This campus decentralizes access to high-quality care, integrates clinical training, and promotes mental health support. As a catalyst for long-term transformation, it sets a model for regional hospital development and improved health equity in Guyana.

Hospital Nueva Segovia

Nicaragua

Client

Ministry of Health

Key data

Beds: 234
Gross Floor Area: 23,600 m²

Implementation: On Going

The Project

Located in Ocotal, Nueva Segovia, about 225 km from Managua, the new “Hospital Departmental de Nueva Segovia” replaces a 60-year-old facility. Awarded to VAMED in late 2018, the project includes construction, equipment delivery, installation, training, and maintenance. With approximately 230 beds, the hospital offers services in internal medicine, surgery, pediatrics, orthopedics, ophthalmology, and ENT. It features five operating theatres, adult and pediatric ICUs, and neonatology. Serving over 260,000 people, it sets new medical standards for northern Nicaragua and stands as a key reference project in the national healthcare system.

Point Fortin Hospital

Trinidad and Tobago

Client

UDECOTT

Key data

Beds: 100
Net Floor Area: 16,000 m²

Implementation: 2015 – 2020

The Project

This turn-key contract covers the planning, construction, furnishing, and full equipping of a new 3-storey general hospital in Trinidad & Tobago, including both medical and non-medical equipment. It also includes start-up services, staff training, and 3 years of maintenance. The hospital will specialize in burn treatment, addressing needs linked to the region’s major liquid gas industry. Additional departments include Emergency, Radiology, Surgery, Physiotherapy, Outpatient, and Psychiatry. The project aims to deliver a modern, fully integrated healthcare facility tailored to the specific needs of the local population.

Hospital Zonal Suroeste

Argentina

Client

Ministry of Health

Key data

Beds: 25
Gross Floor Area: 5,000 m²

Implementation: 2020

The Project

The Hospital del Suroeste is a flagship project by the Government of Córdoba aimed at modernizing and decentralizing the public health system. Located in Los Filtros, one of the city’s most densely populated and underserved neighborhoods, the hospital will serve over 250,000 residents in the southwest zone of Córdoba and nearby areas. This state-of-the-art facility is strategically positioned to improve healthcare access and reduce the burden on central hospitals like Hospital San Roque and Hospital Misericordia. It represents a major step toward delivering quality, equitable care to historically underserved communities.

Hospital Manolo Morales

Nicaragua

Client

Ministry of Health 

Key data

Beds: 240
Gross Floor Area: 1,148 m²

Implementation: 2018 – 2019

The Project

Turnkey hospital realized to provide medical services for the radiology and emergency departments. VAMED designed and constructed a new radiology and emergency department for the existing Hospital Manolo Morales, located in Managua, which was opened in July 2019.
 
The scope included the demolition of the existing radiology department, the construction of new departments, delivery of medical equipment, delivery of a generator and UPS, installation of equipment , training and preventive and corrective maintenance for 3 years.

Hospital Santiago II

Bolivia

Client

Caja Nacional de Salud (CNS) Bolivia

Key data

Beds: 220
Gross Floor Area: 27,000 m²

Implementation: 2018 – 2019

The Project

The Hospital Santiago II is a successful project execution of VAMED Engineering in terms of the highest altitude (over 4.100 meters). VAMED was responsible for the project management; the medical technical package (supply and installation), as well as the new Imaging Center Building. Furthermore, the IT equipment, training and a two-year guarantee and maintenance for medical equipment devices were part of the contract.

San Fernando General Hospital

Trinidad and Tobago

Client

UDECOTT

Key data

Beds: 216
Gross Floor Area: 30,300 m²

Implementation: 2012 – 2014

The Project

VAMED was commissioned to review the Client’s strategy to expand healthcare provision in San Fernando, leading to the redesign of an existing shopping mall and office complex. The scope included functional concept, engineering, project management, renovation, supply and installation of medical and electro-mechanical equipment, training, and maintenance. Pediatric and adult outpatient clinics, internal medicine, imaging, and laboratory departments were established across 8 inpatient floors. An adjacent office building was also converted into a healthcare facility, upgrading ventilation, lighting, and electrical systems to hospital standards. A complete reorganization of internal spaces was carried out. Additional departments included maternity, pediatrics, pharmacy, and a teaching facility.

Hospital San Francisco

Honduras

Client

Ministry of Health

Key data

Beds: 139
Gross Floor Area: 450 m²

Implementation: 2015 – 2017

The Project

The Hospital San Francisco was built in 1990, using already existing radiology equipment, dating back to 1980’s.
 
VAMED designed, constructed and equipped a new radiology department and delivered additional equipment for the critical care area of the hospital.
 
The scope comprised among others of the following equipment: CT (64 slices), X-ray, ultrasound, a mammography unit, anesthesia machines, ventilators, incubators and an UPS to secure uninterrupted power supply. This was a big improvement for the patients in this area, who had to travel to Tegucigalpa, for their examinations.

Hospital Bertha Calderon

Nicaragua

Client

Ministry of Health

Key data

Beds: 270
Gross Floor Area: 1,166 m²

Implementation: 2016 – 2017

The Project

VAMED built a new emergency department and modernized the imaging and maternity units at the Bertha Calderón Mother and Child Hospital in Managua, Nicaragua. This upgrade makes it the most modern facility of its kind in the country. The project marks a major step in providing proper healthcare services, especially for high-risk pregnancies, benefiting some of the most vulnerable populations. The improved hospital infrastructure meets a critical need for better healthcare in the capital. The successful implementation was celebrated as a major achievement for the citizens of Managua. The new departments were officially inaugurated by the chairwoman of the local women’s committee, in the presence of the Minister of Health.

Municipal Hospital St.Louis du Nord

Haiti

Client

Hilfswerk Austria

Key data

Beds: 20
Gross Floor Area: 755 m²

Implementation:
Phase1: 2010
Phase2: 2014

The Project

Following the 2010 earthquake in Haiti, VAMED and Hilfswerk Austria delivered a fully equipped community hospital in St. Louis-du-Nord within 7 months. Built using container construction, the facility includes an operating room, observation ward, outpatient clinic, pharmacy, water treatment, and electricity supply. As a pro-bono project for earthquake survivors, it addressed urgent needs in medical care and sanitation. The hospital quickly became a vital refuge and was recognized by the public health authority as one of the most important health facilities in the region.

Level 3 Hospital Trinidad

Bolivia

Client

AISEM (Agencia de Infraestructura en Salud y Equipamiento Médico)

Key data

Beds: 205
Gross Floor Area: 22,639 m²

Implementation: 2021

The Project

Turn-key implementation.

Santa Rosa de Copan
Hospital del Occidente

Honduras

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: 25,000 m² 

Implementation: 2012 – 2014

The Project

The project involves the turnkey implementation of a radiology department, including the supply and installation of medical equipment. It also covers staff training and maintenance services to ensure long-term functionality and high-quality diagnostic care.

Dar Al Shifa Hospital

United Arab Emirates

Client

Dar Al Shifa Hospital LLC

Key data

Beds: 100
Gross Floor Area: 32,000 m²

Implementation: 2017

The Project

Turn-key implementation.

Muscat Private Hospital Bausher

Oman

Client

Oman Medical Projects Company (SAOG)

Key data

Beds: 120
Gross Floor Area: –

Implementation: 1990

The Project

Turn-key implementation.

Sochi Hospital Nº4

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 300
Gross Floor Area: 44,500 m²

Implementation: 2013

The Project

Turnkey hospital realized to provide medical services especially for the Olympic Winter Games 2014.

Regional Hospital No 1 Ochapovski, Krasnodar

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 1200
Gross Floor Area: 71,000 m²

Implementation: 2012

The Project

Turn-key implementation.

Krasnodar Cardio Center

Russia

Client

Administration of Krasnodar Region

Key data

Beds: 305
Gross Floor Area: 31,700 m²

Implementation: 2002

The Project

Turn-key implementation.

Bundeswehr Hospitals

Germany

Client

Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr” Ministry of Defense on behalf of Federal Republic of Germany
 

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: 2024-2030

The Project

On behalf of the German Ministry of Defense, the Federal Office for Bundeswehr Equipment (BAAINBw) is overseeing a major medical equipment project, currently in the planning phase. The first delivery is expected in Q4 2026, with construction on schedule. The project includes planning, delivery, installation, and integration of medical equipment, along with training, a full service and IT concept, and an operating theatre information system with warranty. Key suppliers include Siemens, Philips, Dräger, and Olympus. Orders placed for Koblenz and Hamburg (2024–2027), with potential framework call-offs extending to 2033. The project is fully financed by the federal budget.

Bundeswehrkrankenhaus Ulm

Germany

Client

Bundesamt f. Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw)

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: Engineering 2022 – 2023 / Supply 03/2024 – 04/2025

The Project

The German Armed Forces Hospital Ulm (BWK), the largest military hospital in southern Germany, serves both military and civilian patients and is affiliated with the University Hospital of Ulm. Since 2009, Hospitalia international gmbh has delivered multiple projects at BWK, including upgrades to Emergency, OR, Endoscopy, Pathology, and ICU areas. In 2023, Hospitalia won the tender to renew equipment in the Pathology Lab and Pharmacy. The scope included planning, supply, installation, staff training, and commissioning of analytical systems, safety cabinets, and GMP-compliant isolators. Tasks followed strict quality protocols, including mockups, FAT, IQ, and OQ, ensuring full integration and compliance.

ZLR – Zentrum für Luft- u. Raumfahrtmedizin

Germany

Client

Bundesamt f. Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw)

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: Design 2021 / Supply of Equipment 2022 – 2023

The Project

The ZLR, Germany’s Air Force Center for Aerospace Medicine, specializes in military aviation medicine—from personnel assessment to long-term support. It also conducts forensic and chemical investigations of flight accidents, including histopathology labs with a scanning electron microscope for material analysis. In 2022, the new ZLR building in Cologne Wahn was completed, housing 11 functional and diagnostic departments. Hospitalia international gmbh, as the successful bidder, managed the integration of relocated and new medical equipment. Scope included planning, supply, installation, staff training, and coordination of warranty services—ensuring full operational readiness of the advanced facility.

Regional Hospital Neunkirchen

Austria

Client

Landeskliniken Holding of Lower Austria

Key data

Beds: 364
Gross Floor Area: 47,000 m²

Implementation: 2013 – 2015
Techn. Operation: 2008 – now

The Project

VAMED duties comprised of the construction of the new facility, removal of old existing buildings, designing and implementing the new infrastructure, supply, installation and commissioning of medical equipment and technical operation.
One strategic aim was to implement a green Hospital. The use of geothermal energy in combination with photovoltaics present an advanced energy concept for the future. 60% of the necessary heating capacity and 90% of the cooling is provided by geothermal energy. In combination with the production of electrical energy in the namount of 61,000 KWh/year, covering the lighting demand of the Hospital by 80%, about 91 tons of CO2 are being saved per year. The ROI of the environmental friendly investment is expected after 6 years.
 

Radiation Oncology Units

Austria

Client

KAV Vienna, Austria

Key data

– Hietzing Hospital: 1,074 beds
– SMZ Ost Hospital: 998 beds

Gross Floor Area: N/A m²

Implementation:
– Hietzing Hospital: 2016 – 2017
– SMZ Ost Hospital :2017 – 2019

The Project

Radiation therapy is a relatively new field, which hasdeveloped rapidly in recent years. Modern radiotherapy units (linear accelerators) and the integration of imaging technologies such as computer tomography (CT) and magnetic resonance imaging (MRI) have made significant contributions to improving the effectiveness of radiation therapy, while at the same time largely protecting neighboring organs and the surface of the skin.
 
In April 2016 VAMED was awarded with the contract for the radiation oncology units at the Hietzing Hospital and the SMZ Ost Hospital. The contract comprises of planning and construction work, but also technical and infrastructure management, including maintenance of the medical technology equipment, reinvestments and financing.
 
Six state-of-the-art linear accelerators, areas for tele-therapy and CT simulation, as well as a special room for brachytherapy, improve the standard of care for cancer patients in the eastern part of Austria.

Provincial Hospital Mistelbach-Gaenserndorf

Austria

Client

Landeskliniken Holding of Lower Austria

Key data

Beds: 211
Gross Floor Area: 77,000 m²

Implementation:
– New Building: 2010 – 2014
– Refurbishment: 2014 – 2018

The Project

The Provincial Hospital Mistelbach-Gaenserndorf is undergoing a general overhaul. In a new building about 27.000m² of additional space was made available for surgery, ICU, children department, gynecology and obstetrics. This building provides the functions of a day clinic, child psychiatry, primary care, dialysis and a palliative care unit.
 
All the works were carried out with the Hospital in full operation.

Klinikum Peterhof and Service Center

Austria

Client

Niederösterreichische Gebietskrankenkasse

Key data

Beds: 156
Gross Floor Area: 21,328 m²

Implementation: 2012 – 2015

The Project

The old rehabilitation facility for rheumatic diseases did not meet current requirements owed to its age and building structure. So, it was decided to build a new facility to meet hygienic standards and allow cost efficient working processes and best possible care for patients. Besides the Hospital, the new building also contains an integrated Service Center with dental ambulatory.
The investment includes:
• Extension of the bed ward from 97 to 156 beds.
• Construction of an integrated service center for outpatient medicalrehabilitation and dental ambulatory.
• 5 Therapy pools with total 430m² water surface.
• Training- and therapy rooms.
 

University Hospital Charité Mitte

Germany

Client

Charité Universitätsmedizin, Berlin

Key data

Beds: 550
Gross Floor Area: 60,000 m²

Implementation: 2014 – 2016

The Project

The 21-storey high building is through its size a well known visual urban landmark. The building, opened in 1982, hasbeen completely refurbished and received an energy efficient façade. After completing the entire refurbishment of the new ward block, it is one of the most modern clinics in Europe. Equipment and furniture of wards and bed- rooms (total 550 beds) comply with latest health care standards.
 
Furthermore, a new building of 5 floors and a central atrium housing intensive care unit, operation theatres and emergency center complete the investment.
 
Capacities of all Charité Hospital locations:
• 4 Campi comprising of 17 Charité Centres with about 100 clinics and institutes.
• 3,011 beds at 3 locations.
• 142,000 Hospitalisations & 663,000 outpatients/ year.
• 7,000 students.
 

University Hospitals Schleswig-Holstein

Germany

Client

UKSH Special Purpose Co.

Key data

Beds: 2356
Gross Floor Area: 307,000 m²

Implementation: 2015 – 2021
Operation: 2021 – 2044

The Project

The second largest university clinic in Schleswig-Holstein, Germany, supports research and teaching at the Christian-Albrechts University in Kiel and the University of Luebeck. The goal is to centralize previously decentralized facilities into one central clinic at each site. This consolidation improves interdisciplinary collaboration, optimizes patient care, and reduces medical process costs. In Kiel, the new central clinic will integrate existing and modern buildings in a comb-like structure. In Luebeck, the current clinic will be extended following the same efficient layout, with centralized expansions of intensive care and operating theatres to shorten distances and improve workflows.

University Hospital Banja Luka

Bosnia

Client

Ministry of Health

Key data

Beds: 680
Gross Floor Area: 58,400 m²

Implementation: 2015 – 2018

The Project

The University Hospital clinic center Banja Luka is the most important medical service provider in the Republika Srpska. Whilst before upgrade major medical departments were located outside of the University Hospital, all medical departments shall be concentrated in the University Hospital clinical center of Banja Luka in the finished project.
One of project’s major challenge is to ensure continuous Hospital operation during the entire construction period. In the first step, the existing main building was modernized, thereafter a new 3-storey North Wing was constructed.
The features of the new University Hospital comprise of:
• 48 ICU and IMCU.
• Central OT unit with 12 OT’s, of which 10 OT-rooms.
are built in modular construction method.
• Emergency unit.
• Diagnostic departments.
• Pathology.
• Daycare unit.
• Dialysis.
 

General Hospital Bijeljina

Bosnia

Client

Ministry of Health and Social Welfare

Key data

Beds: 680
Gross Floor Area: 12,467 m²

Implementation: 2009 – 2013

The Project

The extension of the existing “Sveti Vračevi” General Hospital was delivered as a turnkey project, including design, construction, and furnishing. Located south of the existing complex, the new facility is structured in two main parts over four levels (P+3). The investment included 8 wards with 28 beds each, ICU (6 beds), neonatology (4 beds), a day clinic (8 beds), and recovery (4 beds). Surgical capacity features 5 operating theatres: 3 general, 1 C-section, and 1 emergency. Additional departments include radiology (CT, X-ray, fluoroscopy), laboratory, endoscopy, pathology, emergency block, central sterilization, kitchen, laundry, and administration.

Regional Hospital Voecklabruck

Austria

Client

Gesundheits- & Spitals-AG Upper-Austria

Key data

Beds: 573
Gross Floor Area: 86,504 m²

Implementation:
Design 1998 – 2000
Basic Project 2000 – 2004
Extension 2004 – 2008

The Project

The new supra-regional Hospital Voecklabruck, completed in 2004, includes 11 wards, an IT competence center, education center, parking garage, and a Red Cross station. The facility is designed to handle 180,000 medical examinations, 8,600 surgeries (including acute and day clinic cases), and around 25,000 hospitalizations annually. As part of the expansion, a new radiotherapy center was constructed, featuring two linear accelerators and nuclear medicine, along with a dedicated palliative care department. These upgrades were supported by additional infrastructure, including the new IT center and parking garage, enhancing both medical and operational capacity.

University Hospital Cologne

Germany

Client

Medfacilities GmbH, Cologne

Key data

Beds: N/A
Gross Floor Area: 18,357 m²

Implementation: 2010 – 2012

The Project

As part of the master plan, University Hospital Cologne centralized diagnostic and treatment areas to improve workflows, enhance patient and staff experience, and reduce operational costs. A new diagnosis and treatment center was added, directly connected to existing facilities beneath the bed wards. The new building includes six treatment storeys and two technical levels, along with an interdisciplinary medical intervention center and eight additional operating rooms. The hospital comprises 59 clinics and institutes, 1,400 beds, and handles approximately 58,000 hospitalizations and 237,000 outpatient visits annually—strengthening its role as a major healthcare provider in the region.

Vienna General Hospital - University Clinics Hospital

Austria

Client

City of Vienna & Republic of Austria

Key data

Beds: 366
Gross Floor Area: 31,000 m²

Implementation: 1982 – 1994
Operation: 1986 – now

The Project

The Vienna General Hospital – University Clinics Hospital combines patient care, teaching, and research, rooted in the legacy of the Vienna Medical School. It provides state-of-the-art treatment based on the latest medical knowledge while contributing to healthcare innovation and policy. The hospital integrates cutting-edge technology with compassionate care. It hosts 38 clinics and institutes, 400 outpatient departments, and 2,200 beds. Annually, it records around 78,700 hospitalizations, 1.2 million outpatient visits, over 51,600 surgeries, 772 transplants, and educates more than 4,000 students—making it one of Europe’s leading academic medical centers.

Kalamata General Hospital

Greece

Client

Key data

Beds: 280
Gross Floor Area: –

Implementation: 2000

The Project

Turn-key implementation. Construction, Medical equipment design and supply, installation, testing and commissioning; training of the hospital personnel, warranty for 2 years.

Cardiac Center Minsk

Belarus

Client

Department of Health of Minsk

Key data

Beds: –
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical and electro-mechanical equipment for the Cardiac Center of the 4th Minsk Clinic.
Training of personnel and 1 year guarantee.

Medical Equipment & Extensive Services

Telemedicine

Senegal

Client

Ministry of Health

Key data

Design / Equip / IT

Implementation: 2014

The Project

Radiology and infrastructure and IT for the University Hospital of Dakar and 3 Regional Hospitals in Thies, Diourbel and Louga IT connection of 4 Hospitals.

University Teaching Hospitals

Nigeria

Client

Ministry of Health

Key data

Manage / Equip / Train / Maintain

Beds: 7500
Gross Floor Area: 84,600 m²

Implementation: 2012

The Project

The project includes comprehensive project management, medical engineering services, and the supply of medical equipment. It also covers personnel training and ongoing support through maintenance, along with the provision of spare parts, consumables, and disposables to ensure uninterrupted operation and sustainability of the healthcare services.

Dr. Jamil and Dr. Sardjito Hospital

Indonesia

Client

Ministry of Health

Key data

Beds: 1390
Gross Floor Area: –

Implementation: 2002

The Project

Design and detailed engineering, installations and supply of medical equipment, project management, installation, testing and commissioning, training of hospital personnel, 2 years maintenance, 1 year Quality assurance programme for Dr. Jamil Hospital and Dr. Sardjito Hospital.

Dr. Midiyato Hospital

Indonesia

Client

Ministry of Defense, Indonesia

Key data

Beds: 120
Gross Floor Area: –

Implementation: 2016

The Project

Supply and installation of medical equipment, UPS, Elevators, Medgas supply, CSSD, water tanks.

Universiti Teknologi Mara (UiTM)

Malaysia

Client

TRIplc Resources (TRI) Sdn Bhd

Key data

Beds: 400
Gross Floor Area: – m²

Implementation: 2019 – 2021

The Project

The new Universiti Teknologi MARA (UiTM) Hospital in Puncak Alam, Selangor, Malaysia, is a 400-bed teaching and tertiary care hospital for undergraduate and postgraduate medical studies. Managed by the Ministry of Education, the campus includes academic facilities and accommodations. UiTM Hospital also serves as a general hospital for tertiary care referrals. VAMED’s scope included the supply, installation, and commissioning of medical and non-medical equipment, along with a 3-year comprehensive maintenance service. Despite COVID-19 challenges, the project was completed on schedule, supporting Malaysia’s medical education and healthcare infrastructure.

Beijing University International Hospital

China

Client

Beijing University International Hospital

Key data

Beds: 1900
Gross Floor Area: –

Implementation: 2017

The Project

Supply and installation of medical equipment.

Shijiazhuang No. 4 Hospital

China

Client

The Fourth Hospital of Shijiazhuang

Key data

Beds: 800
Gross Floor Area: Equipment Supply Only (no construction works 122.770 m² Net)

Implementation: 2019-2021

The Project

Located on Beisong Road in Chang’an District, Shijiazhuang, Hebei Province, this modern third-level maternity hospital was built between 2014 and 2019. It features advanced technology, functional design, and a welcoming environment. Specializing in gynecology, obstetrics, reproductive medicine, neonatology, and breast surgery, the facility integrates medical care, research, education, and health services. VAMED’s scope included the complete supply, transport, insurance, installation, testing, commissioning, and training for the medical equipment package—contributing to the hospital’s advanced capabilities and patient-centered care.

Center for Maternal & Child Health ll

Mongolia

Client

Ministry of Health

Key data

Beds: 665
Gross Floor Area: N/A m²

Implementation: 2019-2022

The Project

The National Center for Maternal & Child Health (NCMCH) is Mongolia’s sole referral center for complex obstetric, gynecological, neonatal, and pediatric cases from all 21 provinces. As a continuation of Phase 1, VAMED implemented Phase 2 to complete outstanding upgrades and fully utilize previous technological advancements. Despite the COVID-19 pandemic, the project improved tertiary healthcare for women and children in line with global standards. VAMED’s scope included renovating operating theatres, installing medical equipment and an MRI, and delivering on-site training at Austrian hospitals—ensuring sustainable use of equipment and long-term capacity building in maternal and child healthcare.

Chuzhou No. 2 People’s Hospital

China

Client

Chuzhou No. 2 People’s Hospital

Key data

Beds: 1000 (south campus), 1800 (whole campus)
Gross Floor Area: 120,000 m² NET

Implementation: 2020 – 2021

The Project

Located on Zuiwengxi Road in Chuzhou, Anhui Province, the south campus of this third-level General Hospital began operations in 2016. It specializes in cardiovascular care, neurosurgery, neurology, pediatrics, and radiotherapy, and includes ICU, NICU, and CCU units. The hospital integrates clinical care, teaching, research, rehabilitation, and emergency services. VAMED’s scope covered supply, transport, installation, testing, commissioning, training, warranty, and maintenance of a comprehensive medical equipment package. Key equipment includes a CT scanner, X-ray systems, lab automation lines, ultrasound, digital mammography, laparoscopic and dialysis systems, and monitoring devices.

RSAL Dr. R. Oetoko Sorong

Indonesia

Client

Ministry of Defence

Key data

Beds: 4 ICU beds in the new Surgical Building
Gross Floor Area: 2 storey building, 1.400 m² Net

Implementation: 2020 – 2025

The Project

The “Upgrading Medical Equipment & Supporting Facilities for Navy Hospital Dr. R. Oetojo, Sorong” project involved the construction and MEP works for a new standalone two-storey department. VAMED Engineering delivered, installed, and commissioned all medical and non-medical equipment, including furnishings. The facility features a Radiology unit with CT and digital X-ray, two operating theatres, ICU, CSSD, laundry, lab, pharmacy, and renovated dental and ENT rooms. The scope included planning, training, and commissioning, with advanced hands-on CT training at a specialized center—enhancing clinical capabilities at RSAL Dr. R. Oetojo.

Chuzhou No. 2 People’s Hospital

China

Client

Chuzhou No. 2 People’s Hospital

Key data

Beds: 1000 (south campus), 1800 (whole campus)
Gross Floor Area: 120,000 m² NET

Implementation: 2020 – 2021

The Project

Located on Zuiwengxi Road in Chuzhou, Anhui Province, the south campus of this third-level General Hospital began operations in 2016. It specializes in cardiovascular care, neurosurgery, neurology, pediatrics, and radiotherapy, and includes ICU, NICU, and CCU units. The hospital integrates clinical care, teaching, research, rehabilitation, and emergency services. VAMED’s scope covered supply, transport, installation, testing, commissioning, training, warranty, and maintenance of a comprehensive medical equipment package. Key equipment includes a CT scanner, X-ray systems, lab automation lines, ultrasound, digital mammography, laparoscopic and dialysis systems, and monitoring devices.

Lincang Municipal People’s Hospital

China

Client

Baoshan College of  Traditional Chinese Medicine  and Lincang Municipal  People`s Hospital

Key data

Beds Qinghua Campus: 1,200
Beds Whole Campus:     2,260

Gross Floor Area: 141,998 m²

Implementation: 2019 – 2021

The Project

The Lincang Municipal People’s Hospital is located in the Xihebei Road, Mangpan Street, Linxiang District, Lincang, Yunnan Province, PRC. The facility was constructed between 2012 and 2015 with advanced technology, functional facilities, comfortable environment and is specialized in general surgery, pediatric, urology and others disciplines.
 
It integrates minimally invasive treatment center, tumor treatment center, ophthalmic treatment center, trauma and emergency diagnosis and treatment center, health management center, medical rehabilitation treatment center and geriatric treatment center into a modernized third-level general Hospital in western Yunnan.
 
VAMED was responsible for the supply and installation of the medical equipment incl. transportation, testing and commissioning.
 

An Giang Hospital

Vietnam

Client

Project Management Unit of An Giang (PMU An Giang) on behalf of the Provincial Government of An Giang Province

Key data

Beds: 600
Gross Floor Area: N/A m²

Implementation: 2025-2026

The Project

Following its separation from An Giang Central Hospital, An Giang Obstetrics, Gynecology, and Pediatrics Hospital faced outdated equipment, leading to patient referrals to Ho Chi Minh City and reduced care quality for women and children. To address this, VAMED was selected under an Austrian soft loan scheme to modernize the hospital’s equipment, supporting the province’s socio-economic development plan. The project includes delivery and installation of 601 medical units across key departments, including Neonatology, Pediatrics, ICU, Imaging, IVF, and Surgery. Most equipment will be housed in a new nine-story Pediatric Building, enhancing care for vulnerable groups in the region.

PMU Phase 1 - 4

Vietnam

Client

Project Management Unit of An Giang (PMU An Giang) on behalf of the Provincial Government of An Giang Province.

Key data

Beds: 600
Gross Floor Area: N/A m²

Implementation: 2025 – 2026

The Project

The aim of the PMU 4 phase projects was to increase the capacity and to improve the quality and accessibility of specialized services, needed by patients suffering from life-style diseases such as cancer and cardiovascular diseases, in line with the master plan on development of Vietnam’s healthcare system.
 
The successful implementation of the Hospital program for the selected 19 referral public general Hospitals by VAMED uplifts Vietnam’s standard for greater and effective coverage in diagnostic and treatment, and significantly contributes toensure training requirements for Hospital response teams and enhance the “Brain power” of specialists, highly qualified doctors and skilled staff in the medical research arena.
 
All projects has been funded by the Government of Austria of a soft-loan, through the initiative of the Financial Bilateral.

Public Hospitals Ulaanbaatar

Mongolia

Client

Ministry of Health

Key data

Central Hospital No 1
Beds: 568
Net Floor Area: 24,560 m²
 
National Cancer Centre
Beds: 200
Net Floor Area: 20,000 m²
 
National Centre for Maternity & Children Health
Beds: 655
Net Floor Area: 54,260 m²

Implementation: 2014 – 2015

The Project

All three Hospital facilities are located in Ulaanbaatar and were upgraded through renovation and supply/ installation of new medical equipment.
Disciplines in the facilities include andrology, anesthesiology, cancer treatment, cardiology, dermatology, dialysis, ENT, imaging, maternity, neonatology, neurology, oncology, ophthalmology, pain relief, palliative care, pediatrics, proctology, pulmology, radiology, radiotherapy, rehabilitation, TCM and urology. VAMED provided the first 2 linacs for the country, some extensive training for doctors and technicians formed a part of the contract. The projects were supported by soft-loan funding from the Republic of Austria.

Hue Central Hospital

Vietnam

Client

Ministry of Health Vietnam

Key data

Beds: –
Gross Floor Area: –

Implementation: 2014

The Project

Planning, supply and installation of medical equipment

National Cancer Institute (NCI)

Malaysia

Client

JV Kiara Teratai / IJM Construction, Malaysia

Key data

Beds: 252
Gross Floor Area: 75,000 m²

Implementation: 2011 – 2013

The Project

The National Referral Centre for Cancer Treatment in Malaysia is the country’s most advanced cancer care facility. VAMED Engineering was responsible for the specification, supply, installation, commissioning, and training for high-end medical equipment across key departments: Radiology (CT, MRI, Angiography), Radiotherapy (Linear Accelerator, Tomotherapy, Brachytherapy, Radiosurgery), Nuclear Medicine (PET/CT), Surgical and ICU, and Laboratory (Histology, Hematology). These state-of-the-art facilities enable cutting-edge diagnostics and treatment, significantly advancing cancer care capabilities in Malaysia.

Sarawak International Medical Center

Malaysia

Client

Sarawak International Medical Center.

Key data

Beds: 200
Gross Floor Area: 60,000 m²

Implementation: 2010

The Project

Project Management, planning, supply and installation of medical equipment and hospital IT-system, Training of Hospital personnel, Maintenance for 2 years.

Prince Court Medical Center (PCMC)

Kuala Lumpur

Client

Petronas

Key data

Beds: 280
Gross Floor Area: 100,000 m²

Implementation: 2007

The Project

Planning and medical equipment supply, total operation

Sungai Buloh Teaching Hospital

Malaysia

Client

Tunas Selatan Sdn. Bhd.

Key data

Beds: 620
Gross Floor Area: –

Implementation: 2006

The Project

Supply and installation of medical equipment.

Cho Ray Hospital

Vietnam

Client

Ministry of Health

Key data

Beds: 3200
Gross Floor Area: N/A m²

Implementation: 2015-2020 (2 phases)

The Project

To meet national healthcare needs, key departments were upgraded in two phases with state-of-the-art equipment, including Operating Theatres with angiography, Radiotherapy, Sterilization and Infection Control, Imaging, Nuclear Medicine, and ICU. These upgrades enhance surgical specialties like cardiology and neurology, and improve cancer care from surgery to radiotherapy. A central element of the project was comprehensive training for technical, administrative, and medical staff to ensure optimal use and sustainability. VAMED provided the full scope of training and education programs to support long-term operational excellence.

Privatklinik Haikou - Hainan

China

Client

JVCO Hainan Unicare Hospital

Key data

Beds: 325
Gross Floor Area: 60,000 m²

Implementation: 2022

The Project

Planning, supply and installation of medical and IT equipment, operational management.

Medical Equipment Supply Packages
Project Summary 2010 - 2014

China

Client

China International Trust and Investment Corporation (CITIC) IMPORT and EXPORT CORP.

Key data

Implementation: 2010 – 2014

The Project

Vamed Engineering supplied in the period from 2010 – 2014 plenty of equipment pack-ages financed through Austrian loans, to existing and new build hospitals, consisting mainly of state of the art Radiology Equipment and other Cutting Edge Equipment. Com-mon Hospital equipment were sourced locally from China and not included in the Vamed Engineering Scope:
 
Beijing University International Hospital (2014, Beijing); Luoyang Central Hospital (2014, Luoyang); Hainan Unicare International Hospital (2013, Hainan); General Hospital (2013, Hohhot)
Dingyuan Hospital (2012, Dingyuan); Shijiazhuang No. 3 Hospital (2012, Shijiazhuang); Hexian People’s Hospital (2012, Hexian); Hunan People’s Hospital (2012, Hunan); Jiangxi Yingtan People’s Hospital (2012, Jiangxi Yingtan); Ningxia Autonomous People’s Hospital (2012, Ningxia); Quinghai Women & Child Hospital (2012, Quinghai); Xinjiang HIV 4 Hospital (2012, Xinjiang); Yingcheng Hospital (2012, Yingcheng); Hefei No. 2 Hospital (2012, Hefei); Ziyang No. 2 Hospital (2012, Ziyang); Ziyang People’s Hospital (2012, Ziyang); Xuancheng People’s Hospital (2011, Xuancheng); Chongqing Three Gorges College (2011, Chongqing); Xundian No. 1 People’s Hospital (2011, Xundian); Nanchang No. 2 Hospital (2011, Nanchang); Wuhu No. 1 People’s Hospital (2011, Wuhu); Wu’an County People’s Hospital (2010, Wu’an); Weixian Hospital (2010, Weixian); Qinyang People’s Hospital (2010, Qinyang).

Medical Equipment Supply Packages
Project Summary 1987 - 2009

China

Implementation: 1987 – 2009

The Project

Vamed Engineering supplied in the period from 1987 -2009 plenty of equipment packages financed through Austrian loans, to existing and new build hospitals, consisting mainly of state of the art Radiology Equipment and other Cutting Edge Equipment. Common Hospital equipment were sourced locally from China and not included in the Vamed Engineering Scope.

Wushan Hospital (2009, Wushan); Laibin City People’s Hospital (2008, Laibin); Dongsheng District People’s Hospital (2007, Erdos); Hohhot No. 4 Hospital (2007, Inner Mongolia); Chaocheng Hospital (2007, Chaocheng); Wuyi First People’s Hospital (2004, Hangzhou, Zhejiang Province); Liuan 3rd People’s Hospital (2003, Liuan, Anhui Province); Yangpu District Central Hospital (2002, Yangpu); Two Hospitals (2001, Yinkou); Jieshou Municipal People’s Hospital (2001, Jieshou, Anhui); Guizhou Province Health Bureau (2001, Guizhou); Boashan Sitang Hospital (1998, Shanghai); 45 Hospitals (1995, Various locations in China); First People’s Hospital (1989, Shanghai).

 

Medical Equipment Supply Packages
Project Summary 1986 - 2002

Malaysia

Implementation: 1986 – 2002

The Project

Vamed Engineering supplied in the period from 1986 -2002 plenty of equipment pack-ages partwise financed through Austrian or other international funds, to existing and new build hospitals, consisting mainly of imported state of the art Radiology Equipment and other Cutting Edge Equipment. The Common Hospital equipment were sourced locally.

Sarawak Specialist Hospital and Medical Center (2002, Sarawak); Sungai Buloh Hospital (2000, Kuala Lumpur); Putrajaya Hospital (2000, Kuala Lumpur); Nucleus Hospitals – Biomedical Services (1996, Kuala Lumpur); Nucleus Hospitals – Biomedical Services (1995, Kuala Lumpur); Cancer Center – Prefeasibility Study (1994, Kuala Lumpur); Selayang General Hospital (1992, Selangor State); Seven General District Hospitals – Masterplanning (1991, Kuala Lumpur); 71 Hospitals – Technical Operation Management (1990, Kuala Lumpur); Cardiothoracic Center (1990, Kuala Lumpur); Dr. Leela Ratos’ Private Hospital (1989, Kuala Lumpur); Kuala Lumpur General Hospital – MMIS and Upgrading (1988, Kuala Lumpur); Kuala Lumpur General Hospital – Master Study (1986, Kuala Lumpur)

Hospital Occidental, Managua

Nicaragua

Client

Ministry of Health

Key data

Design / Equip / Install / Maintain

Beds: 300
Gross Floor Area: 22,800 m²

Implementation: 2015 – 2017

The Project

VAMED supplied and installed medical and non-medical equipment at the Hospital Occidental de Managua, Nicaragua’s capital. The project included electromechanical planning, biomedical design, site management, and full commissioning. Located in an earthquake-prone area, the hospital was equipped with resilient infrastructure. The scope also covered 36 months of preventive and corrective maintenance to ensure continued performance and sustainability of operations.

Ayacucho Hospital

Peru

Client

Consortium Hospital Ayacucho

Key data

Equip / Install / Train / Maintain

Beds: 240
Gross Floor Area: 53,000 m²

Implementation: 2015 – 2018

The Project

VAMED carried out the supply, installation, and commissioning of medical and clinical equipment for the Regional Hospital in Ayacucho, one of the most advanced healthcare facilities in the area. Located in the capital of the Huamanga Province, the hospital plays a key role in regional healthcare delivery. The project included comprehensive staff training and a two-year program of preventive and corrective maintenance to ensure optimal operation of all systems.

Hospital Leonardo Martinez

Honduras

Client

Ministry of Health

Key data

Design / Equip / Train / Maintain

Beds: 400
Gross Floor Area: 68.000 m²

Implementation: 2011 – 2013

The Project

The Leonardo Martinez Hospital was VAMED’s first project in Honduras and the first financed through an Austrian soft loan. VAMED managed the project, including electromechanical planning, architectural design, and the supply, installation, and commissioning of medical equipment. To ensure long-term success, comprehensive staff training and a 36-month preventive and corrective maintenance program were included in the scope of services.

Quito 3 Hospitals

Ecuador

Client

Ministry of Health Ecuador

Key data

Equip / Install

Implementation: 2016

The Project

Supply and Installation of medical equipment for
– Hospital Pablo Arturo Suarez
– Teaching Hospital Calderón
– New Southern Maternity Hospital

Daniel Alcides Carrion Hospital, Callao

Peru

Client

Ministry of Health

Key data

Equip / Install / Commission 

Beds: 500

Implementation: 2010

The Project

Supply and Installation of medical equipment.

NEW AL AIN HOSPITAL (STMC)

United Arab Emirates

Client

SEHA (Main contractor ARABTECH – SAN JOSE JV)

Key data

Beds: 719
Gross Floor Area: 341,860.820 m²

Implementation: Ongoing / 2020-2026

The Project

The New Al Ain Hospital, now named STMC, in Abu Dhabi provides state-of-the-art medical care aligned with international standards. With 719 beds—including 510 for general care, 67 ICU, and 142 for rehabilitation—the facility features 104 specialized clinics, 12 operating theatres (including 1 hybrid), 20 radiology rooms, advanced endoscopy suites, a robotic pharmacy, and a hyperbaric chamber system. An educational and simulation center with training rooms and a central library is also included. VAMED’s scope covered supply, project management, engineering, IT integration, installation, staff training, and a 3-year comprehensive warranty for all medical equipment.

AL REEM HOSPITAL

United Arab Emirates

Client

Blue Apple Property Management LLC, UAE

Key data

Beds: 219
Gross Floor Area: 48,600 m²

Implementation: 2020

The Project

Reem Hospital comprises three advanced healthcare facilities operated by VAMED. The Family Medicine Centre (FMC) includes 32 clinics initially (expanding to 47), offering comprehensive specialty care with a focus on pediatrics. FMC physicians also access 25 acute care beds for short stays. The second facility is a 73-bed medical rehabilitation center providing intensive orthopedic, neurologic, cardiologic, and oncologic rehab for in- and out-patients. The third is a 119-bed specialized pediatrics and women’s hospital, operated with a leading clinical partner. VAMED aims to establish Reem Hospital as the top destination for rehabilitation services in the UAE and GCC.

THE ROYAL OMAN POLICE NEW HOSPITAL PROJECT (MEDICAL CITY HOSPITAL FROR MIL-ITARY & SECURITY SERVICES – MUSCAT)

Oman

Client

ROYAL OMAN POLICE. Contractor/ Client: GALFAR Engineering & Contracting SAOG

Key data

Beds: 459
Gross Floor Area: 185,000 m²

Implementation: 2020

The Project

In Muscat’s Airport Heights, the Sultanate of Oman is constructing the Royal Oman Police Hospital, spanning 185,000 m² with an initial capacity of 459 beds, expandable to 600. The hospital will serve military and security personnel and their families, offering care in oncology, traumatology, pediatrics, gynecology, cardiology, and surgery. VAMED was awarded project management and MEP systems supply, including Medical Gas Systems, Nurse Call System, Laminar Flow & Critical Environment Diffusers, and a Photovoltaic System. VAMED also handles the supply, installation, testing, commissioning, training, and 3-year warranty for the full Medical & Laboratory Equipment Package.

Ras Al Kahima Rashid Abdullah Hospital

United Arab Emirates

Client

China State Contraction Company LLC

Key data

Beds: 68
Gross Floor Area: 15,400 m²

Implementation: 2014

The Project

Supply and installation of medical equipment.

SEAWORLD

United Arab Emirates

Client

MIRAL. Contractor/ Client: ALEC

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: 2021-2023

The Project

Located on Yas Island, Abu Dhabi, SEAWORLD is a new indoor marine animal theme park opened in August 2023 under the SeaWorld Group license. VAMED Engineering was awarded the contract in April 2021 following a successful tender. The scope included project management, engineering, site supervision, and the supply, installation, testing, and commissioning of 485 medical and laboratory equipment line items. These serve the park’s animal care center, reproductive labs, and marine animal research medical center. The project was accepted in February 2023 and includes a 2-year comprehensive warranty. VAMED ensured high standards for animal health and research support.

Al Ahli Hospital

Qatar

Client

Al Ahli Hospital Corporation Q.S.C./ Contraco W.W.L., Qatar

Key data

Beds: 200
Gross Floor Area: N/A m²

Implementation: 2004

The Project

Project management for the complete project including main hospital building, intermediate care building, nurse residence, car parking and external works. Design, engineering, supply, installation, testing, training and commissioning of the complete medical equipment and furniture. warranty for 1 year.

Al Ain Hospital

United Arab Emirates

Client

Arabtec San Jose JV

Key data

Beds: 425
Gross Floor Area: –

Implementation: –

The Project

Total operation, modernisation of OT & ICU departments.

Hufuf Al Ahsa Hospital

Saudi Arabia

Client

Al Ahsa Medical Ltd.

Key data

Beds: 300
Gross Floor Area: – m²

Implementation: 2003

The Project

Project Management, Design, engineering, supply and installation of medical equipment, Training of personnel, maintenance for 1 year.

Multiprofile Hospital

Turkmenistan

Client

Ministry of Health

Key data

Beds: 400
Gross Floor Area: 41,156 m²

Implementation: 2021-2022

The Project

The Multiprofile Hospital in Türkmenbaşy is a modern medical center with 400 beds, which was opened in April 2022.
 
The seven-story hospital comprises 27 clinical departments and is equipped with modern medical technology, meeting international quality standards. Departments include, among others, emergency care, physiotherapy, dentistry, haemodialysis, as well as vari-ous specialties for inpatient and outpatient treatment.
 
VAMED Engineering acted as a medical equipment packer. The scope of the project in-cluded planning, delivery, and installation of medical and technical equipment. Addition-ally, it involved the implementation of advanced user and technician training.

Burns Center

Turkmenistan

Client

GAP Insaat Dubai

Key data

Beds: 130
Gross Floor Area: 24,500 m²

Implementation: 2019-2021

The Project

The Burn Center is a modern, five-story medical facility designed to treat burn injuries. It includes specialized departments such as emergency care, surgery, laboratory, rehabili-tation, and intensive care, endoscopy and has a capacity of 130 beds (20 for children, 80 for adults, and 30 for plastic reconstructive surgery and intense care).
 
VAMED supplied the consultative polyclinic, endoscopy, physiotherapy, hyperbaric chamber, balneology, function diagnostics, radiology, emergency and laboratories with medical equipment.

Cacuaco General Hospital

Angola

Client

GAP Insaat Dubai

Key data

Beds: N/A
Gross Floor Area: 9,650 m²

Implementation: 2019 – 2021

The Project

The new medical facility, which opened in 2010, is not only equipped with the newest technology, but also provides citizens in all health and wellness aspects with the highest quality of cosmetology services.
 
The scope of the Aesthetic center also includes trainings, consultations, courses and will be used for early detection of various diseases in feet, including signs that appear due to diabetes.

Moscow Medsi CDC

Russia

Client

Moscow Medsi CDC

Key data

Beds: 20
Gross Floor Area: 22,800 m²

Implementation: 2015

The Project

Supply and installation of medical equipment.

MCS Intermed Hospital

Mongolia

Client

MCS Intermed Hospital

Key data

Beds: 91
Gross Floor Area: 13.000 m2

Implementation: 2014

The Project

Hospital planning, supply & Installation of medical equipment.

AVA Peter Nord (Phase 2)

Russia

Client

AVA Peter LTD

Key data

Beds: 51
Gross Floor Area: 6,400 m²

Implementation: 2015 – 2019

The Project

In Phase 2 the following departments and functions were executed by VAMED on a turn-key basis in the center for Woman´s Health:
• IVF (in-vitro fertilization)
• Gynecology, obstetrics and maternity wards (51 beds)
• Delivery (4 delivery rooms) with 3 operation
theatres
• ICU (6 beds) and NICU (6 rooms)
• Polyclinic (90 visits per shift) and physiotherapy
• Genetic laboratory
• Administrative rooms

Morphology Center

Turkmenistan

Client

GAP Insaat Dubai

Key data

Beds: N/A
Gross Floor Area: N/A m²

Implementation: 2016 – 2017

The Project

The Morphology Center, opened in July 2016 during the “Health” exhibition, is the first facility of its kind in Turkmenistan. It combines university-level training in anatomy, classical and molecular pathology, and forensic medicine. Highlights include virtual anatomy workstations, allowing students and future forensic doctors to perform 3D virtual examinations of the human body. The center also features advanced forensic capabilities, including state-of-the-art chromatography for detecting substances like drugs and alcohol, virtual autopsies using CT, and a high-tech electronic facial reconstruction system. This unique facility marks a major advancement in medical and forensic sciences in Turkmenistan.

Nork Marash Medical Centre

Armenia

Client

Nork Marash Medical Centre

Key data

Beds: 75
Gross Floor Area: –

Implementation: 2018

The Project

Supply and installation of medical equipment.

Diagnostic Center Moscow

Russia

Client

Medsi Ltd, Russia

Key data

Beds: 20
Gross Floor Area: 22,800 m²

Implementation: 2013 – 2015

The Project

Serving as the largest private healthcare chain in the country, medical equipment, supplied by VAMED, raised the level of healthcare services.

The project «Clinical Diagnostic Center MEDSI in Krasnaya Presnya» won the city planning contest in the subcategory «The Best Project in the Health Sector», organized by the Ministry of Construction of the Russian Federation.
 
In January 2016 the clinic opened consultation rooms in all medical areas with expert-level equipment. The clinics daily average patients grew from 31 in 2016 to around 700 in December of that very same year. In total the Hospital was functioning for more then 38,000 patients through the year.

AVA Peter Nord (Phase 1)

Russia

Client

AVA Peter LTD

Key data

Beds: 120
Gross Floor Area: 11,500 m²

Implementation: 2014

The Project

AVA-Peter clinic in St. Petersburg was opened in 1996. It is part of the international network of AVA clinics in Europe and Russia, which all offer IVF treatments at the same highest medical level.
 
In Russia, the AVA-Peter clinic is known for its modern high-tech laboratory, the skilled embryologists, and the highly qualified medical staff, so that couples from all over Russia can turn to the AVA-Peter clinic in case IVF has failed in other places.
 
In Phase 1 VAMED supplied medical equipment for the outpatient clinic, emergency department, surgery block, imaging department and laboratory also supporting services like kitchen, laundry, disinfection & waste management, and pharmacy.
 

Dental Center Ashgabat

Turkmenistan

Client

GAP Insaat Dubai

Key data

Beds: 47
Gross Floor Area: N/A m²

Implementation: 2012 – 2013

The Project

The Dental Center in Ashgabat, completed in 2013, is next to a surgery and endocrinology center, a mother and child diagnostic center, a medical facility, a center for neurology, and just eight minutes away from the city center of Turkmenistan.
 
VAMED was responsible for planning and supplying this facility with medical and technical equipment. The scope not only included a two year warranty but also included the installation of equipment, testing and commissioning, and lastly the training of staff.
 

Hawari Hospital, Benghazi

Libya

Client

PWA (Public Works Authorities)

Key data

Beds: 520
Gross Floor Area: –

Implementation: 2008

The Project

Upgrade of the civil, mechanical, and electrical installations of the existing hospital. Training of personnel and warranty for 1 year.

Al Essra Hospital

Jordan

Client

Al Essra Committee.

Key data

Beds: 100
Gross Floor Area: –

Implementation: 2001

The Project

Supply, installation and commissioning of medical equipment, training of hospital personnel.

Erzincan World Bank Project

Turkey

Client

World Bank.

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1996

The Project

Design, engineering and supervision of 3 hospitals.

3 Hospitals - Turkey

Turkey

Client

Ministry of Health

Key data

Beds: 350
Gross Floor Area: –

Implementation: 1990

The Project

Supply and instalation of medical equipment for hospitals in Milas, Polatli and Susheri.

e-Health Project

Kosovo

Client

Ministry of Health

Key data

Beds: 72
Gross Floor Area: N/A m²

Implementation: 2014 – 2017

The Project

Kosovo is implementing a broad initiative called “Health Support Programme in Kosovo” with the goal to improve the health status of the Kosovarian people in order to:
• Reduce morbidity and mortality of the population
• Improve management of the existing resources and quality of services
• Implement and develop the health information system
• Complete the functioning and reorganization of the existing infrastructure of the health care system and improve procurement of medical equipment
• Develop a sustainable funding system for the health sector
Data processing is done via a service-oriented IT architecture comprising:
• Web-based and desktop applications
• Centralized data storage
•Electronic health record in international standard
• Restricted access to clinical data (diagnosis, procedures, etc.
• The system is able to operate dynamic workflows
• Medical records are customizable during operation
• Access to the system is monitored, controlled and restricted in an appropriate manner according to ISO 27001 standard
Finally, the system will serve 72 health care facilities, 1,100 medical doctors and 3,000 nurses.
 

Jagiellonian University Hospital (NSSU)

Poland

Client

University Hospital Krakow-Prokocim, Poland

Key data

Beds: 892
Gross Floor Area: N/A m²

Implementation: 2015 – 2019

The Project

In early May 2015, a festive groundbreaking ceremony was held for the new main location of the Jagiellonian University Hospital (NSSU) at the Krakow-Prokocim site. The central building complex will in future house 892 beds, 24 operating rooms, outpatient departments, as well as research and teaching facilities. Within a pan-European Consortium, VAMED was responsible for the redesign the renowned Hospital, as well as for medical technology equipment. Located in the Prokocim district since 1966, the UniversityHospital caters for all general medical needs and has built up a reputation for its specialization in pediatrics and as a teaching and research institution.
 

Bratislava Radiotherapy Center

Slovakia

Client

National Oncological Institute Bratislava.

Key data

Beds: 30
Gross Floor Area: –

Implementation: 1996

The Project

Supply of medical equipment. General contractor and responsible for the complete design, construction, electro-mechanical systems and medical equipment supply.

Cardiac Center Minsk

Belarus

Client

Department of Health of Minsk

Key data

Beds: –
Gross Floor Area: –

Implementation: 2000

The Project

Supply and installation of medical and electro-mechanical equipment for the Cardiac Center of the 4th Minsk Clinic.
Training of personnel and 1 year guarantee.
Scroll to Top